  187   Thursday, April 23, 2015, 10:17 John WongSiC38817-7HP-SISDoneSintering SiC#31

Laura Lambert wrote:

 Friday, April 17, 2015, 16:01

Total number of foils: 520 discs

Total mass of materials [incl graphite foils]: 60.2441g

Total length packed: 17.0cm

Container is wrapped with 3x Ta-heat shields.

No endcaps inserted to allow outgasing.

Currently being pumped down.


 Monday, April 20, 2015, 11:08

Target container is coated with TaC and wrapped with 3-Ta heat shields, not incl center block.

TGHT and TBHT will be ramped up to 820A and 230A, respectively.

Chamber pumped down over the weekend.

IGP1 = 2.1e-7 Torr.

HS cooling water valves opened; no leaks detected.

TGHT max voltage = 18V, TBHT max voltage = 5V

....

attempted to start stepping up manually.

power supply not responding to epics controls for TBHT only...looking into problems now...


 Monday, April 20, 2015, 16:06

Epics is working.

Power supply connections unplugged/plugged back in.

Everything working again.

Tapped up manually to 40A.

Waited ~1hr30 for vacuum to stabilize.

IGP1 = 1.8e-6 Torr.

Good vac = 3e-5 Torr. Bad vac = 4e-5 Torr.

TGHT and TBHT will be ramped up to 820A and 230A, respectively.

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.


 Wednesday, April 22, 2015, 15:23

TGHT = 200A, 2.26V; TBHT = 117A, 1.58V

IGP1 = 9.8e-6 Torr.

Increasing auto-ramp to 0.4A/min and 0.2A/min for the TGHT and TBHT respectively.


 

 Thursday, April 23, 2015, 10:15

Vac at 2.e-6 Torr.  Increased TGHT ramping rate to 1.0A/min.  Current temperature at 1443C, TGHT at 641A, TBHT at 230A.


 Thursday, April 23, 2015, 15:02

Evap#2 window for the temp reader is now coated, so temp reading is not available.  (see attachment). 

TGHT has been at 820A/13.45V for almost 2 hours, will continue to heat at this current for a few more hours.  Will initiate the cooling process from home…  


 Thursday, April 23, 2015, 22:31

Target has been heated at 820A for about 9.5hrs.  Current vacuum at 4.7e-7 Torr.

Initiating cooling process at -2A/min for TGHT and -1A/min for TBHT.


Friday, April 24, 2015, 10:13  

Target has been cooled at 0A for about 5 hours.  Chamber is currently being vented and the target will be taken out for inspection.

 


Friday, April 24, 2015, 12:37  

The target was inspected.  

Some yellow crystals were form around the ends but they were easily removed this time.  

With both ends open during the sintering process and shorten the target length with 1cm space of both side, the target is looking a lot better.  

 No visible damage on the target surface.  

Inside, the channel has a clear pathway, and the discs are nicely aligned.  

End caps and Rh foils are inserted - It's ready for assembly.

See link for pics after the sintering process.

https://www.dropbox.com/sh/w5k4l3fezfat2cm/AAAyX67zyUPUVvN_WzEHFXM2a?dl=0

 


 

Attachment 1: Screen_Shot_2015-04-23_at_3.04.01_PM.png
Screen_Shot_2015-04-23_at_3.04.01_PM.png
  219   Monday, June 22, 2015, 13:11 John WongEmpty38817-6HP-SISIn progressRUSH! Sintering TaC coated container for SiC

Monday, June 22, 2015, 13:00

Containers is coated with TaC. Wrapped with 3 layers of Ta heat-shield.  Air blown to for quick dry.

Installed, and pumped down, vac currently at 6.7e-6 Torr. 

HS water valve open, no leaks detected. 

Stepping up TGHT/TBTH:  50A.


 Monday, June 22, 2015, 14:22

Pressure is coming down, currently at 1.75e-5 Torr.

auto-ramping initiated: TGHT = 820A; TBHT = 230A, rate at 2A/min.


