    Reply  Friday, June 12, 2015, 16:08, John Wong, Empty, 40860-1, LP-IG-LIS, In progress, Re-Sintering TaC coating container for UCx 
    Reply  Sunday, June 14, 2015, 09:40, John Wong, Empty, 40860-1, LP-IG-LIS, Done, Re-Sintering TaC coating container for UCx 2coats.png
Entry  Tuesday, February 23, 2021, 08:59, Marla Cervantes, , NA (Cu-tube), , Done, Re coating Test 2 
Entry  Thursday, February 11, 2021, 10:57, Marla Cervantes, , NA, , Done, Re coating Test 1 
Entry  Tuesday, March 23, 2021, 08:07, Aaron Schmidt, , , , , Re - Ta test. Leak check. 
Entry  Thursday, March 25, 2021, 07:57, Aaron Schmidt, , , , , Re - Ta test. Leak check. 
    Reply  Monday, September 12, 2016, 17:27, John Wong, Empty, 39530-9, HP-SIS, Done, RUSH. Round 2: Sinering TaC coating  Screen_Shot_2016-09-14_at_5.05.08_PM.pngScreen_Shot_2016-09-14_at_5.03.48_PM.png
Entry  Thursday, May 11, 2017, 11:25, Laura Lambert, Empty, 41369-10, HP-FEBIAD-CTL, Done, RUSH! Sintering TaC coated container for SiC#36 LS_during_TaC_sintering.jpgRS_during_TaC_sintering.jpg
Entry  Monday, June 22, 2015, 13:11, John Wong, Empty, 38817-6, HP-SIS, In progress, RUSH! Sintering TaC coated container for SiC  
    Reply  Tuesday, June 23, 2015, 10:18, Laura Lambert, Empty, 38817-6, HP-SIS, Done, RUSH! Sintering TaC coated container for SiC  
Entry  Tuesday, June 23, 2015, 12:26, John Wong, SiC, 38817-6, HP-SIS, In progress, RUSH! SiC backup target undergoes sintering process 
    Reply  Thursday, June 25, 2015, 16:13, Laura Lambert, SiC, 38817-6, HP-SIS, Done, RUSH! SiC backup target undergoes sintering process IMG_20150625_152233125.jpgIMG_20150625_152256456.jpg
Entry  Wednesday, August 05, 2020, 13:38, Aaron Schmidt, , , , , RP Swap on EVAP 2 
Entry  Tuesday, December 20, 2016, 15:04, Laura Lambert, , , , Maintenance, RETURN and SUPPLY valves CLOSED for xmas break 
Entry  Wednesday, January 14, 2015, 13:46, Anders Mjos, Empty, , , Maintenance, Pumping down for water leak test 
Entry  Monday, July 13, 2020, 11:03, Aaron Schmidt, , , , , Pump down / leak / vacuum check. 
Entry  Wednesday, August 12, 2020, 11:57, Marla Cervantes, Empty, 44489-9, TARGET BOAT, Done, Pristine Ta tube calibration 
Entry  Saturday, September 05, 2020, 21:33, Marla Cervantes, Empty, , , Done, Pristine Ta tube calibration 
Entry  Friday, February 26, 2021, 09:28, Ferran Boix Pamies, Empty, none, , Done, Parasitic target thermal tests 
Entry  Tuesday, March 30, 2021, 19:49, Ferran Boix Pamies, Empty, 44139-7-SK , , Done, Parasitic target thermal tests 20210403_174815.jpg20210403_183102.jpg