Friday, March 18, 2016, 17:13, Aurelia Laxdal, Ta, 41790-1, LP-SIS, In progress, Ta#47 LP-SIS (with new center block) conditioning
|
Aurelia Laxdal wrote:
|
Monday, March 21, 2016, 18:57, Aurelia Laxdal, Ta, 41790-1, LP-SIS, In progress, Ta#47 LP-SIS (with new center block) conditioning
|
Aurelia Laxdal wrote:
|
Tuesday, March 22, 2016, 11:31, Aurelia Laxdal, Ta, 41790-1, LP-SIS, In progress, Ta#47 LP-SIS (with new center block) conditioning
|
Aurelia Laxdal wrote:
|
Saturday, October 15, 2016, 12:42, Aurelia Laxdal, Ta, 41790-5, LP-SIS, In progress, Temperature measurements for Ta#50
|
Laura Lambert wrote:
Thursday, October 13, 2016, 18:04 |
Sunday, October 16, 2016, 17:55, Aurelia Laxdal, Ta, 41790-5, LP-SIS, In progress, Temperature measurements for Ta#50
|
Aurelia Laxdal wrote:
|
Thursday, July 25, 2024, 15:46, Angelina Chen, np-Ta, , TARGET BOAT, In progress, Carbonization of Heat Stabilized np-Ta Fibres Disk (1st Attempt)
|
Thursday, July 25, 2024, 15:18
Target container consists of two np-Ta fibres disk samples. Both disks are made from heat stabilized np-Ta fibres (150 C for 17 hours) and were
pressed at 8 tons / 300 MPa. |
Friday, January 11, 2013, 15:16, Anders Mjos, , , , Maintenance, Replace terminal insulator
|
John Wong wrote:
Friday, January 11, 2013, 10:59 |
Wednesday, March 06, 2013, 10:41, Anders Mjos, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test
|
Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.
Thermocouple channels are as follows: |
Monday, March 11, 2013, 12:23, Anders Mjos, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test 2
|
Anders Mjos wrote:
|
Wednesday, March 13, 2013, 16:08, Anders Mjos, Empty, 38481-4, HP-FEBIAD, Done, Thermal test
|
Wednesday, March 13, 2013
Thermocouple channels (see attached PDF for photos)
T1 - Left target leg at tube |
Thursday, March 14, 2013, 12:27, Anders Mjos, Empty, 38481-4, HP-FEBIAD, Done, CTL thermal test 3 (w/o CTL block)
|
Thursday, March 12, 2013
The CTL was removed and target heated to 580A / 300A
T1: Left target leg close to tube |
Friday, April 19, 2013, 15:27, Anders Mjos, Empty, 38481-4, HP-FEBIAD, Done, CTL test
|
Target installed with 4 T/C
The target assembly is ITD0300 with the CTL Cu cooling block slightly modified.
Ch1 - CTL cooling block T/C feedtrough |
Tuesday, April 23, 2013, 10:11, Anders Mjos, Empty, 38481-4, HP-FEBIAD, Done, CTL test
|
John Wong wrote:
|
Tuesday, April 30, 2013, 11:20, Anders Mjos, Empty, 38481-5, HP-FEBIAD, Done, CTL thermal test
|
CTL block on T/C F/T Ch 1
Supply on Ch 3
HS Return on Ch 4 |
Tuesday, October 29, 2013, 15:50, Anders Mjos, , , , In progress, Copper bars on TGHT and TBHT
|
Tuesday, October 29, 2013, 15:50: Pumping down
Wednesday, October 30, 2013, 09:32: Turbo started
Wednesday, October 30, 2013, 14:50: The Cu-bars were heated to 600A and 300A for TGHT and TBHT respectively. |
Friday, November 01, 2013, 17:20, Anders Mjos, , , , Problems, Backing pump needs new filter
|
The source of the poor vacuum in the backing line seems to be related to a dirty filter. We will try to find a replacement filter next week.
The problem seem to have started September 17th, when backing preassure CG1A went from 40 mTorr to 130 mTorr. CG1B remained around 30 mTorr. |
Monday, November 04, 2013, 14:02, Anders Mjos, , , , Maintenance, Backing pump replaced
|
Anders Mjos wrote:
|
Thursday, November 07, 2013, 09:38, Anders Mjos, , , , Problems resolved, Heat Shield cooling line twisted
|
See attached photo.
The Heat Shield has been taken to the Machine Shop for repair.
Friday, November 08, 2013 |
Friday, March 07, 2014, 10:34, Anders Mjos, , , , Problems resolved, TGHT2 water flow signal
|
There was no signal going from the coils to the PLC. After manipulating the connection points on the coil a signal could again be established. Frequency
is ~ 40Hz. |
Friday, October 03, 2014, 13:02, Anders Mjos, Empty, , , Maintenance, Broken insulators
|
John Wong wrote:
Thursday, October 02, 2014, 11:22 |
|