ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
|
589
|
Thursday, August 25, 2022, 10:16 |
Darwin Ortiz Rosales | TiC | 44692-10 | HP-FEBIAD | Done | TiC 220818 Sintering (TiC #6) | Thursday, August 25, 2022, 10:06
Target container is loaded with 379 |
|
|
554
|
Thursday, September 02, 2021, 07:14 |
Darwin Ortiz Rosales | TaC | 44691-7 | LP-SIS | Done | TaC coating/sintering | Thursday, September 02, 2021, 06:36
Ta tube was coated with TaC |
|
|
533
|
Tuesday, March 02, 2021, 11:32 |
Darwin Ortiz Rosales | TaC | 44691-5 | LP-SIS | Done | TaC coating/sintering | Tuesday, March 02, 2021, 11:26
Ta tube was coated with TaC |
|
|
551
|
Wednesday, June 23, 2021, 17:48 |
Aaron Schmidt | Ta | 44691-4 | LP-SIS | In progress | Conditioning Ta#62 (Replacement) | Ta#62 LP-SIS target
description: (REPLACEMENT FOR 44139-10) |
|
|
560
|
Wednesday, October 27, 2021, 11:09 |
Darwin Ortiz Rosales | Ta | 44691-3 | LP-SIS | Done | TaC coating/sintering | Wednesday, October 27, 2021, 11:07
Monday, October 25, 2021, 11:52 |
|
|
553
|
Thursday, August 05, 2021, 11:18 |
Darwin Ortiz Rosales | SiC | 44691-2 | LP-SIS | Done | Dr blade and non-Dr blade Material Experiment (sintering) | Thursday, August 05, 2021, 11:10
Total number of foils: 380
Total length packed 13.5 cm |
|
|
590
|
Thursday, September 01, 2022, 12:32 |
Darwin Ortiz Rosales | TaC | 44691-13 | LP-SIS | Done | TaC coating sintering | Thursday, September 01, 2022, 10:34
The coated container was wrapped
in three Ta foil heatshields. |
|
|
577
|
Thursday, June 02, 2022, 16:53 |
Aaron Schmidt | Ta | 44691-12 | LP-SIS | In progress | Conditioning Ta#64 | Ta#64 LP-SIS target
description: |
|
|
564
|
Wednesday, November 10, 2021, 18:07 |
Aaron Schmidt | Ta | 44691-11 | LP-SIS | In progress | Conditioning Ta#63 | Ta#63 LP-SIS target description:
|
|
|
562
|
Wednesday, November 03, 2021, 09:24 |
Darwin Ortiz Rosales | Empty | 44691-10 | LP-SIS | Done | TaC coating/sintering | Ta tube was coated with
TaC and wrapped with Ta heat-shields (3 layers) |
|
|
534
|
Friday, March 05, 2021, 10:48 |
Darwin Ortiz Rosales | TaC | 44691-1 | LP-SIS | Done | TaC coating/sintering | Friday, March 05, 2021, 10:47
Ta tube was coated with TaC |
|
|
561
|
Monday, November 01, 2021, 07:39 |
Darwin Ortiz Rosales | Empty | 44508-3 | LP-SIS | Done | TaC coating/sintering | Monday, November 01, 2021, 07:37
Ta tube was coated with TaC |
|
|
519
|
Wednesday, October 21, 2020, 14:39 |
Aaron Schmidt | Nb | 44508-2 | LP-SIS | In progress | Conditioning Nb#9 | Nb#9 LP-SIS target description:
|
|
|
513
|
Tuesday, October 06, 2020, 14:23 |
Aaron Schmidt | Ta | 44508-1 | LP-SIS | In progress | Conditioning Ta#61 | Ta#61 LP-SIS target description:
Total Ta foils = 470 [6x20 packs |
|
|
498
|
Wednesday, August 12, 2020, 11:57 |
Marla Cervantes | Empty | 44489-9 | TARGET BOAT | Done | Pristine Ta tube calibration | Short oven loaded with additional
hardware are spacers into the flex-line HS.
|
|
|
502
|
Wednesday, August 26, 2020, 10:27 |
Marla Cervantes | | 44489-8 | | Done | C-Cartridge test #2 | Wednesday, August 26, 2020, 10:26
A Ta short tube was loaded with |
|
|
542
|
Friday, March 26, 2021, 16:23 |
Marla Cervantes | Empty | 44489-7 | | Done | Re-coat 2 | Objective: Coating the inner surface of
a tantalum tube to make a destructive test
and use a reference for the tantalum boats |
|
|
538
|
Tuesday, March 23, 2021, 11:28 |
Marla Cervantes | Empty | 44489-6 | | Done | Re-coating test 3 | Objective: Coating the inner surface of
a short tantalum boat with rhenium.
Result: |
|
|
541
|
Friday, March 26, 2021, 13:58 |
Marla Cervantes | Empty | 44489-6 | | Done | Re-coat 1 | Friday, March 26, 2021, 13:55
Yesterday a heat shield was installed
in the EVAP2. |
|
|
504
|
Monday, August 31, 2020, 12:57 |
Marla Cervantes | | 44489-15 | | Done | TaC coating heating test | Monday, August 31, 2020, 12:23
A short naked Ta tube (no heat shielding),
previously coated with TaC was set under |
|