Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 19 of 35  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
    Reply  Monday, January 27, 2014, 10:59, Laura Lambert, Empty, 40282-4, TARGET BOAT, In progress, Sintering Ta target boat with TaC coating 

Laura Lambert wrote:

Laura Lambert wrote:

John Wong wrote:

John Wong wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Monday, January 20, 2014, 16:32

A new target boat was sprayed with TaC coating and let dry this morning.

The target boat is NOT wrapped with Ta-heat shield.

The boat was installed in Evap#2, chamber is currently being pumped down overnight.


 

 Tuesday, January 21, 2014, 11:10

Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 

 Tuesday, January 21, 2014, 11:51

Vacuum was grumpy and was well on it's way to tripping off [reached 5e-5 Torr], auto ramping was stopped at ~95A and quickly stepped down to 90A to avoid tripping it off.

Allowed vacuum to settle back down to 2.3e-6 Torr. Auto ramping changed to 0.2A/min and re-started.

 close-call!


 

 Wednesday, January 22, 2014, 09:46

TGHT has been slowly ramping up overnight at a rate of 0.2A/min.

IGP1 = 2.9e-7 Torr, TGHT = 342A; stepping ramping rate up to 2.0A/min.


 

 Wednesday, January 22, 2014, 13:43

TGHT is sitting at 693A, IGP1 = 1.3e-6 Torr.

Stepping up TGHT voltage up to 14V from 13.05V to reach the max current of 700A.


 

 Wednesday, January 22, 2014, 15:09

TGHT reached to 700A/12.83V.  Local temperature on the boat surface was measured at ~1500C.

Target will be heated for a few hours and will be cooled down later tonight.

The chamber will be vented tomorrow and the boat will be inspected.


 

 Wednesday, January 22, 2014, 18:09

After the boat was heated for ~4hrs, TGHT tripped off on IEVAP2:TBHT2 (see attachment #1, #2). 

Tried clearing the water interlock via EPICS - failed to clear.  Checked the local water valves - ALL VALVES are OPEN 

Tried closing and re-opening the IEVAP2:TBHT2 valves, interlock cleared after a few minutes. 

Maybe a fault in the water signal.  If it happens again, the water signal should be replaced.

Turned back on the power supply - TGHT current/voltage are holding.  Target boat may be OK!

Chamber is a bit warm now.  Will allow time to cool down.

Will vent the chamber tomorrow and the boat will be inspected. 


 

 Thursday, January 23, 2014, 16:18

Chamber vented overnight and was opened up this morning.

Target boat not fully sintered [see attached photos].

Chamber currently being pumped down again in order to continue with sintering TaC coating.

HS cooling water valves were opened, no leaks detected.

Will ramp up to 700A again over the weekend.

 Friday, January 24, 2014, 14:21

Chamber was pumped down to 1.7e-7 Torr.

TGHT was stepped up to 35A, voltage max set at 14V. TBHT currently sitting at 0A.

Waited 20min, vacuum consistently stable. Auto-ramp initiated at 2.0 A/min and max setpoint to 700A.


 

 Monday, January 27, 2014, 10:05

TGHT reached 700A over the weekend. Measured temp @ 2000C.

TGHT auto-cool inititated at 2.0A/min.


 

    Reply  Tuesday, January 28, 2014, 11:57, Laura Lambert, Empty, 40282-4, TARGET BOAT, In progress, Sintering Ta target boat with TaC coating IMG_20140128_111526059.jpgIMG_20140128_111456815.jpg

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

John Wong wrote:

John Wong wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Monday, January 20, 2014, 16:32

A new target boat was sprayed with TaC coating and let dry this morning.

The target boat is NOT wrapped with Ta-heat shield.

The boat was installed in Evap#2, chamber is currently being pumped down overnight.


 

 Tuesday, January 21, 2014, 11:10

Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 

 Tuesday, January 21, 2014, 11:51

Vacuum was grumpy and was well on it's way to tripping off [reached 5e-5 Torr], auto ramping was stopped at ~95A and quickly stepped down to 90A to avoid tripping it off.

Allowed vacuum to settle back down to 2.3e-6 Torr. Auto ramping changed to 0.2A/min and re-started.

 close-call!


 

 Wednesday, January 22, 2014, 09:46

TGHT has been slowly ramping up overnight at a rate of 0.2A/min.

IGP1 = 2.9e-7 Torr, TGHT = 342A; stepping ramping rate up to 2.0A/min.


