Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 30 of 34  Not logged in ELOG logo
IDdown Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  99   Friday, January 17, 2014, 09:34 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  98   Thursday, January 16, 2014, 13:06 Laura LambertEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  97   Wednesday, January 15, 2014, 17:45 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container Wednesday, January 15, 2014, 17:30
Target container is coated with TaC.
 No Ta-heat shields are used.
  
  96   Thursday, November 07, 2013, 09:38 Anders Mjos   Problems resolvedHeat Shield cooling line twistedSee attached photo.
The Heat Shield has been taken to
the Machine Shop for repair.
 Twisted_Tube.jpgTwisted_Tube_Repaired.jpg 
  95   Wednesday, November 06, 2013, 17:36 John WongTaCTarget Boat #2 In progressTesting TaC matrix coating The purpose of this experiment is to improve
the TaC coating mixed with other metals as
additives.  The coating solution will
  
  94   Monday, November 04, 2013, 14:02 Anders Mjos   MaintenanceBacking pump replaced 

    
  
  93   Friday, November 01, 2013, 17:20 Anders Mjos   ProblemsBacking pump needs new filterThe source of the poor vacuum in the backing
line seems to be related to a dirty filter.
We will try to find a replacement filter
  
  92   Tuesday, October 29, 2013, 15:50 Anders Mjos   In progressCopper bars on TGHT and TBHT Tuesday, October 29, 2013, 15:50:
Pumping down
Wednesday, October 30, 2013, 09:32:
 Current_and_Voltage.pdf 
  91   Friday, October 04, 2013, 16:21 John WongEmpty LP-SISDoneSintering TaC coating on a LP target container to be used for C-grv tube test Friday, October 04, 2013, 15:37
A LP target container is coated with
TaC.  The container is wrapped with
 LP_C_grv_tempcurve.PNGLP_C_grv_TGHT632_1960C.PNG 
  90   Thursday, September 26, 2013, 15:17 John WongEmpty39814-VI-?LP-IG-LISDoneSintering empty target oven coated with TaC for UCx#8Thursday, September 26, 2013, 13:04
The LP-IG-LIS target container is
coated with TaC. 
 UCx#8_container_TaC_coat_sintering.PNG 
  89   Monday, September 23, 2013, 16:18 John WongNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples)

    

       
            
  
  88   Friday, September 20, 2013, 14:59 John WongNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples)

    

       
            
  
  87   Thursday, September 19, 2013, 17:02 John WongNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples)

    

       
            
  
  86   Thursday, September 19, 2013, 11:56 Laura LambertNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples)

    

       
            
 Capture.PNG 
  85   Tuesday, September 17, 2013, 11:21 John WongNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples) Tuesday, September 17, 2013, 11:14
Target boat contains 5 Nb discs. 
3 discs are wraps with 0.001" thin of
 Nb_sample_setup.PNGNb_800C.PNG 
  84   Thursday, August 29, 2013, 11:53 Laura Lambert targetboat (TaC coated) DoneSintering TaC coated regular caps

    

       
            
  
  83   Tuesday, August 27, 2013, 17:01 John Wong targetboat (TaC coated) DoneSintering TaC coated regular caps Tuesday, August 27, 2013, 16:48
Target boat is filled with TaC coated
endcaps (brown) and some partial sinterred
 Sintering__endcap_.jpg 
  82   Wednesday, August 21, 2013, 12:30 John WongTa38817-10HP-SISDoneConditioning Ta target Wednesday, August 21, 2013, 12:28
Container is filled with 400 discs
of Ta foils, and wrapped with 3 layers of
 Ta#41_conditioning.PNG 
  81   Thursday, August 08, 2013, 17:28 John WongNiO39530-6HP-FEBIADDoneSintering NiO # 2

    

       
            
  
  80   Thursday, August 08, 2013, 15:41 Laura LambertNiO39530-6HP-FEBIADIn progressSintering NiO # 2Thursday, August 08, 2013, 15:19
NiO target materials loaded into
the container yesterday.
 NiO#2.PNG 
ELOG V2.9.2-2455