 Tuesday, June 23, 2015, 00:50

Target container has reached to 1860C and has been heated for almost 4 hours, with TGHT at 800A/12.60V, DV = 6.28. TBHT at 230A/3.8V.  

Vac at 3e-6 Torr.  

Cooling down at 2A/min.  

Chamber can be vented tomorrow and SiC can be loaded in for the sintering process. 


 

  220   Tuesday, June 23, 2015, 10:18 Laura LambertEmpty38817-6HP-SISDoneRUSH! Sintering TaC coated container for SiC

John Wong wrote:

Monday, June 22, 2015, 13:00

Containers is coated with TaC. Wrapped with 3 layers of Ta heat-shield.  Air blown to for quick dry.

Installed, and pumped down, vac currently at 6.7e-6 Torr. 

HS water valve open, no leaks detected. 

Stepping up TGHT/TBTH:  50A.


 Monday, June 22, 2015, 14:22

Pressure is coming down, currently at 1.75e-5 Torr.

auto-ramping initiated: TGHT = 820A; TBHT = 230A, rate at 2A/min.


 Tuesday, June 23, 2015, 00:50

Target container has reached to 1860C and has been heated for almost 4 hours, with TGHT at 800A/12.60V, DV = 6.28. TBHT at 230A/3.8V.  

Vac at 3e-6 Torr.  

Cooling down at 2A/min.  

Chamber can be vented tomorrow and SiC can be loaded in for the sintering process. 


 

 Tuesday, June 23, 2015, 10:17

vented in air and opened up this morning.

coating looks good.

loading container now...


 

  221   Tuesday, June 23, 2015, 12:26 John WongSiC38817-6HP-SISIn progressRUSH! SiC backup target undergoes sintering process

Tuesday, June 23, 2015, 12:21

Target container is loaded with 485 discs of SiC with packed length of 17.4cm. 

Container is wrapped with 3 Ta-heat shields and previously coated/sintered with TaC.

Chamber is currently being pumped down

TGHT will be ramped up to 800A, ~1800C, and TBHT is limited to 230A max.


 Tuesday, June 23, 2015, 15:53

HS valves are open, no leaks detected.

TGHT stepped up to 70A, pressure is currently at 4.17e-5 torr and coming up. 

Initiated auto-ramping at 0.5A/min for both TGHT and TBHT: good vac at 3.0e-5, bad vac at 4.0e-5 Torr.


 Wednesday, June 24, 2015, 00:03

Stopped auto-ramping about 2 hours ago.  

Manual stepped up TGHT to 73A.  Vac is stabilizing at 5e-8 Torr.  Will keep it at that current over night.


 Wednesday, June 24, 2015, 07:41

Vac has come down to 3.6e-6 Torr.

Continue to step up TGHT...


 Wednesday, June 24, 2015, 23:52

It has been a super long day operating the evaporator and finally the target is up to 1800C.  Vac is coming down from 2.e-5 Torr. 

TGHT is at 790A/12.61V, DV at 6.60V, TBHT at 230A/3.57V.  Omega temp reader is at 1680C - that's due to the window being coated with SiC, as expected. 

Target will continue heated at that current for over night, and will start the cooling process next AM. 


Thursday, June 25, 2015, 06:18  

Target is holding pretty well over night.  Vac is coming down to 1.6e-6 Torr. 

Initiated cooling down at 2A/min. 


 

  222   Thursday, June 25, 2015, 16:13 Laura LambertSiC38817-6HP-SISDoneRUSH! SiC backup target undergoes sintering process

John Wong wrote:

Tuesday, June 23, 2015, 12:21

Target container is loaded with 485 discs of SiC with packed length of 17.4cm. 

Container is wrapped with 3 Ta-heat shields and previously coated/sintered with TaC.

Chamber is currently being pumped down

TGHT will be ramped up to 800A, ~1800C, and TBHT is limited to 230A max.


 Tuesday, June 23, 2015, 15:53

HS valves are open, no leaks detected.

