  215   Friday, June 12, 2015, 16:08 John WongEmpty40860-1LP-IG-LISIn progressRe-Sintering TaC coating container for UCx

    

       
            
  
  216   Sunday, June 14, 2015, 09:40 John WongEmpty40860-1LP-IG-LISDoneRe-Sintering TaC coating container for UCx

    

       
            
 2coats.png 
  530   Tuesday, February 23, 2021, 08:59 Marla Cervantes NA (Cu-tube) DoneRe coating Test 2 Tuesday, February 23, 2021, 08:49
Yesterday a heat shield was washed
and when dry it was installed in the EVAP2,
  
  528   Thursday, February 11, 2021, 10:57 Marla Cervantes NA DoneRe coating Test 1Thursday, February 10, 2021, 12:00
Objective: Heat a Re wire to evaporate
it and deposit a layer of Re on the inner
  
  537   Tuesday, March 23, 2021, 08:07 Aaron Schmidt    Re - Ta test. Leak check. Modified HS installed with new brackets
as per Marla.
Tuesday, March 23, 2021, 08:02: Vacuum
  
  539   Thursday, March 25, 2021, 07:57 Aaron Schmidt    Re - Ta test. Leak check.Thursday, March 25, 2021, 07:55: Vacuum
@ 5.12e-07T. Waterlines opened.
  
  321   Monday, September 12, 2016, 17:27 John WongEmpty39530-9HP-SISDoneRUSH. Round 2: Sinering TaC coating

    

       
            
 Screen_Shot_2016-09-14_at_5.05.08_PM.pngScreen_Shot_2016-09-14_at_5.03.48_PM.png 
  368   Thursday, May 11, 2017, 11:25 Laura LambertEmpty41369-10HP-FEBIAD-CTLDoneRUSH! Sintering TaC coated container for SiC#36 Thursday, May 11, 2017, 11:21
Turns out SiC HP-FEBIAD that has
finished conditioning is loaded in the wrong
 LS_during_TaC_sintering.jpgRS_during_TaC_sintering.jpg 
  219   Monday, June 22, 2015, 13:11 John WongEmpty38817-6HP-SISIn progressRUSH! Sintering TaC coated container for SiC Monday, June 22, 2015, 13:00
Containers is coated with TaC. Wrapped
with 3 layers of Ta heat-shield.  Air
  
  220   Tuesday, June 23, 2015, 10:18 Laura LambertEmpty38817-6HP-SISDoneRUSH! Sintering TaC coated container for SiC

    

       
            
  
  221   Tuesday, June 23, 2015, 12:26 John WongSiC38817-6HP-SISIn progressRUSH! SiC backup target undergoes sintering processTuesday, June 23, 2015, 12:21
Target container is loaded with 485
discs of SiC with packed length of 17.4cm. 
  
  222   Thursday, June 25, 2015, 16:13 Laura LambertSiC38817-6HP-SISDoneRUSH! SiC backup target undergoes sintering process

    

       
            
 IMG_20150625_152233125.jpgIMG_20150625_152256456.jpg 
  494   Wednesday, August 05, 2020, 13:38 Aaron Schmidt    RP Swap on EVAP 2 BP1 swapped with RP2 (TS beamline)
U-line installed.
Wednesday, August 05, 2020, 13:37:
  
  342   Tuesday, December 20, 2016, 15:04 Laura Lambert   MaintenanceRETURN and SUPPLY valves CLOSED for xmas breakTuesday, December 20, 2016, 15:05
confirmed ~full tank of Ar for glove
box --> ~1600psi 
  
  174   Wednesday, January 14, 2015, 13:46 Anders MjosEmpty  MaintenancePumping down for water leak test Wednesday, January 14, 2015, 13:46:
Roughing
Wednesday, January 14, 2015, 14:57:
  
  489   Monday, July 13, 2020, 11:03 Aaron Schmidt    Pump down / leak / vacuum check. Darwin reported that he was unable
to achieve vacuum of 150mTorr. The flex-line
HS had been removed last week for modifications.
  
  498   Wednesday, August 12, 2020, 11:57 Marla CervantesEmpty44489-9TARGET BOATDonePristine Ta tube calibration Short oven loaded with additional
hardware are spacers into the flex-line HS.
  
  505   Saturday, September 05, 2020, 21:33 Marla CervantesEmpty  DonePristine Ta tube calibrationSaturday, September 05, 2020, 12:56
A Ta tube was wrapped with 3
  
  531   Friday, February 26, 2021, 09:28 Ferran Boix PamiesEmptynone DoneParasitic target thermal tests Tests were performed with external
power supply. No target boat or container.
Small power on heating small heating
  
  544   Tuesday, March 30, 2021, 19:49 Ferran Boix PamiesEmpty44139-7-SK  DoneParasitic target thermal tests 2021-03-30 7:48 Target loaded with
parasitic target only. No container. Leaving
under vacuum over night.
 20210403_174815.jpg20210403_183102.jpg 