  490   Thursday, July 16, 2020, 11:15 Darwin Ortiz RosalesSiC44139-11LP-SISDoneSiC sintering for Luca 1 of 2 Thursday, July 16, 2020, 11:15
Coated Ta tube cotaining
  
  491   Monday, July 20, 2020, 19:25 Darwin Ortiz RosalesSiC44139-11LP-SISDoneSiC sintering for Luca 2 of 2Monday, July 20, 2020, 19:27 
Coated Ta tube cotaining 355
  
  493   Friday, July 31, 2020, 11:16 Ferran Boix PamiesEmpty41882-1TARGET BOATDoneThermocouple measurent of boat temperatureBoat with attached thermocouple type C
with AREMCO ceramabond glue installed in
evap2 the 30-07-2020
  
  495   Wednesday, August 05, 2020, 19:14 Ferran Boix PamiesEmpty41882-1TARGET BOATDoneParasitic target cooling test 2020-08-05 7.13pm Roughing pump on
2020-08-06 10:48am Turbo was turned
on by Marla in the morning. Vacuum IGP1 4e-6Torr.
  
  498   Wednesday, August 12, 2020, 11:57 Marla CervantesEmpty44489-9TARGET BOATDonePristine Ta tube calibration Short oven loaded with additional
hardware are spacers into the flex-line HS.
  
  499   Tuesday, August 18, 2020, 09:26 Marla CervantesTaC44489-15TARGET BOATDoneTaC coating/sintering  Tuesday, August 18, 2020, 09:06
A short tantalum tube was coated
with TaC and wrapped with 3 layers of Ta,
  
  500   Tuesday, August 18, 2020, 10:41 Marla CervantesTaC44489-11 DoneTaC coating/sintering Thursday, August 19, 2020, 17:28
 A short tantalum tube
  
  501   Saturday, August 22, 2020, 11:44 Marla Cervantes 44489-11 DoneC-Cartridge test#1Saturday, August 22, 2020, 11:41
A Ta short tube was coated with TaC
and sintered, then it was loaded with a c-cartridge
  
  502   Wednesday, August 26, 2020, 10:27 Marla Cervantes 44489-8 DoneC-Cartridge test #2 Wednesday, August 26, 2020, 10:26
A Ta short tube was loaded with
  
  503   Sunday, August 30, 2020, 18:28 Marla CervantesEmpty44489-13 DoneTaC coating/sintering Sunday, August 30, 2020, 06:47
A short tantalum tube was coated
  
  504   Monday, August 31, 2020, 12:57 Marla Cervantes 44489-15  DoneTaC coating heating test Monday, August 31, 2020, 12:23
A short naked Ta tube (no heat shielding),
previously coated with TaC was set under
  
  505   Saturday, September 05, 2020, 21:33 Marla CervantesEmpty  DonePristine Ta tube calibrationSaturday, September 05, 2020, 12:56
A Ta tube was wrapped with 3
  
  506   Thursday, September 10, 2020, 07:53 Aaron SchmidtEmpty41790-8LP-FEBIADDoneFernando FEBIAD / Anode testing. FEBIAD installed. Anode PS installed.
ANODE connected!.
Leak check
  
  507   Thursday, September 17, 2020, 16:11 Marla CervantesEmpty44139-9LP-SISDoneTaC coating/sintering Thursday, September 17, 2020, 16:10
An LP-SIS was wrapped with 3 Ta layers,
and installed in the EVAP2
  
  508   Monday, September 21, 2020, 17:01 Marla Cervantes 44139-8-SKTARGET BOATDoneConditioning graphite target #3 Monday, September 21, 2020, 16:50
450 graphite foils coated with graphite
slurry were loaded in a tantalum tube, the
 Voltage-Increment.JPGConditioning-C-3.JPG 
  510   Friday, September 25, 2020, 10:32 Darwin Ortiz RosalesNb TARGET BOATDoneHeat Treatment of Nb for EdwardFriday, September 25, 2020, 10:30 
Target boat with a layer of
  
  511   Monday, September 28, 2020, 09:36 John WongNb TARGET BOATDoneHeat Treatment of Nb for Edward


   
        
            
  
  515   Friday, October 09, 2020, 09:50 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDoneTests, radiation gun for parasitic target 2020-10-09 9:48 The target was installed
the day before and left pumping over night.
IGP1=4.7e-7Torr. leak check when water on,
  
  516   Tuesday, October 13, 2020, 11:15 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDonefoil heating 2020-10-13 11:13 Target was left
under vacuum over the weekend. IGP1: 1.6e-7T
water on- leak check ok. Ramping up 2A/30s
  
  517   Thursday, October 15, 2020, 18:51 Ferran Boix PamiesEmpty44139-7-SKTARGET BOATDoneheat gun plus parasitic target thermal comissioning. 2020-10-15 18:51 : Setup installed
during the day. Pumped down to IGP1:1.5e-5T
, water leak check ok. Ramping up to 100A. 
  