TGHT stepped up to 70A, pressure is currently at 4.17e-5 torr and coming up. 

Initiated auto-ramping at 0.5A/min for both TGHT and TBHT: good vac at 3.0e-5, bad vac at 4.0e-5 Torr.


 Wednesday, June 24, 2015, 00:03

Stopped auto-ramping about 2 hours ago.  

Manual stepped up TGHT to 73A.  Vac is stabilizing at 5e-8 Torr.  Will keep it at that current over night.


 Wednesday, June 24, 2015, 07:41

Vac has come down to 3.6e-6 Torr.

Continue to step up TGHT...


 Wednesday, June 24, 2015, 23:52

It has been a super long day operating the evaporator and finally the target is up to 1800C.  Vac is coming down from 2.e-5 Torr. 

TGHT is at 790A/12.61V, DV at 6.60V, TBHT at 230A/3.57V.  Omega temp reader is at 1680C - that's due to the window being coated with SiC, as expected. 

Target will continue heated at that current for over night, and will start the cooling process next AM. 


Thursday, June 25, 2015, 06:18  

Target is holding pretty well over night.  Vac is coming down to 1.6e-6 Torr. 

Initiated cooling down at 2A/min. 


 

 Thursday, June 25, 2015, 16:09

Vented in air and took out this afternoon.

Target looks good [see photos]

Window for OMEGA fully coated from outgassing of target materials

Attachment 1: IMG_20150625_152233125.jpg
IMG_20150625_152233125.jpg
Attachment 2: IMG_20150625_152256456.jpg
IMG_20150625_152256456.jpg
  183   Monday, March 09, 2015, 16:50 Laura LambertTa38817-5HP-SISIn progressConditioning Ta target

 Monday, March 09, 2015, 16:47

Target consists of 400 discs.

Total packed length 3.4cm

Total mass 45.8181g

Re foil inserted.

Chamber is currently being pumped down.

No Ta-heat shield wrapped.

One end-cap inserted on left (wrt ionizer into the page)

TGHT and TBHT will be ramped up to 820A/230A respectively at 2.0A/min.


 Tuesday, March 10, 2015, 10:28

HS water valves opened, no leaks detected.

IGP1 = 4.5e-7 Torr.

Power supply not responding to epics...AGAIN. grrrr 


Tuesday, March 10, 2015, 13:17  

IOC was rebooted - back up and running again! yay! 

IGP1 = 4.0e-7 Torr.

Tapped up manually to 35A, waited ~30min, vaccuum stable.

Initiating auto-ramp.

Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.


 Wednesday, March 11, 2015, 09:11

Target has been at max setpoints for ~14hrs.

OMEGA = 1472C

TGHT = 820A, 12.85V

TBHT = 230A, 3.696V

IGP1 = 5.5ee-7 Torr

Manually tapping up to obtain hotter internal temperature...


 Wednesday, March 11, 2015, 11:33

Current conditions:

OMEGA = 1565C

TGHT = 900A, 14.3V

TBHT = 230A, 3.7V

IGP1 = 6.3e-7 Torr

Digital pyrometer readings:

Hottest point on left leg, WRT ionizer tube into page = 2400C

Internal temp of container = 1580C

Sat at this temperature ~45min.

Initiating auto-cool at TGHT 2.0A/min, TBHT 1.0A/min

[See attached photo for collected data]


 Thursday, March 12, 2015, 13:12

vented and opened up this morning.

only reached a max internal temp of 1580C.

therefore added 3xTa heat shield and will re-condition at a higher temp.

currently pumping back down.


 Thursday, March 12, 2015, 14:34

IGP1 = 7.0e-7 Torr

stepped up to 35A, waited ~30min, vacuum stable.

IGP1 = 6.1e-7 Torr

Initating ramp-up...


 Friday, March 13, 2015, 07:47

IGP1 = 2.9e-7 Torr

reached max set points for TGHT = 600A, TBHT = 230A

Initiating manual tap-up.


