  107   Wednesday, January 22, 2014, 13:46 Laura LambertEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Monday, January 20, 2014, 16:32

A new target boat was sprayed with TaC coating and let dry this morning.

The target boat is NOT wrapped with Ta-heat shield.

The boat was installed in Evap#2, chamber is currently being pumped down overnight.


 

 Tuesday, January 21, 2014, 11:10

Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 

 Tuesday, January 21, 2014, 11:51

Vacuum was grumpy and was well on it's way to tripping off [reached 5e-5 Torr], auto ramping was stopped at ~95A and quickly stepped down to 90A to avoid tripping it off.

Allowed vacuum to settle back down to 2.3e-6 Torr. Auto ramping changed to 0.2A/min and re-started.

 close-call!


 

 Wednesday, January 22, 2014, 09:46

TGHT has been slowly ramping up overnight at a rate of 0.2A/min.

IGP1 = 2.9e-7 Torr, TGHT = 342A; stepping ramping rate up to 2.0A/min.


 

 Wednesday, January 22, 2014, 13:43

TGHT is sitting at 693A, IGP1 = 1.3e-6 Torr.

Stepping up TGHT voltage up to 14V from 13.05V to reach the max current of 700A.


 

  108   Wednesday, January 22, 2014, 15:13 John WongEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Monday, January 20, 2014, 16:32

A new target boat was sprayed with TaC coating and let dry this morning.

The target boat is NOT wrapped with Ta-heat shield.

The boat was installed in Evap#2, chamber is currently being pumped down overnight.


 

 Tuesday, January 21, 2014, 11:10

Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 

 Tuesday, January 21, 2014, 11:51

Vacuum was grumpy and was well on it's way to tripping off [reached 5e-5 Torr], auto ramping was stopped at ~95A and quickly stepped down to 90A to avoid tripping it off.

Allowed vacuum to settle back down to 2.3e-6 Torr. Auto ramping changed to 0.2A/min and re-started.

 close-call!


 

 Wednesday, January 22, 2014, 09:46

TGHT has been slowly ramping up overnight at a rate of 0.2A/min.

IGP1 = 2.9e-7 Torr, TGHT = 342A; stepping ramping rate up to 2.0A/min.


 

 Wednesday, January 22, 2014, 13:43

TGHT is sitting at 693A, IGP1 = 1.3e-6 Torr.

Stepping up TGHT voltage up to 14V from 13.05V to reach the max current of 700A.


 

 Wednesday, January 22, 2014, 15:09

TGHT reached to 700A/12.83V.  Local temperature on the boat surface was measured at ~1500C.

Note: This is the "old" design boat.  The new design boat was able to heat up to 900A/16.88 - the temperature was measured at about 1500C.  (see elog: https://elog.triumf.ca/TIS/Evaporator_2/15)

Target will be heated for a few hours and will be cooled down later tonight.

The chamber will be vented tomorrow and the boat will be inspected.


 

  218   Thursday, June 18, 2015, 11:39 Rick Maharaj    Installation of Extraction Electrode Insulator - New Material

Tuesday June 16, 2015

An Extraction Insulator ITD0381 made from a different grade of AiN was installed in Evaporator 2 for testing purposes. The sub assembly included the SIS Restraint Housing ITD0389, New Extraction Insulator ITD0381, Repeller Electrode ITD0377, Extraction Electrode ITD0374 with fingerstock mounted.

The standoff insulator ITD0400 was found to be swelled up and broken. It was replaced with and glazed alumina insulator.

The tube heater Insulator ITD0342 - central support helicoil was repaired.

  292   Tuesday, May 03, 2016, 14:44 Laura Lambert    VACUUM PUMP REPLACEMENT

 Tuesday, May 03, 2016, 14:29

Turned vacuum pump on this morning, sounded awful: loud grinding bad noises.

Called vacuum group, will replace pump tomorrow morning.

Sounds like materials coming out from all the out-gassing during sintering processes has ruined the bearings.


 

  387   Tuesday, September 12, 2017, 13:08 Aaron Schmidt    Window shutter added

 Tuesday, September 12, 2017, 12:00:

The coated back window was changed to a shuttered window.

On star-point flange bolt interfered with the shutter, however it was removed, shortened, and re-installed.

The installation is complete. Awaiting roughing pump to leak check.

