  48   Wednesday, September 26, 2012, 15:06 Nikita BernierTaC  DoneSintering Ta foil with TaC coating

    

       
            
 striptool6.pngSans_titre2.png 
  49   Wednesday, September 26, 2012, 15:14 Nikita BernierBeO  DoneSintering BeO Pellets #4 Wednesday, September 26, 2012, 15:07
 
 Sans_titre3.png 
  50   Friday, September 28, 2012, 12:59 Nikita BernierBeO  DoneSintering BeO Pellets #4

    

       
            
 striptool7.pngstriptool8.PNGRetired.png 
  53   Friday, January 11, 2013, 11:16 John Wong   MaintenanceReplace terminal insulatorFriday, January 11, 2013, 10:59
The insulator that holds the terminals
was broken when a target container was installed. 
 broke_insulator.PNG 
  54   Friday, January 11, 2013, 14:00 John WongEmptyTa-Target boat DoneTesting QMS & thermocouples Friday, January 11, 2013, 13:52
TEST#1
A new target boat is coated with
 evap2_thermocouple_setup.PNGQMS_temperature_setup.PNG008_all_temp.png018.png022.png 
  55   Friday, January 11, 2013, 15:16 Anders Mjos   MaintenanceReplace terminal insulator

    

       
            
 ITD0052C_revB.pdfinstalled_insulators.jpegta_heat_shields.jpeg 
  59   Monday, March 04, 2013, 17:41 John WongEmptyLP-SIS RFQ ver 2.0  Testing LPSIS RFQ ver 2.0 Monday, March 04, 2013, 17:39
This is the 2nd modified target container
for RFQ LPSIS.  The container will be
  
  67   Friday, April 19, 2013, 09:39 Rick MaharajEmpty  Donethermocouple Feedthru A thermocouple feedthru was installed
via 9 pin sub-D connector. It runs from the
the conflat cross on the top of the evaporator
  
  72   Tuesday, May 07, 2013, 16:53 Nikita BernierBeO  DoneSintering BeO pellets #6 Tuesday, May 07, 2013, 16:48
 
  
  73   Monday, May 13, 2013, 12:53 Nikita BernierBeO  DoneSintering BeO pellets #6

    

       
            
 600Down.png 
  74   Monday, May 13, 2013, 17:17 Nikita BernierBeO  DoneSintering BeO pellets #6

    

       
            
  
  76   Tuesday, May 28, 2013, 17:50 John Wong Target Boat #2  DoneSintering TaC coated end capsTuesday, May 28, 2013, 17:36
The target containers endcaps were
coated with TaC solution and let dry. 
  
  83   Tuesday, August 27, 2013, 17:01 John Wong targetboat (TaC coated) DoneSintering TaC coated regular caps Tuesday, August 27, 2013, 16:48
Target boat is filled with TaC coated
endcaps (brown) and some partial sinterred
 Sintering__endcap_.jpg 
  84   Thursday, August 29, 2013, 11:53 Laura Lambert targetboat (TaC coated) DoneSintering TaC coated regular caps

    

       
            
  
  85   Tuesday, September 17, 2013, 11:21 John WongNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples) Tuesday, September 17, 2013, 11:14
Target boat contains 5 Nb discs. 
3 discs are wraps with 0.001" thin of
 Nb_sample_setup.PNGNb_800C.PNG 
  86   Thursday, September 19, 2013, 11:56 Laura LambertNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples)

    

       
            
 Capture.PNG 
  87   Thursday, September 19, 2013, 17:02 John WongNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples)

    

       
            
  
  88   Friday, September 20, 2013, 14:59 John WongNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples)

    

       
            
  
  89   Monday, September 23, 2013, 16:18 John WongNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples)

    

       
            
  
  92   Tuesday, October 29, 2013, 15:50 Anders Mjos   In progressCopper bars on TGHT and TBHT Tuesday, October 29, 2013, 15:50:
Pumping down
Wednesday, October 30, 2013, 09:32:
 Current_and_Voltage.pdf 