 Friday, March 13, 2015, 10:31

Reached 720A, 1800C at 0850

Will continue to heat for ~3hrs

[see attachment for collected data]


 Friday, March 13, 2015, 12:00

Sat at max temperature, 1800C, for 3 hours.

Initiating auto-cool at 2.0A/min for TGHT and 1.0A/min for TBHT.


 

Attachment 1: first_ramp_up.JPG
first_ramp_up.JPG
Attachment 2: second_ramp_up_with_Ta_heat_shields.JPG
second_ramp_up_with_Ta_heat_shields.JPG
  184   Monday, March 16, 2015, 17:38 John WongTa38817-5HP-SISDoneConditioning Ta target

Laura Lambert wrote:

 Monday, March 09, 2015, 16:47

Target consists of 400 discs.

Total packed length 3.4cm

Total mass 45.8181g

Re foil inserted.

Chamber is currently being pumped down.

No Ta-heat shield wrapped.

One end-cap inserted on left (wrt ionizer into the page)

TGHT and TBHT will be ramped up to 820A/230A respectively at 2.0A/min.


 Tuesday, March 10, 2015, 10:28

HS water valves opened, no leaks detected.

IGP1 = 4.5e-7 Torr.

Power supply not responding to epics...AGAIN. grrrr 


Tuesday, March 10, 2015, 13:17  

IOC was rebooted - back up and running again! yay! 

IGP1 = 4.0e-7 Torr.

Tapped up manually to 35A, waited ~30min, vaccuum stable.

Initiating auto-ramp.

Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.


 Wednesday, March 11, 2015, 09:11

Target has been at max setpoints for ~14hrs.

OMEGA = 1472C

TGHT = 820A, 12.85V

TBHT = 230A, 3.696V

IGP1 = 5.5ee-7 Torr

Manually tapping up to obtain hotter internal temperature...


 Wednesday, March 11, 2015, 11:33

Current conditions:

OMEGA = 1565C

TGHT = 900A, 14.3V

TBHT = 230A, 3.7V

IGP1 = 6.3e-7 Torr

Digital pyrometer readings:

Hottest point on left leg, WRT ionizer tube into page = 2400C

Internal temp of container = 1580C

Sat at this temperature ~45min.

Initiating auto-cool at TGHT 2.0A/min, TBHT 1.0A/min

[See attached photo for collected data]


 Thursday, March 12, 2015, 13:12

vented and opened up this morning.

only reached a max internal temp of 1580C.

therefore added 3xTa heat shield and will re-condition at a higher temp.

currently pumping back down.


 Thursday, March 12, 2015, 14:34

IGP1 = 7.0e-7 Torr

stepped up to 35A, waited ~30min, vacuum stable.

IGP1 = 6.1e-7 Torr

Initating ramp-up...


 Friday, March 13, 2015, 07:47

IGP1 = 2.9e-7 Torr

reached max set points for TGHT = 600A, TBHT = 230A

Initiating manual tap-up.


 Friday, March 13, 2015, 10:31

Reached 720A, 1800C at 0850

Will continue to heat for ~3hrs

[see attachment for collected data]


 Friday, March 13, 2015, 12:00

Sat at max temperature, 1800C, for 3 hours.

Initiating auto-cool at 2.0A/min for TGHT and 1.0A/min for TBHT.


 

 Monday, March 16, 2015, 17:30

Target was removed from Evap#2.  It was successfully conditioned. 

The other end cap was inserted and expended. 

Standard salts were added.   And Re foil is inserted. 

Target is ready for assembly.


 

  82   Wednesday, August 21, 2013, 12:30 John WongTa38817-10HP-SISDoneConditioning Ta target

Wednesday, August 21, 2013, 12:28

Container is filled with 400 discs of Ta foils, and wrapped with 3 layers of Ta heat shields.

No caps are inserted during the conditioning. 

Chamber is currently being pumped down. 


 Wednesday, August 21, 2013, 15:54

HS cooling water valves opened, no leaks were detected.

IG @ 2.9e-6 Torr.