  419   Tuesday, September 11, 2018, 10:47 Aaron Schmidt    Evap 2 step discrepancy

 Tuesday, September 11, 2018, 10:45:

TGHT: 53.4 A   TBHT: 57.75

Actual

TGHT: 60.0A  TBHT: 59.0A

Uploaded the rest to Word doc. Screenshots included.

Attachment 1: PS_Check.docx
  438   Tuesday, April 16, 2019, 13:40 Aaron Schmidt    Replace bottom insert on HS

 Tuesday, April 16, 2019, 13:38: Replaced the bottom insert on the heat shield. 

Used small amount of isopropyl alcohol to wipe the inside if the HS out. 

  444   Tuesday, May 21, 2019, 14:34 Aaron Schmidt    HS swap to EVAP 2 flex line.

 Tuesday, May 21, 2019, 14:33: Install flexible line evap 2 HS.

  481   Wednesday, May 20, 2020, 07:18 Aaron Schmidt    Check Evap 2

Gradually open waterlines under vacuum after period of no use.

Wednesday, May 20, 2020, 07:17: Vacuum @ 1.13e-06T

Wednesday, May 20, 2020, 07:19: Hot lab cooling water return opened. Vacuum @ 1.13e-06T.

Wednesday, May 20, 2020, 07:22: Hot lab cooling water supply opened. Vacuum @ 1.11e-06T.

Wednesday, May 20, 2020, 07:29: Vacuum remains stable @ 1.11e-06T.  

 

  489   Monday, July 13, 2020, 11:03 Aaron Schmidt    Pump down / leak / vacuum check.

 Darwin reported that he was unable to achieve vacuum of 150mTorr. The flex-line HS had been removed last week for modifications. SS gaskets received today. Replaced HS gaskets (Cu). 

Monday, July 13, 2020, 11:00: Roughing. 

Monday, July 13, 2020, 11:44: Vacuum to 200mTorr. Venting.

Monday, July 13, 2020, 11:55: Roughing. HS waterlines were opened. No visible leak detected.

Monday, July 13, 2020, 12:32: Venting. Vacuum to 175mTorr.

Monday, July 13, 2020, 12:34: Roughing.  

Monday, July 13, 2020, 15:21: Turn off the roughing pump. Vent in the am & plan to remove the HS to leak check the HS & EVAP 2. 


Tuesday, July 14, 2020, 07:42: Venting. 

Tuesday, July 14, 2020, 08:23: Flexible line HS removed. U-Line installed. Roughing. 

Tuesday, July 14, 2020, 08:54: Turbo pump on. 

Tuesday, July 14, 2020, 11:15: Vacuum @ 3.14e-06T. Turbo & Roughing pump off. 

Tuesday, July 14, 2020, 11:25:

HS leak checks:

0.0e-08 atm-cc/sec 

0.0e-07 atm-cc/sec @ 75 PSI He w/ sniffer.

0.0e-07 atm-cc/sec @ 120 PSI He w/ sniffer. (Note HS is very dirty inside)

Tuesday, July 14, 2020, 11:35: Venting EVAP 2. He bottle connected on "Air-In" on the HS water supply line. 

Tuesday, July 14, 2020, 13:50:

Pressurized the HS lines on EVAP 2 w/ 30 PSI He for 10 minutes. Remained @ 0.0e-07 atm-cc/sec.

Tuesday, July 14, 2020, 13:53: Roughing.

Tuesday, July 14, 2020, 17:33: Turbo pump on. 


Wednesday, July 15, 2020, 10:31: Turbo pump off. 

Wednesday, July 15, 2020, 12:02: HS Leak checked in the cold lab: 0.0e-07 atm-cc/sec @ 120 PSI He w/ sniffer.

Wednesday, July 15, 2020, 12:34: Venting. 

Wednesday, July 15, 2020, 13:37: Installed flex-line HS. Pressurized the HS lines on EVAP 2 w/ 30 PSI He for 10 minutes. Remained @ 0.0e-07 atm-cc/sec.

Wednesday, July 15, 2020, 13:42: Roughing. 

Wednesday, July 15, 2020, 14:16: Turbo pump on. 

Wednesday, July 15, 2020, 15:59: Vacuum @ 3.85e-06T 

Wednesday, July 15, 2020, 16:00: Waterline opened. No immediate response on Vacuum. 

