Entry  Monday, March 10, 2014, 11:45, John Wong, , , , Maintenance, Replaced Backing Pump hose 
Monday, March 10, 2014, 11:44
Rick replaced the backing pump hose from 1.5" to 2.0" for better flow.  And the HEPA filter was checked - it looks OK. 

 
Entry  Friday, January 11, 2013, 11:16, John Wong, , , , Maintenance, Replace terminal insulator broke_insulator.PNG
Friday, January 11, 2013, 10:59
The insulator that holds the terminals was broken when a target container was installed.  The insulator had seen so much heat shine from the
Cu heat-shield gaps, see attachment.  Tightening the bolts on the target container might further put more force on the insulator and eventually broke
    Reply  Friday, January 11, 2013, 15:16, Anders Mjos, , , , Maintenance, Replace terminal insulator ITD0052C_revB.pdfinstalled_insulators.jpegta_heat_shields.jpeg


    
        
            John Wong wrote:
        
        
            
            Friday, January 11, 2013, 10:59
Entry  Tuesday, April 16, 2019, 13:40, Aaron Schmidt, , , , , Replace bottom insert on HS  
 Tuesday, April 16, 2019, 13:38: Replaced the bottom insert on the heat shield. 
Used small amount of isopropyl alcohol to wipe the inside if the HS out. 
Entry  Wednesday, May 29, 2024, 22:55, Darwin Ortiz Rosales, SiC, , LP TUBE, Done, Repeat of SiC experiment with mixed only casts 
Wednesday, May 29, 2024, 22:52
Small graphite cartridge was loaded with SiC discs 240523-1 and  240523-2 and 220727-2 (baseline discs).  Test Discs produced without milling
using PAA as a dispersant.
    Reply  Wednesday, September 09, 2015, 18:24, John Wong, SiC, 39530-5, HP-FEBIAD, In progress, Re-conditioning SiC#32 Screen_Shot_2015-09-09_at_5.53.15_PM.png


    
        
            John Wong wrote:
        
        
            
            
            
    Reply  Thursday, September 10, 2015, 09:58, Laura Lambert, SiC, 39530-5, HP-FEBIAD, In progress, Re-conditioning SiC#32 


    
        
            John Wong wrote:
        
        
            
            
            
    Reply  Thursday, September 10, 2015, 12:05, John Wong, SiC, 39530-5, HP-FEBIAD, Done, Re-conditioning SiC#32 Screen_Shot_2015-09-15_at_12.37.19_PM.pngScreen_Shot_2015-09-18_at_9.10.13_AM.pngScreen_Shot_2015-09-24_at_11.30.25_AM.png


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Tuesday, May 22, 2012, 15:26, John Wong, SiC, 38481-2, HP-SIS, Done, Re-condition the HP-SIS SiC target  


    
        
            Nikita Bernier wrote:
        
        
            
            
            
              
Entry  Tuesday, May 15, 2012, 12:26, John Wong, SiC, 38481-2, HP-SIS, Done, Re-condition the HP-SIS SiC target 
Tuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on Nov 03, 2010.  The target consists of 405 discs, 18.5cm in length.  It was sintered in the Evaporator#1. 
This target is going into Evap#2 for re-conditioning.  It is currently being pumped down. 
    Reply  Friday, May 18, 2012, 12:19, Nikita Bernier, SiC, 38481-2, HP-SIS, Done, Re-condition the HP-SIS SiC target autoramp1.pngievap2autoheat1.png


    
        
            John Wong wrote:
        
        
            
            Tuesday, May 15, 2012, 12:24
    Reply  Friday, May 18, 2012, 13:17, John Wong, SiC, 38481-2, HP-SIS, Done, Re-condition the HP-SIS SiC target 


    
        
            Nikita Bernier wrote:
        
        
            
            
            
              
    Reply  Tuesday, May 22, 2012, 12:15, Nikita Bernier, SiC, 38481-2, HP-SIS, Done, Re-condition the HP-SIS SiC target TGHT-VAC1.JPGTBHT-VAC1.JPG


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Tuesday, March 23, 2021, 11:28, Marla Cervantes, Empty, 44489-6, , Done, Re-coating test 3 
Objective: Coating the inner surface of a short tantalum boat with rhenium.
Result:

    The wire snnaped around 376 W (53 A, and 7.09 V) and 2170 °C (measured with filament pyrometer)
    The tube does not
Entry  Thursday, March 25, 2021, 11:24, Marla Cervantes, Empty, NA (Cu-Tube, , Done, Re-coat test 4 
Objective: Coating the inner surface of a short tantalum tube with rhenium.
Result:

    The wire snnaped around 376 W (53 A, and 7.09 V) and 2170 °C (measured with filament pyrometer)
    The tube is coated

Entry  Tuesday, April 13, 2021, 10:44, Marla Cervantes, Empty, NA (Ta- tube Eagle Alloys), , Done, Re-coat 4 voltage-increment-Re-coating.JPG
 Tuesday, April 13, 2021, 09:51
IGP1 = 2.5e-7 Torr

Tuesday, April 13, 2021, 10:17 
Entry  Sunday, March 28, 2021, 11:24, Marla Cervantes, , NA (Ta-tube), , Done, Re-coat 3 
Objective: Coating the inner surface of a tantalum tube to make a destructive test and use a reference for the tantalum boats coatings
Results: The tube was coated

Sunday, March 28, 2021, 11:23
Entry  Friday, March 26, 2021, 16:23, Marla Cervantes, Empty, 44489-7, , Done, Re-coat 2 
Objective: Coating the inner surface of a tantalum tube to make a destructive test and use a reference for the tantalum boats coatings
Results: 

Sunday, March 27, 2021, 11:23
Entry  Friday, March 26, 2021, 13:58, Marla Cervantes, Empty, 44489-6, , Done, Re-coat 1 
Friday, March 26, 2021, 13:55
Yesterday a heat shield was installed in the EVAP2.
A 1mm thick rhenium wire was held within two copper brackets to pass    through a Cu tube with the intention of coating its inside face.
    Reply  Monday, June 15, 2015, 15:30, John Wong, Empty, 41177-2, LP-SIS, Done, Re-Sintering TaC coating container for ZrC back-up 


    
        
            Laura Lambert wrote:
        
        
            
            
            
              