Heating setting:

TGHT max = 820A,

TBHT max = 230A

ramping rate 2A/min.


 Thursday, August 22, 2013, 12:45

TGHT/TBHT reached to 820A/230A, respectively. 

So much out-gassing was observed at the max currents.  (see attachment#1).

TGHT/TBHT are ramping down at 4A/min. 

Chamber will be vented in air.

The target will will be inspected.

More info later...


 Thursday, August 22, 2013, 16:44

Target was removed from the evaporator and inspected.

The container and the Ta materials look OK. 

The outgassing could be from the Ta-heat shields; they look burnt and brittle.

Overall, the target is good.


 

Attachment 1: Ta#41_conditioning.PNG
Ta#41_conditioning.PNG
  79   Monday, July 22, 2013, 15:03 John WongEmpty38634-7LP-SISDoneSintering empty target oven coated with TaC for UCx#7

Monday, July 22, 2013, 15:00

Target container is coated with TaC - this container will be used for UCx#7.

Container is wrapped with 3 layers of Ta, including the back-block.

For the sintering process:

TGHT will be ramped up to 580A at 0.2A/min

TBHT will be ramped up to 230A at 0.2A/min.

Chamber has been pumped down.  HS cooling H2O valves are opened, and no leaks are detected. 

Currently IGP1 @ 7.03e-6 Torr. 


 Monday, July 22, 2013, 15:19

TGHT/TBHT was stepped up to 20A.  Pressure increased to ~1.2e-5 Torr.

Auto-ramping initiated...


 Wednesday, July 24, 2013, 18:40

TGHT and TBHT have reached to 580A/230A, respectively.  Target has been heated for ~4 hours at that max current.

Vacuum currently at 1.65e-6 Torr.

Auto-cooling initiated... (TGHT @ -1A/min, TBHT -0.5A/min)

Target will be vented in air tomorrow.


 

  37   Sunday, July 22, 2012, 20:51 John WongNiO38481-7HP-FEBIADDoneSintering NiO#1

 Sunday, July 22, 2012, 20:30

The NiO target materials were loaded into the container today.  

Total discs = 500, (10 discs/pack) 


length (after loaded) = 9.0cm 

Target container is wrapped with Ta-heat shields, and will be removed after the sintering process. 

One regular end cap is inserted (with Ni-foil inserted as a divider).  The caps, however, are very loose (tried 2 caps and still loose).  Hopefully the thermo diffusion bonding will seal the cap... 

The other end is inserted with a D-cap for out-gassing proposes, and will be replaced with the regular end-cap after the process. 

(see attachment#1)


Sunday, July 22, 2012, 20:48 

The camber has been pumped down and currently IG1=1.3e-6 Torr.

The HS cooling water was turned on and no leaks were detected.  

TGHT and TBHT were stepped up to 50A. 

Auto-ramping is initiated at 0.2A/min for TGHT max = 250A, TBHT max = 230A. 


 Thursday, July 26, 2012, 23:31

TGHT and TBHT have reached to 250A (local @ 242A/2.88V) and 230A, respectively, and have stayed for ~4hrs (see attachment#2)  

Currently, IGP1 = 4.9e-7 Torr, IGP2 = 3.5e-7 Torr, CG1B = 13mTorr. 

Initiating auto-cool down at 2A/min.  


 Monday, July 30, 2012, 15:11

The chamber was vented and the target was removed.

There was significant condensation oily fluid coated Cu-heatshield lid and around the ionizer opening.

Overall, the target looks very good.  The NiO target material was nicely sintered.  No shrinkage or loose particles were observed (see attachment #3).

The endcap, however, was not properly fitted and it just fell off, (see attachment #4). 

Both ends of the target are currently opened; the expension tool for the endcap is in order and hopefully this will solve the problem.

