Entry  Wednesday, October 13, 2021, 08:35, Aaron Schmidt, , , , Problems, Troubleshoot - Pump down issues. 
Swapped out the Cu gaskets for SS gaskets in the HS top lines. (x2)
Wednesday, October 13, 2021, 08:35: Roughing.
Wednesday, October 13, 2021, 08:50: Turbo pump on. TP Current 6.06-6.10A.
Entry  Thursday, November 25, 2021, 14:00, Aaron Schmidt, , , , , Lower insulator replaced 
 The Helicoil had mostly pulled out of the old one.
Entry  Tuesday, April 12, 2022, 13:41, Aaron Schmidt, , , , Maintenance, New Flex - line HS installed 
Old HS sprang a leak in the copper tubing.  
HS#44378-15
Tuesday, April 12, 2022, 13:35: Roughing. 
Entry  Tuesday, May 10, 2022, 14:43, Aaron Schmidt, , , , Maintenance, Active TP removed / Swap / Slow start TP 
 Tuesday, May 10, 2022, 14:42: TV551 Varian. SN: 202311 (Slightly active from BL1A
- will not cross contaminate. Field only - Tagged) was removed as it was meant to be a temporary fix. Replacement (Refurbished) pump is to be installed.
(Tomorrow - Use slow start function as per vacuum group) 
Entry  Wednesday, June 08, 2022, 10:00, Flora Wu, , boat, , Done, carbonize PAN 10% discs 
Thursday, June 09, 2022, 11:25
Total number of foils: 14 electrospun fiber pellets 
Total weight = 208.3 g
    Reply  Thursday, June 09, 2022, 19:20, John Wong, , boat, , Done, carbonize PAN 10% discs evap2-screenshot_01.PNGevap2-screenshot_02.pngevap2-screenshot_3.pngtemp-current-plot.xlsxevap2-screenshot_04.PNG


    
        
            Flora Wu wrote:
        
        
            
            Thursday, June 09, 2022, 11:25
Entry  Monday, June 20, 2022, 14:52, Darwin Ortiz Rosales, Empty, , , Done, softstart of new TP 
Monday, June 20, 2022, 14:50 
A new Turbo pump was installed this morning and it was soft started.  It has operated correctly and it is ready for use.  Derek O. 
installed it.
Entry  Monday, June 05, 2023, 14:52, Aaron Schmidt, , , , , Swapped turbo pumps. 
 Previous TP would only spin up to 4KRPM. New TP installed.
Monday, June 05, 2023, 14:50: Roughing. 
Monday, June 05, 2023, 15:10: Controller reset. TP on. 
Entry  Wednesday, August 07, 2024, 15:37, Aaron Schmidt, , , , , Turning on EVAP2's turbo pump 
Wednesday, August 07, 2024, 15:36: Roughing. Had initially been roughed & TP started w/ Marla CS, however it timed out. Restarting.
Wednesday, August 07, 2024, 15:37: TP on.
Wednesday, August 07, 2024, 15:46: Tripped at 4 KRPM. Restarted. Up to 5 KRPM.