Entry  Wednesday, November 06, 2013, 17:36, John Wong, TaC, Target Boat #2, , In progress, Testing TaC matrix coating  
The purpose of this experiment is to improve the TaC coating mixed with other metals as additives.  The coating solution will be sprayed on Ta metal
(0.015" thick, same thickness as the target container).
The samples will be sintered at ~ 1800C.  Once the process is completed, a graphite tube will be inserted into the tube, and then re-heated
Entry  Friday, January 11, 2013, 14:00, John Wong, Empty, Ta-Target boat, , Done, Testing QMS & thermocouples evap2_thermocouple_setup.PNGQMS_temperature_setup.PNG008_all_temp.png018.png022.png
 Friday, January 11, 2013, 13:52
TEST#1
A new target boat is coated with TaC and will go through the sintering process at 580A (max).  Ramping rate 5A/20min.
Entry  Monday, March 04, 2013, 17:41, John Wong, Empty, LP-SIS RFQ ver 2.0, , , Testing LPSIS RFQ ver 2.0 
 Monday, March 04, 2013, 17:39
This is the 2nd modified target container for RFQ LPSIS.  The container will be heated up to 650A TGHT and 150A on TBHT.  No Ta-heat
shield is being used.  
Entry  Thursday, March 24, 2016, 12:05, John Wong, SiC, , TARGET BOAT, Done, Test#3: E-spin SiC with PAN Screen_Shot_2016-03-26_at_3.39.35_PM.pngTGHT_faulty.PNG
Thursday, March 24, 2016, 11:37  
SiC powder (<1um) [10%] was mixed with PAN solution [10%].  Solution was sonicated before e-spinning.  
Fiber mat was binded to graphite foil and heat treated to 250C in air for 1 hour.  
    Reply  Thursday, October 08, 2015, 12:26, John Wong, Empty, 41077-5, LP-SIS, In progress, Test#2: Measuring temp with thermocouple (away from centre) & 2C-IR Test_2_tempcurves.PNGTest1&2_IV_temp_.png


    
        
            John Wong wrote:
        
        
            
            
            
              
    Reply  Tuesday, December 01, 2015, 11:35, Anders Mjos, Empty, 41077-5, LP-SIS, In progress, Test#2: Measuring temp with thermocouple (away from centre) & 2C-IR 2015-10-08_Small_Centre_Block.xlsx2015-10-08.4ch2015-10-06.4ch2015-10-06_Small_Centre_Block.xlsx
 Data from thermocouple attached. Raw data and Excel sheet with plot.
Entry  Friday, February 26, 2016, 16:02, John Wong, np-SiC, , TARGET BOAT, Done, Test#2: Carbonizing sol-gel TEOS + Pan nanofibers 
Friday, February 26, 2016, 15:44
5 samples were prepared at UBC MTRL using Sol-gel tetraethyl orthosilicate (TEOS) coated on electrospun polyacrylonitrate (PAN). 
Each sample is sandwiched in between graphite foils. 
    Reply  Tuesday, October 06, 2015, 15:18, John Wong, Empty, 41077-5, LP-SIS, In progress, Test#1: Measuring temp with thermocouple (centre) & 2C-IR Temp_LPSIS_IR2C_vs_typeC.PNGTemp_LPSIS_IR2C_vs_typeC_heating_cooling.PNG


    
        
            John Wong wrote:
        
        
            
            
            
              
Entry  Friday, July 31, 2015, 15:51, John Wong, Ta, , TARGET BOAT, In progress, Test for homogeneity: Sintering TaC coating on a Ta tube Screen_Shot_2015-07-31_at_3.46.10_PM.png
 Friday, July 31, 2015, 15:39
A Ta tube was coated with TaC.  The inner of the tube was filled with TaC solution and the excess was drained out to give a homogenous coating.
 The outer layer of the tube was brushed with TaC. 
    Reply  Tuesday, August 04, 2015, 12:04, Laura Lambert, Ta, , TARGET BOAT, Done, Test for homogeneity: Sintering TaC coating on a Ta tube Temp_measurements_of_new_port_window_for_2nd_OMEGA.xlsxIMG_20150806_151719182.jpgIMG_20150806_151748536.jpg