The target is being stored in the fumehood


 

Attachment 1: NiO#1_sinteringevap2.png
NiO#1_sinteringevap2.png
Attachment 2: NIO#1_TGHT_TBHT_250_220.png
NIO#1_TGHT_TBHT_250_220.png
Attachment 3: Sintered_NiO.GIF
Sintered_NiO.GIF
Attachment 4: Endcap.GIF
Endcap.GIF
  75   Tuesday, May 14, 2013, 17:15 John WongEmpty38481-6HP-FEBIADDoneSinteringTaC coating

Tuesday, May 14, 2013, 17:04

Target oven is coated with TaC, and wrapped with 3-Ta heat shields.

TGHT and TBHT will be ramped up to 820A and 300A, respectively.

Ramping rate set to 1A/min.

Good Vac at 3.e-5 Torr, Bad Vac @ 4.0e-5 Torr.

Chamber is currently being pumped...


 Wednesday, May 15, 2013, 10:56

Chamber has pumped down to 4.5e-7 Torr. 

HS cooling water valves opened; no leaks were detected.

Stepping up TGHT/TBHT to 80A; monitoring vacuum.


 Wednesday, May 15, 2013, 11:26

Pressure is increasing.  TGHT setpoint @ 80A, readback @ 88.6A/0.603V, local @ 83A/0.80V.


 Wednesday, May 15, 2013, 12:08

TGHT/TBHT stepped up to 140A and tripped off at high limit vacuum.

Restarted p/s and set TBHT/TGHT at 100A

Initiated auto ramping...


 Friday, May 17, 2013, 11:39

TGHT and TBHT reached to 820A and 300A, respectively.  Target has been heating at the max currents for ~12hrs. 

Vacuum is coming down to 4.3e-7 Torr. 

The TaC coating sintering is completed.

Autocooling is initiated.  TGHT ramping rate @ 2A/min, and 1A/min for TBHT.


Wednesday, May 22, 2013, 10:43

Sintering complete.

Chamber will be vented


 

  77   Monday, June 17, 2013, 16:59 Laura LambertSiC38481-6HP-FEBIADDoneSintering of SiC #29

Monday, June 17, 2013, 16:57

Target is loaded with 510 SiC discs

Container was previously coated with TaC and sintered

SiC is wrapped with tantalum heat shield

Chamber is currently being pumped down


 

  78   Tuesday, June 18, 2013, 16:40 John WongSiC38481-6HP-FEBIADDoneSintering of SiC #29

Laura Lambert wrote:

Monday, June 17, 2013, 16:57

Target is loaded with 510 SiC discs

Container was previously coated with TaC and sintered

SiC is wrapped with tantalum heat shield

Chamber is currently being pumped down


 

 Tuesday, June 18, 2013, 16:16

HS water valves opened; no leaks were detected.

IG @ 8.9e-7 Torr.

Note: This target has a regular end cap inserted on one end, and the other with a D-cap. 

TGHT will be heated up to 820A and TBHT to 300A; ramping rate at 1A/min.

Stepped up TGHT/TBHT to 60A.  Vacuum slowly increasing... 


 Tuesday, June 18, 2013, 17:55

Stepped up TGHT/TBTH to 80A.  10 mins later, pressure went beyond the limit and tripped of the p/s.  F!

Allowed vacuum to come down below 8e-5 Torr.  Stepped down TGHT/TBHT to 50A.

Currently IG @ 4.8-5 Torr. 

Initiated auto-ramping:  setting: Good Vac = 3e-5 Torr, Bad Vac = 4.0e-5 Torr. 


 Thursday, June 20, 2013, 06:21

About 10 min ago, Evap tripped off due to high vacuum. 

Vacuum came back down below the trip limit and both TGHT/TBHT p/s were stepped down to 40A and turned back on.

Changed auto ramping rate to 05A/120min.  

The process continues...  (And I'm going back to sleep!) 


 Friday, June 21, 2013, 15:19

Vacuum is close to the trip limit. 

Change the ramping rate to 0.2A/120min. 


 Monday, June 24, 2013, 17:04

Organic burnt out is complete and vacuum has come down to ~9.0e-6 Torr.

