ID Date Author Target Material Target Oven W.O#down Source Status Subject Text Attachments
  631   Friday, April 28, 2023, 09:39 Darwin Ortiz RosalesTiC44692-5LP-FEBIADDoneTiC230425


   
        
            
 MicrosoftTeams-image_(20).png 
  611   Wednesday, March 01, 2023, 21:49 Darwin Ortiz RosalesTa44692-3HP-SISDoneTaC coating sinteringWednesday, March 01, 2023, 21:46
Ta HP-SIS was coated
  
  613   Monday, March 06, 2023, 21:34 Darwin Ortiz RosalesSiC44692-3HP-SISDone230306SiC conditioningMonday, March 06, 2023, 21:29
Total number of foils:382
  
  615   Sunday, March 12, 2023, 08:06 Darwin Ortiz RosalesTa44692-2HP-SISDoneTaC coating sinteringSunday, March 12, 2023, 08:04
Ta HP-SIS was coated
  
  616   Monday, March 13, 2023, 22:31 Darwin Ortiz RosalesSiC44692-2HP-SISDoneSiC-230313Monday, March 13, 2023, 22:28
Total number of foils:380
  
  602   Thursday, November 17, 2022, 08:14 Darwin Ortiz RosalesTaC44692-12TARGET BOATDoneTaC coating sinteringThursday, November 17, 2022, 08:11
The coated container was wrapped
in four Ta foil heatshields.
  
  639   Tuesday, August 15, 2023, 12:03 Darwin Ortiz RosalesTaC44692-11TARGET BOATDoneTaC coating sinteringTuesday, August 15, 2023, 10:48
The coated container was wrapped
in 4 Ta foil heatshields.
  
  640   Tuesday, August 22, 2023, 09:35 Darwin Ortiz RosalesTaC44692-11TARGET BOATDoneTaC coating sintering (second coating on same tube)Tuesday, August 22, 2023, 09:29
The coated container was wrapped
in 4 Ta foil heatshields.
  
  654   Wednesday, February 07, 2024, 22:49 Darwin Ortiz RosalesTiC44692-11LP TUBEDone240206TiC conditioning
Wednesday, February 07, 2024, 22:36
Ta container tube TaC coated, wrapped
in 4 Ta foil heat-shields, and loaded with
  
  586   Wednesday, June 29, 2022, 10:12 Darwin Ortiz RosalesTaC44692-10HP-FEBIADDoneTaC coating sinteringWednesday, June 29, 2022, 10:07
Ta HP-FEBIAD was coated
  
  589   Thursday, August 25, 2022, 10:16 Darwin Ortiz RosalesTiC44692-10HP-FEBIADDoneTiC 220818 Sintering (TiC #6)Thursday, August 25, 2022, 10:06
 
Target container is loaded with 379
  
  554   Thursday, September 02, 2021, 07:14 Darwin Ortiz RosalesTaC44691-7LP-SISDoneTaC coating/sintering Thursday, September 02, 2021, 06:36
Ta tube was coated with TaC
 coating44691-7.PNG 
  533   Tuesday, March 02, 2021, 11:32 Darwin Ortiz RosalesTaC44691-5LP-SISDoneTaC coating/sinteringTuesday, March 02, 2021, 11:26 
Ta tube was coated with TaC
  
  551   Wednesday, June 23, 2021, 17:48 Aaron SchmidtTa44691-4LP-SISIn progressConditioning Ta#62 (Replacement) Ta#62 LP-SIS target
description: (REPLACEMENT FOR 44139-10)
 Ta#62_conditioning_-_Evap_2_-_44691-4.docx 
  560   Wednesday, October 27, 2021, 11:09 Darwin Ortiz RosalesTa44691-3LP-SISDoneTaC coating/sintering Wednesday, October 27, 2021, 11:07
Monday, October 25, 2021, 11:52
  
  553   Thursday, August 05, 2021, 11:18 Darwin Ortiz RosalesSiC44691-2LP-SISDoneDr blade and non-Dr blade Material Experiment (sintering)Thursday, August 05, 2021, 11:10
Total number of foils: 380
Total length packed 13.5 cm
 image_2021-08-09_221014.png 
  590   Thursday, September 01, 2022, 12:32 Darwin Ortiz RosalesTaC44691-13LP-SISDoneTaC coating sinteringThursday, September 01, 2022, 10:34
The coated container was wrapped
in three Ta foil heatshields.
 MicrosoftTeams-image_(13).png 
  577   Thursday, June 02, 2022, 16:53 Aaron SchmidtTa44691-12LP-SISIn progressConditioning Ta#64 Ta#64 LP-SIS target
description: 
  
  564   Wednesday, November 10, 2021, 18:07 Aaron SchmidtTa44691-11LP-SISIn progressConditioning Ta#63Ta#63 LP-SIS target description: 
  
  562   Wednesday, November 03, 2021, 09:24 Darwin Ortiz RosalesEmpty44691-10LP-SISDoneTaC coating/sintering Ta tube was coated with
TaC and wrapped with Ta heat-shields (3 layers)
  