  Evaporator_2, Page 30 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  109   Wednesday, January 22, 2014, 18:22 John WongEmpty40282-4TARGET BOATProblemsSintering Ta target boat with TaC coating (IEVAP2:TBHT2 water signal problem)

    

       
            
 Screen_Shot_2014-01-22_at_6.10.50_PM.pngTargetboat_heatingup2.JPEG 
  108   Wednesday, January 22, 2014, 15:13 John WongEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

    

       
            
  
  107   Wednesday, January 22, 2014, 13:46 Laura LambertEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

    

       
            
  
  106   Wednesday, January 22, 2014, 09:49 Laura LambertEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

    

       
            
  
  105   Tuesday, January 21, 2014, 11:56 Laura LambertEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

    

       
            
  
  104   Tuesday, January 21, 2014, 11:33 Laura LambertEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

    

       
            
  
  103   Monday, January 20, 2014, 16:35 Laura LambertEmptyTa-Target boat  Sintering Ta target boat with TaC coating Monday, January 20, 2014, 16:32
A new target boat was sprayed with
TaC coating and let dry this morning.
  
  102   Monday, January 20, 2014, 16:30 Laura LambertEmpty39165-9LP-SISDoneSintering TaC coating container

    

       
            
  
  101   Friday, January 17, 2014, 12:52 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  100   Friday, January 17, 2014, 10:18 Laura LambertEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  99   Friday, January 17, 2014, 09:34 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  98   Thursday, January 16, 2014, 13:06 Laura LambertEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  97   Wednesday, January 15, 2014, 17:45 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container Wednesday, January 15, 2014, 17:30
Target container is coated with TaC.
 No Ta-heat shields are used.
  
  96   Thursday, November 07, 2013, 09:38 Anders Mjos   Problems resolvedHeat Shield cooling line twistedSee attached photo.
The Heat Shield has been taken to
the Machine Shop for repair.
 Twisted_Tube.jpgTwisted_Tube_Repaired.jpg 
  95   Wednesday, November 06, 2013, 17:36 John WongTaCTarget Boat #2 In progressTesting TaC matrix coating The purpose of this experiment is to improve
the TaC coating mixed with other metals as
additives.  The coating solution will
  
  94   Monday, November 04, 2013, 14:02 Anders Mjos   MaintenanceBacking pump replaced 

    
  
  93   Friday, November 01, 2013, 17:20 Anders Mjos   ProblemsBacking pump needs new filterThe source of the poor vacuum in the backing
line seems to be related to a dirty filter.
We will try to find a replacement filter
  
  92   Tuesday, October 29, 2013, 15:50 Anders Mjos   In progressCopper bars on TGHT and TBHT Tuesday, October 29, 2013, 15:50:
Pumping down
Wednesday, October 30, 2013, 09:32:
 Current_and_Voltage.pdf 
  91   Friday, October 04, 2013, 16:21 John WongEmpty LP-SISDoneSintering TaC coating on a LP target container to be used for C-grv tube test Friday, October 04, 2013, 15:37
A LP target container is coated with
TaC.  The container is wrapped with
 LP_C_grv_tempcurve.PNGLP_C_grv_TGHT632_1960C.PNG 
  90   Thursday, September 26, 2013, 15:17 John WongEmpty39814-VI-?LP-IG-LISDoneSintering empty target oven coated with TaC for UCx#8Thursday, September 26, 2013, 13:04
The LP-IG-LIS target container is
coated with TaC. 
 UCx#8_container_TaC_coat_sintering.PNG 