Entry  Wednesday, October 02, 2024, 19:24, Darwin Ortiz Rosales, TiC, , LP TUBE, Done, sintering TiC Experiment  

Wednesday, October 02, 2024, 19:21

Ta endcup at front end of container

End-caps on the graphite cartridge have holes for outgassing. 

initial heating @ 2A/min to 85 A then 2A/min to 120A TGHT.  Allow pressure to drop and then ramp to 400 A at 2A/min, leave 4 hours and start ramp down.

OMEGA slope = 0.99

Vacuum limits up to 400A: 5.0e-04 Torr -- 1.0e-02 Torr

Max current~400A (1900 C)

 


Wednesday, October 02, 2024, 19:25

Starting IGP1 = 6.65e-06 Torr


Thursday, October 03, 2024, 05:09

Starting rampdown.  Pressure stable at 4.5 e-06 Torr

Top temperature 1850 C on OMEGA

ramping down at -2A/min

Entry  Saturday, November 23, 2024, 11:11, Darwin Ortiz Rosales, ZrC, , LP TUBE, Done, ZrC 24E9T1 + std conditioning and sintering 

Saturday, November 23, 2024, 11:08

 No milling ZrC material sintering inside graphite cartridge

baseline standard discs included for comparison. 

4 Ta foils wrapped around  container

one spring at the back end to retain the graphite cartridge

One Ta cap with perforations at the front for T readings

initial heating at 2A/min to 50A, followed by heating at 1A/min to 90 A

Initial IGP1= 1.0e-6 Torr

OMEGA slope =0.990

Good and bad vacuum =5.0e-5 Torr and 5e-4 torr


Saturday, November 23, 2024, 11:20

autoramp start at 2A/min to 50A on tght


Saturday, November 23, 2024, 20:11

allowed pressure to drop to 3.3e-6 Torr after degassing. 

Started ramp to 90A at 1A/min


Saturday, November 23, 2024, 23:46

started ramping at 1.5A/120s or 0.75A/min to 400A


Sunday, November 24, 2024, 07:55

Reached 1900 C at 410 A setpoint and 402 A on RD

Pressure did not increase after bumping up to 410 setpoint so will keep at this current until 11 am (four hours near 1900 C in total)


Sunday, November 24, 2024, 10:58

Final IGP1 at start of rampdown = 2.9e-6 Torr

Ramping down at -2A/min