ID Date Author Target Material Target Oven W.O#down Source Status Subject Text Attachments
  242   Thursday, August 27, 2015, 16:37 John WongEmpty HP-FEBIADDoneSintering TaC coating container for SiC Target

    

       
            
  
  271   Thursday, January 14, 2016, 11:48 Laura Lambert   MaintenanceBacking Pump Replaced Thursday, January 14, 2016, 11:47
Backing pump was making very loud
high pitched noises during last couple processes
  
  277   Wednesday, February 24, 2016, 17:40 John WongNb LP-SISDoneBob/Tobi Nb samplesThursday, February 25, 2016, 18:04 Wednesday,
February 24, 2016, 17:29
Heat treatment of 2 bullet-shaped
 Screen_Shot_2016-02-25_at_6.04.20_PM.png 
  278   Friday, February 26, 2016, 16:02 John Wongnp-SiC TARGET BOATDoneTest#2: Carbonizing sol-gel TEOS + Pan nanofibersFriday, February 26, 2016, 15:44
5 samples were prepared at UBC MTRL
using Sol-gel tetraethyl orthosilicate (TEOS)
  
  287   Thursday, March 24, 2016, 12:05 John WongSiC TARGET BOATDoneTest#3: E-spin SiC with PANThursday, March 24, 2016, 11:37  
SiC powder (<1um) [10%] was mixed
with PAN solution [10%].  Solution was
 Screen_Shot_2016-03-26_at_3.39.35_PM.pngTGHT_faulty.PNG 
  289   Thursday, April 07, 2016, 15:23 John WongSiC TARGET BOATDoneE-spun SiC/PAN thermal treatment Thursday, April 07, 2016, 15:18
E-spun SiC/PAN fiber mats were produced
at UBC.
 SiC_PAN_1400c.PNGarchiver.PNG 
  292   Tuesday, May 03, 2016, 14:44 Laura Lambert    VACUUM PUMP REPLACEMENT Tuesday, May 03, 2016, 14:29
Turned vacuum pump on this morning,
sounded awful: loud grinding bad noises.
  
  296   Wednesday, May 11, 2016, 17:24 John Wongnp-SiC TARGET BOATDoneTemperature Treament of Nanofiber SiC/PANWednesday, May 11, 2016, 17:15
Nanofiber SiC (~50nm grain size)/PAN
was prepared at UBC. 
  
  297   Thursday, May 19, 2016, 14:38 John WongSiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) target discs The purpose of this experiment is to
determined the limiting operating temperature
for Beta-SiC.  To do so, samples will
  
  298   Friday, May 20, 2016, 08:54 Laura LambertSiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) target discs

    

       
            
  
  299   Tuesday, May 24, 2016, 11:18 John WongSiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) target discs

    

       
            
  
  313   Friday, August 12, 2016, 11:08 Laura Lambert   MaintenanceNEW PUMP FOR GLOVE BOXWednesday, August 03, 2016, 16:16
Tues July 26th had some problems
with the transfer chamber
  
  315   Thursday, August 18, 2016, 10:37 Anders Mjos   MaintenanceNew cooling lines for Heat Shield Dan made a set of new cooling lines
for the Source Tray Heat Shield cooling yesterday.
No joints on the lines. Use same VCR fitting
  
  335   Monday, October 24, 2016, 17:52 John Wongnp-SiC TARGET BOATDoneThermo test of np-SiC raw powder Monday, October 24, 2016, 17:43
Two samples were prepared and loaded
into the target boat with 1 layer of heat-shied
 Capture.JPG450A_1500C.JPG 
  336   Tuesday, November 15, 2016, 16:51 John Wongnp-SiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1Tuesday, November 15, 2016, 16:48
Three samples were prepared 
(see my logbook#1 page 3, preparing for carbonization).
  
  337   Thursday, November 17, 2016, 11:15 Laura Lambertnp-SiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1


   
        
            
  
  338   Friday, November 18, 2016, 17:28 John Wongnp-SiC TARGET BOATDoneHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1


   
        
            
  
  342   Tuesday, December 20, 2016, 15:04 Laura Lambert   MaintenanceRETURN and SUPPLY valves CLOSED for xmas breakTuesday, December 20, 2016, 15:05
confirmed ~full tank of Ar for glove
box --> ~1600psi 
  
  344   Friday, February 03, 2017, 14:18 Laura LambertEndcaps TARGET BOATProblemsSintering TaC coating on Ta endcaps and springs Friday, February 03, 2017, 14:17
The endcaps are stacked together
 IMG_1526.JPGIMG_1527.JPG 
  345   Monday, February 06, 2017, 11:17 Anders Mjos   Problems resolvedIOC restart after power outagae Dave Morris did a remote restart
of the IOC after the outage. Turbo pump started.
  