Increase ramping rate to 0.2A/60min - The sintering process should take about another 2 days if everything goes smoothly. 


 Wednesday, June 26, 2013, 17:29

TGHT & TBHT have reached to 820A and 300A, respectively, for 4 hours.

Vacuum is at 9e-7 Torr. 

Cooling down is in progress, at a rate of 1.0A/min for TGHT and 0.5A/min for TBHT.

The target will be ready to come out by tomorrow.


 Thursday, June 27, 2013, 11:02

TGHT/TBHT reached to 0A.  Vacuum is leveled at 1.2e-7 Torr. 

Chamber will be vented in air soon.


 

 

  71   Tuesday, April 30, 2013, 11:20 Anders MjosEmpty38481-5HP-FEBIADDoneCTL thermal test

 CTL block on T/C F/T Ch 1
Supply on Ch 3
HS Return on Ch 4

Tuesday, April 30, 2013, 11:20: Roughing

Tuesday, April 30, 2013, 11:45: Turbo started


Wednesday, May 01, 2013, 08:43: Cooling water opened. Vacuum stable at 5.1E-7 T (IGP1)

Wednesday, May 01, 2013, 08:48: Ramping TGHT and TBHT to 850A and 300A at 1A/60s


Thursday, May 02, 2013, 09:10: TGHT reached voltage limit (12V) at ~780A yesterday at ~10pm. Increased limit to 12.5V and continued auto ramping. CTL block temp ~80C

Thursday, May 02, 2013, 10:08: TGHT voltage limit changed to 13V. TGHT:RDCUR goes to ~810A with TGHT:RDVOL at 12.5V. CTL block temp ~80C

Thursday, May 02, 2013, 11:33: TGHT manually stepped to 850A RDCUR at 846A, RDVOL at 13.1V. CTL block temp ~84C

Thursday, May 02, 2013, 15:13: Ramping down TGHT and TBHT to 580A and 280A at 2A/min and 1A/min


Friday, May 03, 2013, 08:30:  TGHT and TBHT at 580A and 280A. CTL block temp ~60C 

Friday, May 03, 2013, 08:37: Ramping down TGHT and TBHT to 0 at 2/min and 1A/min

Friday, May 03, 2013, 11:04: T/C logger removed


Monday, May 06, 2013, 09:37: Turbo stopped.

Monday, May 06, 2013, 10:26: Venting

Attachment 1: StripTool_2013-05-02.png
StripTool_2013-05-02.png
Attachment 2: CTL_ITD0431_Evap2.pdf
CTL_ITD0431_Evap2.pdf
Attachment 3: 2013-04-30_Evap2_ITD0431_CTL_Thermal_Test.pdf
2013-04-30_Evap2_ITD0431_CTL_Thermal_Test.pdf
  60   Wednesday, March 06, 2013, 10:41 Anders MjosEmpty38481-4HP-FEBIADDoneCTL thermal test

Wednesday, March 06, 2013

The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.

Thermocouple channels are as follows:

T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return

Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.

Test results attached.
 

Attachment 1: CTL_1st_Assebmly_Thermal_Test_Evap2.pdf
CTL_1st_Assebmly_Thermal_Test_Evap2.pdf
Attachment 2: 2013-03-08_Evap2_First_Thermal_Test.pdf
2013-03-08_Evap2_First_Thermal_Test.pdf
  61   Wednesday, March 06, 2013, 17:53 John WongEmpty38481-4HP-FEBIADDoneCTL thermal test

Anders Mjos wrote:

Wednesday, March 06, 2013

The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.

Thermocouple channels are as follows:

T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return

Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
 

 Wednesday, March 06, 2013, 17:23

The target has been pumping down to 5.3 e-7 Torr.  On the RGA mass scan, mainly H2O (mass 18 + constituents) was detected at ~2.7pA (see attachment #1).

The target will be heated up: TGHT = 850A (rate @ 1A/min); TBHT = 300A (rate @ 1A/min).


