Friday, January 19, 2024, 10:20, Darwin Ortiz Rosales, Fixed, , Glovebox regeneration (B1 L06, Hotlab)
|
Friday, January 19, 2024, 10:19
This is a belated entry. The regeneration was performed successfully on December 20th, 2023. |
Tuesday, March 12, 2024, 15:21, Darwin Ortiz Rosales, Fixed, , Glovebox regeneration and O2 sensor replacement(B1 L06, Hotlab)
|
Tuesday, March 12, 2024, 15:21
Hotlab ISAC1 B1
Normal
0
|
Monday, April 15, 2024, 10:52, Aaron Schmidt, Fixed, , Ar Glove box RP swapped.
|
Monday, April 15, 2024, 10:50: The old IDP15 RP was not pumping the antechamber down properly. An exchange IDP15 pump is loaned to us from vacuum
group. Once the tip seals on it are replaced, we will swap it again.
Applicable work permit: I |
Thursday, June 20, 2024, 13:33, Darwin Ortiz Rosales, Fixed, , Glovebox inspection ISAC1 B1 L06
|
Thursday, June 20, 2024, 13:28
All lines, pump, blower, were found in working condition. From a previous issue with corrosion
of lines connecting pumps, it is recommended that we check the ability of the pump to achieve full vacuum during inspections. Currently full vacuum |
Tuesday, October 15, 2024, 09:21, Darwin Ortiz Rosales, Fixed, , Hotlab glovebox catalyst regeneration
|
Tuesday, October 15, 2024, 09:22
The glovebox catalyst was regenerated. No issues. Removed TCE and PVB from inside the glovebox. These were vestiges from the
previous UCx production process. |
Monday, December 16, 2024, 12:15, Aaron Schmidt, Completed, , Q4 - 2024 Ball Mill Calibration & Inspection
|
Fritsch Pulverisette 5 Ball Mill status:
Monday, December 16, 2024, 12:12:
SN 05.6010 / 03005: Inspected. Ok. |
Wednesday, March 30, 2011, 16:47, John Wong, , , All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down
|
All the fumehood pumps in the ISAC-I hot and cold labs got tripped off when the MCC-X was powered down (See ISAC WP#2011-03-30-5). No reaction
process is done inside the fumehoods, so the pumps are ok to be left off for now until the MCC-X work is done. |
Tuesday, April 12, 2011, 12:03, John Wong, , , Hot Lab Glove Box Regeneration
|
Tue Apr 12 12:00:52 2011: The hot lab glove box regeneration was started yesterday (April 11, 2011). "Before regeneration, the O2 level
was 97 ppm, The H2O level was 47 ppm. After restarting circulation through the dry train, the levels immediately started dropping. At 11:30 today,
the O2 was @ 1.76 ppm, the H2O @ 11.2 ppm." (Marik). |
Tuesday, April 12, 2011, 12:07, John Wong, , , All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down
|
John Wong wrote:
All the fumehood pumps in the ISAC-I hot and cold labs got tripped off when the MCC-X was powered down (See ISAC WP#2011-03-30-5). |
Wednesday, April 13, 2011, 13:54, John Wong, , , Cloth booties now avaiable for hotlab
|
Wed Apr 13 13:53:46 2011
I've setup a box of cloth booties for entering the hotlab. They are
washable so please use them. I also have some paper booties there if
you
like using them, but it can be costly to keep stocking them up, plus the
fee to throw them away.
As per RPG, before you exit the hotlab please |
Tuesday, February 28, 2012, 12:01, John Wong, , , TIS/RH Users
|
Tuesday, February 28, 2012, 11:31
Hi All,
Hope you all find the TIS/RH elog useful :) There are a few things I want to share with you. |
Friday, March 15, 2013, 13:55, Anders Mjos, , , Non active water off for a short time (10 - 15 min)
|
ISAC operations called to check that equipment in the labs were OK for the non active water to be off for a short time. I gave the OK after having checked
that both evaporators are off. The system will be bled for air. |
Wednesday, November 26, 2014, 14:01, Laura Lambert, , ,
|
|
Tuesday, August 08, 2017, 14:55, Laura Lambert, , , Glove box Alarm
|
Tuesday, August 08, 2017, 14:28
Alarm for glove box went off this afternoon.
1person went to put arms in and alarm sounded. |
Wednesday, December 20, 2017, 09:16, Laura Lambert, , , RETURN and SUPPLY valves CLOSED for xmas break for both evap1 and evap2
|
Wednesday, December 20, 2017, 09:02
Replaced Argon tank for glove box, full tank of Ar ~2350psi.
Wednesday, January 3, 2018, 11:59 |
Tuesday, January 23, 2018, 11:58, Laura Lambert, , , All BeO removed from Labs!
|
Tuesday, January 23, 2018, 11:55
Portable glove box with everything inside, contaminated beakers, pellets and BeO dissolved in acid were all removed from the cold lab today!!!
Transported for waste removal. |
Wednesday, January 31, 2018, 13:35, Laura Lambert, , , New lab safety mirrors installed in hot lab
|
Wednesday, January 31, 2018, 13:31
3 x lab safety mirrors have been installed in the hot lab, now all locations in the lab are visible from the door.
First mirrow in 1st photo allows visibility behind evap1; second and third mirrors in 2nd photo shows visibility between glove box and evap2, as |
Thursday, February 07, 2019, 10:42, Aaron Schmidt, , , Argon Glove box leak / regeneration failure 7x
|
A regeneration of the Ar Glove box had been performed Monday, 04, Feb, 2019. At some point during the night of the 4/5, a leak of volatile materials
burst out of the vent line inside the control box housing the fuses, solenoid valves, & electrical components. The volatile liquid, determined to likely |
Thursday, March 21, 2019, 07:43, Aaron Schmidt, , , Argon Glove box repair & link to nuclear ventilation 6x
|
The Ar glove box issues ( https://elog.triumf.ca/TIS/General/23 ) have been fixed.
Quoted from work permit: I2019-03-19-4
RPG checked the old SS lines. They |
Friday, July 26, 2019, 13:06, Aaron Schmidt, , , Q2 - 2019 Ball Mill Calibration & Inspection
|
Fritsch Pulverisette 5 Ball Mill status:
SN 05.6010 / 03005: Inspected July 5, 2019. Ok
|
|