532
|
Monday, March 01, 2021, 13:58 |
Aaron Schmidt | | | | | Flex - line HS installed | Flex-Line HS had been fully scrubbed out
earlier. All gaskets replaced.
Empty. Quick check for leaks. |
|
|
537
|
Tuesday, March 23, 2021, 08:07 |
Aaron Schmidt | | | | | Re - Ta test. Leak check. | Modified HS installed with new brackets
as per Marla.
Tuesday, March 23, 2021, 08:02: Vacuum |
|
|
538
|
Tuesday, March 23, 2021, 11:28 |
Marla Cervantes | Empty | 44489-6 | | Done | Re-coating test 3 | Objective: Coating the inner surface of
a short tantalum boat with rhenium.
Result: |
|
|
539
|
Thursday, March 25, 2021, 07:57 |
Aaron Schmidt | | | | | Re - Ta test. Leak check. | Thursday, March 25, 2021, 07:55: Vacuum
@ 5.12e-07T. Waterlines opened. |
|
|
540
|
Thursday, March 25, 2021, 11:24 |
Marla Cervantes | Empty | NA (Cu-Tube | | Done | Re-coat test 4 | Objective: Coating the inner surface of
a short tantalum tube with rhenium.
Result: |
|
|
541
|
Friday, March 26, 2021, 13:58 |
Marla Cervantes | Empty | 44489-6 | | Done | Re-coat 1 | Friday, March 26, 2021, 13:55
Yesterday a heat shield was installed
in the EVAP2. |
|
|
542
|
Friday, March 26, 2021, 16:23 |
Marla Cervantes | Empty | 44489-7 | | Done | Re-coat 2 | Objective: Coating the inner surface of
a tantalum tube to make a destructive test
and use a reference for the tantalum boats |
|
|
543
|
Sunday, March 28, 2021, 11:24 |
Marla Cervantes | | NA (Ta-tube) | | Done | Re-coat 3 | Objective: Coating the inner surface of
a tantalum tube to make a destructive test
and use a reference for the tantalum boats |
|
|
544
|
Tuesday, March 30, 2021, 19:49 |
Ferran Boix Pamies | Empty | 44139-7-SK | | Done | Parasitic target thermal tests | 2021-03-30 7:48 Target loaded with
parasitic target only. No container. Leaving
under vacuum over night. |
|
|
547
|
Tuesday, April 13, 2021, 10:44 |
Marla Cervantes | Empty | NA (Ta- tube Eagle Alloys) | | Done | Re-coat 4 | Tuesday, April 13, 2021, 09:51
IGP1 = 2.5e-7 Torr
|
|
|
557
|
Wednesday, October 13, 2021, 08:35 |
Aaron Schmidt | | | | Problems | Troubleshoot - Pump down issues. | Swapped out the Cu gaskets for SS gaskets
in the HS top lines. (x2)
Wednesday, October 13, 2021, 08:35: |
|
|
565
|
Thursday, November 25, 2021, 14:00 |
Aaron Schmidt | | | | | Lower insulator replaced | The Helicoil had mostly pulled out
of the old one.
|
|
|
571
|
Tuesday, April 12, 2022, 13:41 |
Aaron Schmidt | | | | Maintenance | New Flex - line HS installed | Old HS sprang a leak in the copper tubing.
HS#44378-15
Tuesday, April 12, 2022, 13:35: Roughing. |
|
|
575
|
Tuesday, May 10, 2022, 14:43 |
Aaron Schmidt | | | | Maintenance | Active TP removed / Swap / Slow start TP | Tuesday, May 10, 2022, 14:42: TV551
Varian. SN: 202311 (Slightly active from |
|
|
579
|
Wednesday, June 08, 2022, 10:00 |
Flora Wu | | boat | | Done | carbonize PAN 10% discs | Thursday, June 09, 2022, 11:25
Total number of foils: 14 electrospun |
|
|
581
|
Thursday, June 09, 2022, 19:20 |
John Wong | | boat | | Done | carbonize PAN 10% discs |
|
|
|
583
|
Monday, June 20, 2022, 14:52 |
Darwin Ortiz Rosales | Empty | | | Done | softstart of new TP | Monday, June 20, 2022, 14:50
A new Turbo pump was installed this
morning and it was soft started. It |
|
|
635
|
Monday, June 05, 2023, 14:52 |
Aaron Schmidt | | | | | Swapped turbo pumps. | Previous TP would only spin up to
4KRPM. New TP installed.
Monday, June 05, 2023, 14:50: Roughing. |
|
|
668
|
Wednesday, August 07, 2024, 15:37 |
Aaron Schmidt | | | | | Turning on EVAP2's turbo pump | Wednesday, August 07, 2024, 15:36: Roughing.
Had initially been roughed & TP started
w/ Marla CS, however it timed out. Restarting. |
|