Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 35 of 35  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target Material Target Oven W.O#down Source Status Subject Text Attachments
  678   Wednesday, October 02, 2024, 19:24 Darwin Ortiz RosalesTiC LP TUBEDonesintering TiC Experiment Wednesday, October 02, 2024, 19:21
Ta endcup at front end of container
End-caps on the graphite cartridge
  
  679   Saturday, November 23, 2024, 11:11 Darwin Ortiz RosalesZrC LP TUBEDoneZrC 24E9T1 + std conditioning and sinteringSaturday, November 23, 2024, 11:08
 No milling ZrC material sintering
inside graphite cartridge
  
ELOG V2.9.2-2455