    Reply  Friday, June 10, 2016, 16:30, John Wong, SiC, 41369-4, HP-SIS, In progress, Sintering SiC#33 - 1st beta-SiC target! 
 

    
        
            Laura
    Reply  Wednesday, June 15, 2016, 17:58, John Wong, SiC, 41369-4, HP-SIS, In progress, Sintering SiC#33 - 1st beta-SiC target! 


    
        
            Laura Lambert wrote:
        
        
            
            
            
              
    Reply  Tuesday, August 23, 2016, 12:15, John Wong, Empty, 39814-V2-1, LP-IG-LIS, Done, sintering TaC coating on SiC#34 container...round2 


    
        
            Laura Lambert wrote:
        
        
            
             Wednesday, August 17, 2016, 17:30
Entry  Wednesday, August 24, 2016, 17:07, John Wong, SiC, 39814-V2-1, LP-IG-LIS, Done, Sintering process for SiC#34 (2nd round)  10x
Wednesday, August 24, 2016, 17:05
Target container was previously coated with TaC and sintered up to 1900C at 420A/7.01V
Container is loaded with beta-SiC 432 discs at 16cm in length. 
    Reply  Tuesday, August 30, 2016, 15:25, John Wong, SiC, 40860-3, LP-IG-LIS, Problems, Conditioning SiC#34. Note about the p/s voltage Capture.PNG


    
        
            Laura Lambert wrote:
        
        
            
             Monday, August 08, 2016, 15:19
Entry  Wednesday, September 07, 2016, 15:02, John Wong, Empty, 39530-9, HP-SIS, In progress, Sintering TaC coating container for SiC Target  coating_chipped_off.JPGautoTaC_sintering_20.JPEGcoating_chipped_off_2.JPG
 Wednesday, September 07, 2016, 14:45
Container was previously coated with TaC solution and wrapped with 1-full length layer of Ta- heat shield around the fins.  
Chamber is being pumped down.  Vac at 5.6e-7 Torr before HS water valves were open; no leaks were detected. 
    Reply  Monday, September 12, 2016, 17:22, John Wong, Empty, 39530-9, HP-SIS, Failed, TaC coating chipped off Screen_Shot_2016-09-12_at_4.52.53_PM.png


    
        
            John Wong wrote:
        
        
            
             Wednesday, September 07, 2016, 14:45
    Reply  Monday, September 12, 2016, 17:27, John Wong, Empty, 39530-9, HP-SIS, Done, RUSH. Round 2: Sinering TaC coating  Screen_Shot_2016-09-14_at_5.05.08_PM.pngScreen_Shot_2016-09-14_at_5.03.48_PM.png


    
        
            John Wong wrote:
        
        
            
            
            
    Reply  Monday, September 19, 2016, 18:48, John Wong, SiC, 39530-9, HP-FEBIAD, In progress, Sintering SiC#35 - Change OMEGA/MiKRON slopes 


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, September 15, 2016, 16:23
    Reply  Thursday, September 22, 2016, 12:14, John Wong, SiC, 39530-9, HP-FEBIAD, In progress, Sintering SiC#35 


    
        
            Laura Lambert wrote:
        
        
            
            
            
    Reply  Wednesday, October 12, 2016, 21:18, John Wong, Ta, 41790-5, LP-SIS, In progress, Conditioning Ta#50 


    
        
            Laura Lambert wrote:
        
        
            
            Friday, October 07, 2016, 16:40
Entry  Monday, October 24, 2016, 17:52, John Wong, np-SiC, , TARGET BOAT, Done, Thermo test of np-SiC raw powder  Capture.JPG450A_1500C.JPG
Monday, October 24, 2016, 17:43
Two samples were prepared and loaded into the target boat with 1 layer of heat-shied as shown in the attachment#1.
Ingredients used: np-SiC and very small about of 5% PVA to hold the powder together. 
Entry  Tuesday, November 15, 2016, 16:51, John Wong, np-SiC, , TARGET BOAT, In progress, Heat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1 
Tuesday, November 15, 2016, 16:48
Three samples were prepared  (see my logbook#1 page 3, preparing for carbonization).
One layer of Ta foil was used to wrap around the target boat. 
    Reply  Friday, November 18, 2016, 17:28, John Wong, np-SiC, , TARGET BOAT, Done, Heat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1 


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Thursday, February 09, 2017, 23:28, John Wong, np-SiC, , TARGET BOAT, Done, Thermotest: SiC-SiO2-Lys and SiC pellets striptool_01.JPG
Thursday, February 09, 2017, 23:26
There are two types of samples being test for thermal stability:
1.  SiC-SiO2-Lys nanofiber mats
Entry  Saturday, March 11, 2017, 11:58, John Wong, np-SiC, , TARGET BOAT, Done, Thermo test B3 Pellets heating_curve_900PSI_pellet.JPG
Friday, March 10, 2017, 17:29
Three B3 pellets are loaded into the container for thermo test. 
(see lab book1 Pg 26, 28-30 for more detail about the materials)
Entry  Friday, March 31, 2017, 12:22, John Wong, np-SiC, , TARGET BOAT, In progress, Thermo test: B3 Pellets (13.3K-PSI)  heating_curve_00.JPGheating_curve_13PSI_pellets_01.JPG
Friday, March 31, 2017, 12:21
Two compressed pellets loaded into the target boat and wrapped with Ta foil.  (see lab book p32 for details).
Chamber is pumping down.
Entry  Thursday, April 20, 2017, 12:45, John Wong, np-SiC, , TARGET BOAT, In progress, Higher Temp Treament: B3-92Mpa pellets  B3_PAN_pellets_1800c.JPG
Thursday, April 20, 2017, 12:38
3 samples are loaded into the Ta boat and wrapped with heat shield (1 long piece, 3 rounds):  2x of B3-92Mpa pellets and 10% pure PAN pellet
as control.  See lab book page 32 for more details.
Entry  Monday, July 10, 2017, 17:36, John Wong, np-SiC, , TARGET BOAT, Problems, Water Sensor Problem, TGHT Tripped. (np-SiC fibrous Pellet: Applied pressure vs Density) Graph3a.JPG
Monday, July 10, 2017, 17:28
Two np-SiC fibrous pellets with different applied pressure:
1) 200MPa, 2)  335 MPa (see logbook pg 36 for more details). 
Entry  Monday, August 21, 2017, 17:32, John Wong, SiC, , TARGET BOAT, Done, Carbonization of sol-gel SiO2+CNT 
Monday, August 21, 2017, 17:09
Two pellets of sol-gel SiO2+CNT were produced.  See lab book pg 44-46 for details. 
Samples were loaded in Ta boat, wrapped with heat shield (1 layer)