Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 6 of 34  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O#down Source Status Subject Text Attachments
  589   Thursday, August 25, 2022, 10:16 Darwin Ortiz RosalesTiC44692-10HP-FEBIADDoneTiC 220818 Sintering (TiC #6)Thursday, August 25, 2022, 10:06
 
Target container is loaded with 379
  
  554   Thursday, September 02, 2021, 07:14 Darwin Ortiz RosalesTaC44691-7LP-SISDoneTaC coating/sintering Thursday, September 02, 2021, 06:36
Ta tube was coated with TaC
 coating44691-7.PNG 
  533   Tuesday, March 02, 2021, 11:32 Darwin Ortiz RosalesTaC44691-5LP-SISDoneTaC coating/sinteringTuesday, March 02, 2021, 11:26 
Ta tube was coated with TaC
  
  551   Wednesday, June 23, 2021, 17:48 Aaron SchmidtTa44691-4LP-SISIn progressConditioning Ta#62 (Replacement) Ta#62 LP-SIS target
description: (REPLACEMENT FOR 44139-10)
 Ta#62_conditioning_-_Evap_2_-_44691-4.docx 
  560   Wednesday, October 27, 2021, 11:09 Darwin Ortiz RosalesTa44691-3LP-SISDoneTaC coating/sintering Wednesday, October 27, 2021, 11:07
Monday, October 25, 2021, 11:52
  
  553   Thursday, August 05, 2021, 11:18 Darwin Ortiz RosalesSiC44691-2LP-SISDoneDr blade and non-Dr blade Material Experiment (sintering)Thursday, August 05, 2021, 11:10
Total number of foils: 380
Total length packed 13.5 cm
 image_2021-08-09_221014.png 
  590   Thursday, September 01, 2022, 12:32 Darwin Ortiz RosalesTaC44691-13LP-SISDoneTaC coating sinteringThursday, September 01, 2022, 10:34
The coated container was wrapped
in three Ta foil heatshields.
 MicrosoftTeams-image_(13).png 
  577   Thursday, June 02, 2022, 16:53 Aaron SchmidtTa44691-12LP-SISIn progressConditioning Ta#64 Ta#64 LP-SIS target
description: 
  
  564   Wednesday, November 10, 2021, 18:07 Aaron SchmidtTa44691-11LP-SISIn progressConditioning Ta#63Ta#63 LP-SIS target description: 
  
  562   Wednesday, November 03, 2021, 09:24 Darwin Ortiz RosalesEmpty44691-10LP-SISDoneTaC coating/sintering Ta tube was coated with
TaC and wrapped with Ta heat-shields (3 layers)
  
  534   Friday, March 05, 2021, 10:48 Darwin Ortiz RosalesTaC44691-1LP-SISDoneTaC coating/sintering Friday, March 05, 2021, 10:47
Ta tube was coated with TaC
 2021-03-07_090107-44691-1_Tac_Sintering.png 
  561   Monday, November 01, 2021, 07:39 Darwin Ortiz RosalesEmpty44508-3LP-SISDoneTaC coating/sintering Monday, November 01, 2021, 07:37
Ta tube was coated with TaC
 211101-TaC_coating.png 
  519   Wednesday, October 21, 2020, 14:39 Aaron SchmidtNb44508-2LP-SISIn progressConditioning Nb#9 Nb#9 LP-SIS target description:
  
  513   Tuesday, October 06, 2020, 14:23 Aaron SchmidtTa44508-1LP-SISIn progressConditioning Ta#61Ta#61 LP-SIS target description:
Total Ta foils = 470 [6x20 packs
  
  498   Wednesday, August 12, 2020, 11:57 Marla CervantesEmpty44489-9TARGET BOATDonePristine Ta tube calibration Short oven loaded with additional
hardware are spacers into the flex-line HS.
  
  502   Wednesday, August 26, 2020, 10:27 Marla Cervantes 44489-8 DoneC-Cartridge test #2 Wednesday, August 26, 2020, 10:26
A Ta short tube was loaded with
  
  542   Friday, March 26, 2021, 16:23 Marla CervantesEmpty44489-7 DoneRe-coat 2Objective: Coating the inner surface of
a tantalum tube to make a destructive test
and use a reference for the tantalum boats
  
  538   Tuesday, March 23, 2021, 11:28 Marla CervantesEmpty44489-6 DoneRe-coating test 3Objective: Coating the inner surface of
a short tantalum boat with rhenium.
Result:
  
  541   Friday, March 26, 2021, 13:58 Marla CervantesEmpty44489-6 DoneRe-coat 1Friday, March 26, 2021, 13:55
Yesterday a heat shield was installed
in the EVAP2.
  
  504   Monday, August 31, 2020, 12:57 Marla Cervantes 44489-15  DoneTaC coating heating test Monday, August 31, 2020, 12:23
A short naked Ta tube (no heat shielding),
previously coated with TaC was set under
  
ELOG V2.9.2-2455