 Thursday, March 07, 2013, 11:51

TGHT and TBHT reached to 850A (local, 845A\13.80V) and 300A, respectively.  The out gassing of CO (mass 28) reached to ~5pA at the max currents.  (see attachment #2) 

 TBHT will be ramped down to 0A to compare the temperatures.  


 Thursday, March 07, 2013, 15:55

TBHT at 0A.  See attachment#3 for the temperatures and RGA data before further ramping down the TGHT.


 

Attachment 1: rampingup_1.PNG
rampingup_1.PNG
Attachment 2: rampingup_2.PNG
rampingup_2.PNG
Attachment 3: autorampingdown_23.PNG
autorampingdown_23.PNG
  62   Monday, March 11, 2013, 12:23 Anders MjosEmpty38481-4HP-FEBIADDoneCTL thermal test 2

 

Anders Mjos wrote:

Wednesday, March 06, 2013

The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.

Thermocouple channels are as follows:

T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return

Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
 

 

Monday, March 11, 2013

The CTL test target was installed again for a second thermal test. CTL block fastened to HS with 1 in lbs. A small piece of Ta-foil of 0.001" thickness was used between the CTL Cu-block and the Ta transfer line to reduce the heat transfer..

Thermocouples were re-attached to CTL and Heat Shield (see above for channels #s).

See attached graph (PDF) for details.

Attachment 1: 2013-03-11_Evap2_Second_Thermal_Test.pdf
2013-03-11_Evap2_Second_Thermal_Test.pdf
  63   Monday, March 11, 2013, 15:59 John WongEmpty38481-4HP-FEBIADDoneCTL thermal test 2

Anders Mjos wrote:

Anders Mjos wrote:

Wednesday, March 06, 2013

The Cool Transfer Line (CTL) test target is installed for thermal tests. Drawing number is ITD0431 REV A.

Thermocouple channels are as follows:

T1: Cu block on CTL
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return

Cooling water is in Evap2 supplied to the cooling line that goes directly to the area on the Heat Shield above the CTL.
 

Monday, March 11, 2013

The CTL test target was installed again for a second thermal test. CTL block fastened to HS with 1 in lbs. A small piece of Ta-foil of 0.001" thickness was used between the CTL Cu-block and the Ta transfer line to reduce the heat transfer..

Thermocouples were re-attached to CTL and Heat Shield (see above for channels #s).

 Monday, March 11, 2013, 15:55

Chamber was pumped down to 2 e-7 Torr.  HS water valve opened and no leaks were detected.  

TGHT and TBHT are ramping up to 850A and 300A at 2A/min, respectively.  

RGA is running... 


Tuesday, March 12, 2013, 10:44  

TGHT/TBHT reached to max currents. 

See attachment #1 for temperature and RGA measurements. 

Cooling down in process... 5A/min. 


 

Attachment 1: autorampingup_110.PNG
autorampingup_110.PNG
  64   Wednesday, March 13, 2013, 16:08 Anders MjosEmpty38481-4HP-FEBIADDoneThermal test

Wednesday, March 13, 2013 

Thermocouple channels (see attached PDF for photos)
T1 - Left target leg at tube
T2 - Between cooling fins close to tube, left side
T3 - Supply water HS
T4 - Return water HS


Friday, March 22, 2013

Test not conducted. Target removed.

Attachment 1: HP-FEBIAD-A_TC_at_fins.pdf
HP-FEBIAD-A_TC_at_fins.pdf
  65   Thursday, March 14, 2013, 12:27 Anders MjosEmpty38481-4HP-FEBIADDoneCTL thermal test 3 (w/o CTL block)

Thursday, March 12, 2013 

The CTL was removed and target heated to 580A / 300A

T1: Left target leg close to tube
T2: Heat Shield above CTL
T3: Heat Shield cooling water Supply
T4: Heat Shield cooling water Return


Thursday, March 13, 2013  

The target was cooled down 


Results attached as PDF and Excel

Attachment 1: 2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.pdf
2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.pdf
Attachment 2: 2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.xlsx
ELOG V2.9.2-2455