25
|
Tuesday, May 22, 2012, 15:26 |
John Wong | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target |
|
|
17
|
Tuesday, May 15, 2012, 12:26 |
John Wong | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target | Tuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on
Nov 03, 2010. The target consists of |
|
22
|
Friday, May 18, 2012, 12:19 |
Nikita Bernier | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target |
|
 |
23
|
Friday, May 18, 2012, 13:17 |
John Wong | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target |
|
|
24
|
Tuesday, May 22, 2012, 12:15 |
Nikita Bernier | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target |
|
 |
538
|
Tuesday, March 23, 2021, 11:28 |
Marla Cervantes | Empty | 44489-6 | | Done | Re-coating test 3 | Objective: Coating the inner surface of
a short tantalum boat with rhenium.
Result: |
|
540
|
Thursday, March 25, 2021, 11:24 |
Marla Cervantes | Empty | NA (Cu-Tube | | Done | Re-coat test 4 | Objective: Coating the inner surface of
a short tantalum tube with rhenium.
Result: |
|
547
|
Tuesday, April 13, 2021, 10:44 |
Marla Cervantes | Empty | NA (Ta- tube Eagle Alloys) | | Done | Re-coat 4 | Tuesday, April 13, 2021, 09:51
IGP1 = 2.5e-7 Torr
|
|
543
|
Sunday, March 28, 2021, 11:24 |
Marla Cervantes | | NA (Ta-tube) | | Done | Re-coat 3 | Objective: Coating the inner surface of
a tantalum tube to make a destructive test
and use a reference for the tantalum boats |
|
542
|
Friday, March 26, 2021, 16:23 |
Marla Cervantes | Empty | 44489-7 | | Done | Re-coat 2 | Objective: Coating the inner surface of
a tantalum tube to make a destructive test
and use a reference for the tantalum boats |
|
541
|
Friday, March 26, 2021, 13:58 |
Marla Cervantes | Empty | 44489-6 | | Done | Re-coat 1 | Friday, March 26, 2021, 13:55
Yesterday a heat shield was installed
in the EVAP2. |
|
217
|
Monday, June 15, 2015, 15:30 |
John Wong | Empty | 41177-2 | LP-SIS | Done | Re-Sintering TaC coating container for ZrC back-up |
|
|
215
|
Friday, June 12, 2015, 16:08 |
John Wong | Empty | 40860-1 | LP-IG-LIS | In progress | Re-Sintering TaC coating container for UCx |
|
|
216
|
Sunday, June 14, 2015, 09:40 |
John Wong | Empty | 40860-1 | LP-IG-LIS | Done | Re-Sintering TaC coating container for UCx |
|
|
530
|
Tuesday, February 23, 2021, 08:59 |
Marla Cervantes | | NA (Cu-tube) | | Done | Re coating Test 2 | Tuesday, February 23, 2021, 08:49
Yesterday a heat shield was washed
and when dry it was installed in the EVAP2, |
|
528
|
Thursday, February 11, 2021, 10:57 |
Marla Cervantes | | NA | | Done | Re coating Test 1 | Thursday, February 10, 2021, 12:00
Objective: Heat a Re wire to evaporate
it and deposit a layer of Re on the inner |
|
537
|
Tuesday, March 23, 2021, 08:07 |
Aaron Schmidt | | | | | Re - Ta test. Leak check. | Modified HS installed with new brackets
as per Marla.
Tuesday, March 23, 2021, 08:02: Vacuum |
|
539
|
Thursday, March 25, 2021, 07:57 |
Aaron Schmidt | | | | | Re - Ta test. Leak check. | Thursday, March 25, 2021, 07:55: Vacuum
@ 5.12e-07T. Waterlines opened. |
|
321
|
Monday, September 12, 2016, 17:27 |
John Wong | Empty | 39530-9 | HP-SIS | Done | RUSH. Round 2: Sinering TaC coating |
|
 |
368
|
Thursday, May 11, 2017, 11:25 |
Laura Lambert | Empty | 41369-10 | HP-FEBIAD-CTL | Done | RUSH! Sintering TaC coated container for SiC#36 | Thursday, May 11, 2017, 11:21
Turns out SiC HP-FEBIAD that has
finished conditioning is loaded in the wrong |
 |