  Evaporator_2, Page 9 of 34  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Target Material Target Oven W.O# Sourcedown Status Subject Text Attachments
  614   Thursday, March 09, 2023, 06:58 Darwin Ortiz RosalesEndcaps TARGET BOATDoneTaC coated endcaps and spring sinteringThursday,
March 09, 2023, 06:53
2 TaC coated springs and  12
  
  620   Wednesday, April 12, 2023, 09:53 Darwin Ortiz RosalesTaC TARGET BOATDoneTaC coating sintering
Wednesday, April 12, 2023, 09:53
The coated container was wrapped
in 3 Ta foil heatshields.
  
  632   Friday, April 28, 2023, 11:31 Darwin Ortiz RosalesTaCBoatTARGET BOATDoneTaC coated endcaps and spring sinteringFriday, April 28, 2023, 11:29
loaded 14 TaC coated end caps and
2 TaC coated springs.
  
  633   Tuesday, May 02, 2023, 14:20 John Wongnp-TiO2 TARGET BOATIn progressCarbonization of np-TiO2 spun fibrous pellets/fibre matsTuesday, May 02, 2023, 14:03
Two np-TiO2 spun fibrous pellets
and 1 batch of fibre mats were wrapped with
 7x 
  636   Tuesday, June 06, 2023, 09:14 Darwin Ortiz RosalesC44139-4TARGET BOATDoneGraphite inside insert Experiment 2 (regular formulation discs)Tuesday, June 06, 2023, 09:11
A Ta container tube was wrapped with
4 Ta heatshields.  Note final
  
  637   Thursday, June 08, 2023, 09:29 Darwin Ortiz RosalesTaC TARGET BOATDoneTaC coated endcaps and spring sintering (new TaC)Thursday, June 08, 2023, 09:28
Using smaller particle size TaC no
ball mill procedure.
  
  639   Tuesday, August 15, 2023, 12:03 Darwin Ortiz RosalesTaC44692-11TARGET BOATDoneTaC coating sinteringTuesday, August 15, 2023, 10:48
The coated container was wrapped
in 4 Ta foil heatshields.
  
  640   Tuesday, August 22, 2023, 09:35 Darwin Ortiz RosalesTaC44692-11TARGET BOATDoneTaC coating sintering (second coating on same tube)Tuesday, August 22, 2023, 09:29
The coated container was wrapped
in 4 Ta foil heatshields.
  
  661   Tuesday, May 07, 2024, 06:20 Darwin Ortiz RosalesTaC TARGET BOATDoneSintering TaC coating on endcapsTuesday, May 07, 2024, 06:16
TP was swapped on previous day (May
6th)
  
  666   Thursday, July 25, 2024, 15:46 Angelina Chennp-Ta TARGET BOATIn progressCarbonization of Heat Stabilized np-Ta Fibres Disk (1st Attempt) Thursday, July 25, 2024, 15:18
Target container consists of two
np-Ta fibres disk samples. Both disks are
  
  667   Friday, July 26, 2024, 10:05 John Wongnp-Ta TARGET BOATDoneCarbonization of Heat Stabilized np-Ta Fibres Disk (1st Attempt)

    

       
            
 Screenshot_2024-07-26_170518.pngScreenshot_2024-07-28_112630.pngScreenshot_2024-07-31_112557.pngScreenshot_2024-07-31_171808.png 
  673   Monday, August 19, 2024, 13:17 John Wongnp-Ta TARGET BOATIn progressCarbonization of heat stabilized np-Ta fibres - 2nd AttemptMonday, August 19, 2024, 13:06
Target container consists of 2 samples,
and both samples were heat stabilized at
 Capture.PNG 
  677   Tuesday, September 10, 2024, 13:16 Darwin Ortiz RosalesEndcaps TARGET BOATDoneTaC coating sinteringA boat lined up with graphite and wrapped
in 3 Ta heatshileds
Vacuum IGP1 initial =6.1 e-06 Torr
  
  4   Tuesday, February 28, 2012, 11:00 John WongEmptyTest oven LP-SISDoneMeasuring temperatures, currents & voltages Tuesday, February 28, 2012, 10:36
Two thermocouples were inserted through
the left side of the copper heat shield,
 Evap_2_thermocouple.jpg 
  45   Wednesday, August 22, 2012, 17:36 John WongEmpty39165-5LP-SISDoneCoating target oven /w TaC & sintering for UCx#5Wednesday, August 22, 2012, 17:25
Note:  LP-FEBIAD target container
( W.O#37918-3) was coated with TaC and sintered
  
  51   Wednesday, October 10, 2012, 16:37 John WongEmpty39165-4LP-SISDoneCoating target oven /w TaC & sintering for TiC#3Wednesday, October 10, 2012, 16:35
Target container is coated with TaC. 
No Ta-heat shields are used.
 striptool_archiver_container_TaC_coating.PNG 
  52   Tuesday, October 16, 2012, 14:18 John WongTiC39165-4LP-SISDoneSintering TiC#3Tuesday, October 16, 2012, 14:12
Target is filled with 360 discs of
TiC (with 1 mole of graphite) backed on C-grv
 TiC#3_maxcurrent.PNG 
  56   Tuesday, January 22, 2013, 16:14 John Wong  LP-SISDoneHeating RFQ components & measuring temperatures Tuesday, January 22, 2013, 12:38
This is to test the newly developed
RFQ target to be commissioned this year.
 2169.jpgautorampingup_800.PNG 
  57   Monday, February 18, 2013, 16:43 John WongEmpty LP-SISDoneSintering TaC coating on the RFQ target container Monday, February 18, 2013, 16:28
The RFQ target container is coated
with TaC and ready to be sintered.  No
 SiC#28_-_LPSIS-RFQ.pngSintering_of_TaC.PNGautorampingdown_10.PNG 
  58   Friday, February 22, 2013, 15:55 John WongSiC LP-SISDoneSintering SiC#28-RFQFriday, February 22, 2013, 15:49
The LP-SIS RFQ target container was
previously coated with TaC and sintered up
 RFQ_SiC#28_-production_process.mp4 
ELOG V2.9.2-2455