    
        
            John Wong wrote:
        
        
            
             Friday, July 31, 2015, 15:39
Entry  Tuesday, May 14, 2019, 13:57, Aaron Schmidt, , , LP-FEBIAD, Done, Test FEBIAD 
 Tuesday, May 14, 2019, 13:56: Removed old HS w/ flexible lines & swapped in the FEBIAD. (HS waterlines are still purged.) Roughing.
Tuesday, May 14, 2019, 14:06: Turbo pump on. 
Tuesday, May 14, 2019, 14:22: Waterlines opened. Vacuum ok @ 5.34e-05T & dropping. 
Entry  Thursday, October 13, 2016, 18:05, Laura Lambert, Ta, 41790-5, LP-SIS, In progress, Temperature measurements for Ta#50 
Thursday, October 13, 2016, 18:04
Target loaded into evap2
No heat shields.
    Reply  Saturday, October 15, 2016, 12:42, Aurelia Laxdal, Ta, 41790-5, LP-SIS, In progress, Temperature measurements for Ta#50 


    
        
            Laura Lambert wrote:
        
        
            
            Thursday, October 13, 2016, 18:04
    Reply  Sunday, October 16, 2016, 17:55, Aurelia Laxdal, Ta, 41790-5, LP-SIS, In progress, Temperature measurements for Ta#50 


    
        
            Aurelia Laxdal wrote:
        
        
            
            
            
              
    Reply  Tuesday, October 18, 2016, 09:23, Laura Lambert, Ta, 41790-5, LP-SIS, Done, Temperature measurements for Ta#50 


    
        
            Aurelia Laxdal wrote:
        
        
            
            
            
Entry  Monday, February 19, 2018, 14:16, Laura Lambert, Empty, 39530-3, LP-FEBIAD, Done, Temperature measurements for ARIEL  
Monday, February 19, 2018, 13:39
LP-FEBIAD loaded into evap2 this morning and pumped down.
Temperature measurements of the ionizer will be done by Fernando for ARIEL development.
Entry  Thursday, March 08, 2018, 11:05, Marla Cervantes, Empty, 39530-3, LP-FEBIAD, Done, Temperature measurements for ARIEL  
 Friday, March 09, 2018, 11:03
LP-FEBIAD loaded into evap2 and pumped down.
Temperature measurements of the ionizer will be done by Fernando for ARIEL development.
Entry  Wednesday, November 29, 2017, 16:18, Laura Lambert, Empty, 39530-3, LP-FEBIAD, Done, Temperature measurements for ARIEL 
 Wednesday, November 29, 2017, 16:17
LP-FEBIAD loaded into evap2 today and currently pumping down.
Temperature measurements of the ionizer will be done by Fernando for ARIEL development.
Entry  Wednesday, December 13, 2017, 10:55, Laura Lambert, Empty, 39530-3, LP-FEBIAD, Done, Temperature measurements for ARIEL 
 Wednesday, December 13, 2017, 10:36
LP-FEBIAD loaded into evap2 this morning and pumped down.
Temperature measurements of the ionizer will be done by Fernando for ARIEL development.
Entry  Thursday, January 07, 2016, 09:19, Aurelia Laxdal, Ta, 41369-5, HP-SIS, In progress, Temperature measurements Jan_9_and_10_2016_measurements.docx
Temperature measurements in progress this week for Ta HP-SIS.
See attachment for the current settings and rampings of the TGHT/TBHT  for the temperature measurements taken on  Jan. 9-10, 2016 .
Note: TBHT PS tripped off on Jan. 9, 2016 (see first page of the attached file) and couldn't turn it ON again over the week-end.