614
|
Thursday, March 09, 2023, 06:58 |
Darwin Ortiz Rosales | Endcaps | | TARGET BOAT | Done | TaC coated endcaps and spring sintering | Thursday,
March 09, 2023, 06:53
2 TaC coated springs and 12 |
|
620
|
Wednesday, April 12, 2023, 09:53 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | TaC coating sintering |
Wednesday, April 12, 2023, 09:53
The coated container was wrapped
in 3 Ta foil heatshields. |
|
632
|
Friday, April 28, 2023, 11:31 |
Darwin Ortiz Rosales | TaC | Boat | TARGET BOAT | Done | TaC coated endcaps and spring sintering | Friday, April 28, 2023, 11:29
loaded 14 TaC coated end caps and
2 TaC coated springs. |
|
633
|
Tuesday, May 02, 2023, 14:20 |
John Wong | np-TiO2 | | TARGET BOAT | In progress | Carbonization of np-TiO2 spun fibrous pellets/fibre mats | Tuesday, May 02, 2023, 14:03
Two np-TiO2 spun fibrous pellets
and 1 batch of fibre mats were wrapped with |
7x |
636
|
Tuesday, June 06, 2023, 09:14 |
Darwin Ortiz Rosales | C | 44139-4 | TARGET BOAT | Done | Graphite inside insert Experiment 2 (regular formulation discs) | Tuesday, June 06, 2023, 09:11
A Ta container tube was wrapped with
4 Ta heatshields. Note final |
|
637
|
Thursday, June 08, 2023, 09:29 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | TaC coated endcaps and spring sintering (new TaC) | Thursday, June 08, 2023, 09:28
Using smaller particle size TaC no
ball mill procedure. |
|
639
|
Tuesday, August 15, 2023, 12:03 |
Darwin Ortiz Rosales | TaC | 44692-11 | TARGET BOAT | Done | TaC coating sintering | Tuesday, August 15, 2023, 10:48
The coated container was wrapped
in 4 Ta foil heatshields. |
|
640
|
Tuesday, August 22, 2023, 09:35 |
Darwin Ortiz Rosales | TaC | 44692-11 | TARGET BOAT | Done | TaC coating sintering (second coating on same tube) | Tuesday, August 22, 2023, 09:29
The coated container was wrapped
in 4 Ta foil heatshields. |
|
661
|
Tuesday, May 07, 2024, 06:20 |
Darwin Ortiz Rosales | TaC | | TARGET BOAT | Done | Sintering TaC coating on endcaps | Tuesday, May 07, 2024, 06:16
TP was swapped on previous day (May
6th) |
|
666
|
Thursday, July 25, 2024, 15:46 |
Angelina Chen | np-Ta | | TARGET BOAT | In progress | Carbonization of Heat Stabilized np-Ta Fibres Disk (1st Attempt) | Thursday, July 25, 2024, 15:18
Target container consists of two
np-Ta fibres disk samples. Both disks are |
|
667
|
Friday, July 26, 2024, 10:05 |
John Wong | np-Ta | | TARGET BOAT | Done | Carbonization of Heat Stabilized np-Ta Fibres Disk (1st Attempt) |
|
|
673
|
Monday, August 19, 2024, 13:17 |
John Wong | np-Ta | | TARGET BOAT | In progress | Carbonization of heat stabilized np-Ta fibres - 2nd Attempt | Monday, August 19, 2024, 13:06
Target container consists of 2 samples,
and both samples were heat stabilized at |
|
677
|
Tuesday, September 10, 2024, 13:16 |
Darwin Ortiz Rosales | Endcaps | | TARGET BOAT | Done | TaC coating sintering | A boat lined up with graphite and wrapped
in 3 Ta heatshileds
Vacuum IGP1 initial =6.1 e-06 Torr |
|
4
|
Tuesday, February 28, 2012, 11:00 |
John Wong | Empty | Test oven | LP-SIS | Done | Measuring temperatures, currents & voltages | Tuesday, February 28, 2012, 10:36
Two thermocouples were inserted through
the left side of the copper heat shield, |
|
45
|
Wednesday, August 22, 2012, 17:36 |
John Wong | Empty | 39165-5 | LP-SIS | Done | Coating target oven /w TaC & sintering for UCx#5 | Wednesday, August 22, 2012, 17:25
Note: LP-FEBIAD target container
( W.O#37918-3) was coated with TaC and sintered |
|
51
|
Wednesday, October 10, 2012, 16:37 |
John Wong | Empty | 39165-4 | LP-SIS | Done | Coating target oven /w TaC & sintering for TiC#3 | Wednesday, October 10, 2012, 16:35
Target container is coated with TaC.
No Ta-heat shields are used. |
|
52
|
Tuesday, October 16, 2012, 14:18 |
John Wong | TiC | 39165-4 | LP-SIS | Done | Sintering TiC#3 | Tuesday, October 16, 2012, 14:12
Target is filled with 360 discs of
TiC (with 1 mole of graphite) backed on C-grv |
|
56
|
Tuesday, January 22, 2013, 16:14 |
John Wong | | | LP-SIS | Done | Heating RFQ components & measuring temperatures | Tuesday, January 22, 2013, 12:38
This is to test the newly developed
RFQ target to be commissioned this year. |
|
57
|
Monday, February 18, 2013, 16:43 |
John Wong | Empty | | LP-SIS | Done | Sintering TaC coating on the RFQ target container | Monday, February 18, 2013, 16:28
The RFQ target container is coated
with TaC and ready to be sintered. No |
|
58
|
Friday, February 22, 2013, 15:55 |
John Wong | SiC | | LP-SIS | Done | Sintering SiC#28-RFQ | Friday, February 22, 2013, 15:49
The LP-SIS RFQ target container was