Wednesday, July 15, 2020, 16:03: Vacuum @ 3.69e-06T and continuing to drop. 

  494   Wednesday, August 05, 2020, 13:38 Aaron Schmidt    RP Swap on EVAP 2

 BP1 swapped with RP2 (TS beamline)

U-line installed.

Wednesday, August 05, 2020, 13:37: Roughing. 

Wednesday, August 05, 2020, 13:39: Open RV1 to EVAP 2 chamber.

Wednesday, August 05, 2020, 14:08: Turbo pump on. 

Wednesday, August 05, 2020, 14:17: Turbo pump on (green) / Shut - off. 

Wednesday, August 05, 2020, 14:18: BP1 off. Runs ok. 

  509   Thursday, September 24, 2020, 13:37 Aaron SchmidtNb TARGET BOAT Nb Test SRF group

Sample loaded into a vertical target boat. Flex line HS removed, SS waterline HS installed -AS.

Thursday, September 24, 2020, 13:22: Roughing.

Thursday, September 24, 2020, 13:54: Turbo pump on. 

  524   Tuesday, November 24, 2020, 08:13 Aaron Schmidt    Flex - line HS installed

Monday, November 23, 2020, 17:01: Flex-line HS installed.


Tuesday, November 24, 2020, 08:03: Vacuum @ 9.55e-07T.

Tuesday, November 24, 2020, 08:08: Vacuum Ok

Tuesday, November 24, 2020, 08:09: Modify Controls dialogue on IEVAP2:IGP1:RDVAC

Max value from 0.1 to 0.0001 to better view curve on the strip tool and monitor for vacuum spikes.

Tuesday, November 24, 2020, 08:13: TGHT / TBHT PS on. 

 

  532   Monday, March 01, 2021, 13:58 Aaron Schmidt    Flex - line HS installed

Flex-Line HS had been fully scrubbed out earlier. All gaskets replaced.

Empty. Quick check for leaks.

Monday, March 01, 2021, 13:57: Roughing.

Monday, March 01, 2021, 14:13: TP1 on. 

Monday, March 01, 2021, 15:18: Vacuum @ 1.01e-05T. Open HS waterline. 

Monday, March 01, 2021, 15:24: Vacuum @ 9.30e-06T & dropping. Waterline ok. 

Monday, March 01, 2021, 15:25: Turbo pump off. Vent when ready. 

  537   Tuesday, March 23, 2021, 08:07 Aaron Schmidt    Re - Ta test. Leak check.

 Modified HS installed with new brackets as per Marla.

Tuesday, March 23, 2021, 08:02: Vacuum @ 3.64e-07T. Waterlines opened.

Tuesday, March 23, 2021, 08:06: Vacuum @ 3.60e-07T. Stable.

  539   Thursday, March 25, 2021, 07:57 Aaron Schmidt    Re - Ta test. Leak check.

Thursday, March 25, 2021, 07:55: Vacuum @ 5.12e-07T. Waterlines opened.

Thursday, March 25, 2021, 07:55: Vacuum @ 5.09e-07T. Stable.

  565   Thursday, November 25, 2021, 14:00 Aaron Schmidt    Lower insulator replaced

 The Helicoil had mostly pulled out of the old one.

Thursday, November 25, 2021, 13:58: Insulator replaced. EVAP 2 is ready for use with ISAC targets.

  635   Monday, June 05, 2023, 14:52 Aaron Schmidt    Swapped turbo pumps.

 Previous TP would only spin up to 4KRPM. New TP installed.

Monday, June 05, 2023, 14:50: Roughing. 

Monday, June 05, 2023, 15:10: Controller reset. TP on. 

  668   Wednesday, August 07, 2024, 15:37 Aaron Schmidt    Turning on EVAP2's turbo pump

Wednesday, August 07, 2024, 15:36: Roughing. Had initially been roughed & TP started w/ Marla CS, however it timed out. Restarting.

Wednesday, August 07, 2024, 15:37: TP on.

Wednesday, August 07, 2024, 15:46: Tripped at 4 KRPM. Restarted. Up to 5 KRPM.

Failed to start.


Thursday, August 08, 2024, 10:00: TP started. 

Thursday, August 08, 2024, 10:12: TP Tripped but nearly spun up. Reset & Restarted. TP Green / on.