Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 29 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Sourcedown Status Subject Text Attachments
  33   Thursday, June 21, 2012, 18:13 John WongNiOTa target boat FailedNiO development - Container broke!

    

       
            
 NiO_targets_temp.pdfTGHT_0-580A.GIFTGHT_200-580A.GIFTGHT_vs_VOL.GIFNiO_container_broke.png 
  34   Thursday, July 12, 2012, 17:55 John WongNiOtargetboat (TaC coated) Maintenance NiO development- test#2Thursday, July 12, 2012, 17:29
NiO was sprayed on Ni foil.
Average/discs: mass= 0.075g, thickness=0.076mm,
 NiO_spray.PNGTGHT0-250A.png 
  35   Tuesday, July 17, 2012, 16:00 John Wong targetboat (TaC coated) DoneSintering TaC coated regular- & D-endcapsTuesday, July 17, 2012, 15:45
Target boat is filled with TaC coated
regular- and D-endcaps. 
  
  38   Monday, July 30, 2012, 15:42 John Wong   ProblemsChiller maybe leakyMonday, July 30, 2012, 15:38
The evaporator was used for the processing
the NiO target for 8 days and it was discovered
 chiller.jpg 
  39   Friday, August 10, 2012, 19:57 Nikita Bernier   DoneSintering Ta foil with TaO coating Friday, August 10, 2012, 19:54
 
  
  40   Saturday, August 11, 2012, 19:21 Nikita Bernier   DoneSintering Ta foil with TaO coating

    

       
            
 TaO1.pngTaO2.png 
  41   Monday, August 13, 2012, 13:50 Nikita Bernier   DoneSintering Ta foil with TaO coating

    

       
            
 TaO3.png 
  42   Tuesday, August 14, 2012, 15:11 John Wong   MaintenanceReplacing Cu-heatshield insulatorsTuesday, August 14, 2012, 15:01
The Cu-heatshield insulators are
broken due to prolong heating time during
 insulators.PNGMM800_insulator.PNG 
  44   Tuesday, August 14, 2012, 17:11 John Wong   FailedSintering Ta2O5 coating on Ta foil failed

    

       
            
 Ta2O5_coating.PNG 
  46   Monday, September 24, 2012, 15:12 Nikita BernierTaC  DoneSintering Ta foil with TaC coating Monday, September 24, 2012, 15:01
The target boat with TaC coating
is being used again. The inside of the boat
 striptool1.PNG 
  47   Monday, September 24, 2012, 18:09 Nikita BernierTaC  DoneSintering Ta foil with TaC coating

    

       
            
 striptool2.PNGstriptool4.PNGstriptool5.PNG 
  48   Wednesday, September 26, 2012, 15:06 Nikita BernierTaC  DoneSintering Ta foil with TaC coating

    

       
            
 striptool6.pngSans_titre2.png 
  49   Wednesday, September 26, 2012, 15:14 Nikita BernierBeO  DoneSintering BeO Pellets #4 Wednesday, September 26, 2012, 15:07
 
 Sans_titre3.png 
  50   Friday, September 28, 2012, 12:59 Nikita BernierBeO  DoneSintering BeO Pellets #4

    

       
            
 striptool7.pngstriptool8.PNGRetired.png 
  53   Friday, January 11, 2013, 11:16 John Wong   MaintenanceReplace terminal insulatorFriday, January 11, 2013, 10:59
The insulator that holds the terminals
was broken when a target container was installed. 
 broke_insulator.PNG 
  54   Friday, January 11, 2013, 14:00 John WongEmptyTa-Target boat DoneTesting QMS & thermocouples Friday, January 11, 2013, 13:52
TEST#1
A new target boat is coated with
 evap2_thermocouple_setup.PNGQMS_temperature_setup.PNG008_all_temp.png018.png022.png 
  55   Friday, January 11, 2013, 15:16 Anders Mjos   MaintenanceReplace terminal insulator

    

       
            
 ITD0052C_revB.pdfinstalled_insulators.jpegta_heat_shields.jpeg 
  59   Monday, March 04, 2013, 17:41 John WongEmptyLP-SIS RFQ ver 2.0  Testing LPSIS RFQ ver 2.0 Monday, March 04, 2013, 17:39
This is the 2nd modified target container
for RFQ LPSIS.  The container will be
  
  67   Friday, April 19, 2013, 09:39 Rick MaharajEmpty  Donethermocouple Feedthru A thermocouple feedthru was installed
via 9 pin sub-D connector. It runs from the
the conflat cross on the top of the evaporator
  
  72   Tuesday, May 07, 2013, 16:53 Nikita BernierBeO  DoneSintering BeO pellets #6 Tuesday, May 07, 2013, 16:48
 
  
ELOG V2.9.2-2455