    Reply  Thursday, April 27, 2023, 21:48, Carla Babcock, TiC, 44692-5, LP-FEBIAD, In progress, TiC230425 MicrosoftTeams-image_(36).png


    
        
            Darwin Ortiz Rosales wrote:
        
        
            
            
            
    Reply  Thursday, April 27, 2023, 22:18, John Wong, TiC, 44692-5, LP-FEBIAD, In progress, TiC230425 Screenshot_2023-04-27_204948.jpgScreenshot_2023-04-27_205012.jpgScreenshot_2023-04-27_220239.jpgScreenshot_2023-04-27_220323.jpgScreenshot_2023-04-28_010640.jpg


    
        
            Darwin Ortiz Rosales wrote:
        
        
            
            
            
    Reply  Friday, April 28, 2023, 09:39, Darwin Ortiz Rosales, TiC, 44692-5, LP-FEBIAD, Done, TiC230425 MicrosoftTeams-image_(20).png


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Saturday, March 04, 2023, 08:34, Darwin Ortiz Rosales, TiC, 44692-7, LP-FEBIAD, Done, TiC230301 conditioning 
Saturday, March 04, 2023, 08:29
 Ta LP-FEBIAD with 369 discs plus 5 removable discs wrapped with 3 Ta heat-shields (in
layers)
Entry  Thursday, August 25, 2022, 10:16, Darwin Ortiz Rosales, TiC, 44692-10, HP-FEBIAD, Done, TiC 220818 Sintering (TiC #6) 
Thursday, August 25, 2022, 10:06
 
Target container is loaded with 379 Discs of TiC for Target and 5 extra discs for analysis on left end
Entry  Thursday, February 09, 2017, 23:28, John Wong, np-SiC, , TARGET BOAT, Done, Thermotest: SiC-SiO2-Lys and SiC pellets striptool_01.JPG
Thursday, February 09, 2017, 23:26
There are two types of samples being test for thermal stability:
1.  SiC-SiO2-Lys nanofiber mats
Entry  Wednesday, March 30, 2016, 11:32, John Wong, , Target boat, TARGET BOAT, Done, Thermostablization Polycarbosilane Fibers (UBC MTRL Samples) 
Wednesday, March 30, 2016, 11:30
Polycarbosilane fibers were prepared by UBC MTRL. 
Two samples with different fiber sizes were loaded in target boat and wrapped with heat shields.
Entry  Friday, July 31, 2020, 11:16, Ferran Boix Pamies, Empty, 41882-1, TARGET BOAT, Done, Thermocouple measurent of boat temperature 
Boat with attached thermocouple type C with AREMCO ceramabond glue installed in evap2 the 30-07-2020
Vacuum 3.2e-6torr in IGP1 after night with the roughing pump and morning with turbo.
TGHT heater on.
Entry  Friday, March 31, 2017, 12:22, John Wong, np-SiC, , TARGET BOAT, In progress, Thermo test: B3 Pellets (13.3K-PSI)  heating_curve_00.JPGheating_curve_13PSI_pellets_01.JPG
Friday, March 31, 2017, 12:21
Two compressed pellets loaded into the target boat and wrapped with Ta foil.  (see lab book p32 for details).
Chamber is pumping down.
Entry  Monday, October 24, 2016, 17:52, John Wong, np-SiC, , TARGET BOAT, Done, Thermo test of np-SiC raw powder  Capture.JPG450A_1500C.JPG
Monday, October 24, 2016, 17:43
Two samples were prepared and loaded into the target boat with 1 layer of heat-shied as shown in the attachment#1.
Ingredients used: np-SiC and very small about of 5% PVA to hold the powder together. 
Entry  Saturday, March 11, 2017, 11:58, John Wong, np-SiC, , TARGET BOAT, Done, Thermo test B3 Pellets heating_curve_900PSI_pellet.JPG
Friday, March 10, 2017, 17:29
Three B3 pellets are loaded into the container for thermo test. 
(see lab book1 Pg 26, 28-30 for more detail about the materials)
Entry  Monday, November 06, 2017, 18:25, John Wong, np-SiC, , TARGET BOAT, Done, Thermal treatment npSiC Horn vs Probe samples - P74 Capture1.JPG
Monday, November 06, 2017, 18:21
Samples of Horn and Probe - npSiC. see pg 74.
6 samples in total, to be heated to 1550C, about 450A.  Set ramping rate at 0.2A/min.  
Entry  Wednesday, October 04, 2017, 16:40, John Wong, np-SiC, , TARGET BOAT, Done, Thermal treatment cast-pellet npSiC/PAN - det. sintering effect 1550C.JPG
Wednesday, October 04, 2017, 16:37
3 samples of npSiC/PAN cast-pellets, see lab book p. 57 for details.
Desired temperature 1550C, expected TGHT ~450A.
Entry  Wednesday, March 13, 2013, 16:08, Anders Mjos, Empty, 38481-4, HP-FEBIAD, Done, Thermal test HP-FEBIAD-A_TC_at_fins.pdf
Wednesday, March 13, 2013 
Thermocouple channels (see attached PDF for photos)
T1 - Left target leg at tube
Entry  Monday, March 10, 2014, 11:52, John Wong, , , , Problems resolved, The Chiller is down 
Monday, March 10, 2014, 11:45
The chiller tripped off on March 7, 2014.

    Water is not flowing into the chiller; paddle wheel shows no signal.
    Tried turning on the chiller locally; a few seconds
Entry  Thursday, April 24, 2014, 18:13, John Wong, , , TARGET BOAT, Done, Tests: Sintering carbon Mesh coated with WC 
 Thursday, April 24, 2014, 17:25
The purpose of this experiment is to see if the carbon mesh is suitable for coating and sintering with uranium carbide.  For this test, the
mesh is coated with WC slurry (previously prepared).
Entry  Friday, October 09, 2020, 09:50, Ferran Boix Pamies, Empty, 44139-7-SK, TARGET BOAT, Done, Tests, radiation gun for parasitic target 
 2020-10-09 9:48 The target was installed the day before and left pumping over night. IGP1=4.7e-7Torr. leak check when water on, ok. Setting ramp
up
 2020-10-09 10:16 Ramping up the target to 50A, 1.5A/30s. All good. Going to 200A same rate.
    Reply  Tuesday, November 04, 2014, 16:21, John Wong, SiC, 39530-8, HP-FEBIAD, Done, Testing the new OMEGA-IR2C on SiC#31 target (NOT TO BE USED ONLINE) 


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, October 23, 2014, 15:34
Entry  Thursday, October 23, 2014, 15:38, Laura Lambert, SiC, 39530-8, HP-FEBIAD, In progress, Testing the new OMEGA-IR2C on SiC#31 target 2014-10-23_15.12.56.jpg2014-10-24.jpeg
 Thursday, October 23, 2014, 15:34
*See elog #142 for target description*
one endcap still in place, one removed for OMEGA-IR2C beam to reach material [see pic]
Entry  Tuesday, August 14, 2012, 15:57, John Wong, SiC, 38295-8 , HP-FEBIAD, Done, Testing endcaps inserted /w the new expansion tool vacuum_leaks.PNGTGHT_TBHT.png
Tuesday, August 14, 2012, 15:44
This SiC target was prepared in May 2011 with the Evaporator#1.  The target will not used for online. 
Two endcaps were inserted with the new expansion tool.  The target will be heated up to the normal operating condition (TGHT =580A, TBHT =