 

 Wednesday, January 22, 2014, 13:43

TGHT is sitting at 693A, IGP1 = 1.3e-6 Torr.

Stepping up TGHT voltage up to 14V from 13.05V to reach the max current of 700A.


 

 Wednesday, January 22, 2014, 15:09

TGHT reached to 700A/12.83V.  Local temperature on the boat surface was measured at ~1500C.

Target will be heated for a few hours and will be cooled down later tonight.

The chamber will be vented tomorrow and the boat will be inspected.


 

 Wednesday, January 22, 2014, 18:09

After the boat was heated for ~4hrs, TGHT tripped off on IEVAP2:TBHT2 (see attachment #1, #2). 

Tried clearing the water interlock via EPICS - failed to clear.  Checked the local water valves - ALL VALVES are OPEN 

Tried closing and re-opening the IEVAP2:TBHT2 valves, interlock cleared after a few minutes. 

Maybe a fault in the water signal.  If it happens again, the water signal should be replaced.

Turned back on the power supply - TGHT current/voltage are holding.  Target boat may be OK!

Chamber is a bit warm now.  Will allow time to cool down.

Will vent the chamber tomorrow and the boat will be inspected. 


 

 Thursday, January 23, 2014, 16:18

Chamber vented overnight and was opened up this morning.

Target boat not fully sintered [see attached photos].

Chamber currently being pumped down again in order to continue with sintering TaC coating.

HS cooling water valves were opened, no leaks detected.

Will ramp up to 700A again over the weekend.

 Friday, January 24, 2014, 14:21

Chamber was pumped down to 1.7e-7 Torr.

TGHT was stepped up to 35A, voltage max set at 14V. TBHT currently sitting at 0A.

Waited 20min, vacuum consistently stable. Auto-ramp initiated at 2.0 A/min and max setpoint to 700A.


 

 Monday, January 27, 2014, 10:05

TGHT reached 700A over the weekend. Measured temp @ 2000C.

TGHT auto-cool inititated at 2.0A/min.


 

 Tuesday, January 28, 2014, 11:53

Chamber cooled down overnight, vented and opened up this morning.

Target boat still has a strip of green, still not fully sintered! [see attached photos].

Chamber currently being pumped down again to attempt sintering - round 3.


 

    Reply  Tuesday, January 28, 2014, 13:09, Laura Lambert, Empty, 40282-4, TARGET BOAT, Done, Sintering Ta target boat with TaC coating 

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

John Wong wrote:

John Wong wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Monday, January 20, 2014, 16:32

A new target boat was sprayed with TaC coating and let dry this morning.

The target boat is NOT wrapped with Ta-heat shield.

The boat was installed in Evap#2, chamber is currently being pumped down overnight.


 

 Tuesday, January 21, 2014, 11:10

Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 

 Tuesday, January 21, 2014, 11:51

Vacuum was grumpy and was well on it's way to tripping off [reached 5e-5 Torr], auto ramping was stopped at ~95A and quickly stepped down to 90A to avoid tripping it off.

Allowed vacuum to settle back down to 2.3e-6 Torr. Auto ramping changed to 0.2A/min and re-started.

 close-call!


 

 Wednesday, January 22, 2014, 09:46

TGHT has been slowly ramping up overnight at a rate of 0.2A/min.

IGP1 = 2.9e-7 Torr, TGHT = 342A; stepping ramping rate up to 2.0A/min.


 

 Wednesday, January 22, 2014, 13:43

TGHT is sitting at 693A, IGP1 = 1.3e-6 Torr.

Stepping up TGHT voltage up to 14V from 13.05V to reach the max current of 700A.


 

 Wednesday, January 22, 2014, 15:09

TGHT reached to 700A/12.83V.  Local temperature on the boat surface was measured at ~1500C.

Target will be heated for a few hours and will be cooled down later tonight.

The chamber will be vented tomorrow and the boat will be inspected.


 

 Wednesday, January 22, 2014, 18:09

After the boat was heated for ~4hrs, TGHT tripped off on IEVAP2:TBHT2 (see attachment #1, #2). 

Tried clearing the water interlock via EPICS - failed to clear.  Checked the local water valves - ALL VALVES are OPEN 

Tried closing and re-opening the IEVAP2:TBHT2 valves, interlock cleared after a few minutes. 

Maybe a fault in the water signal.  If it happens again, the water signal should be replaced.

Turned back on the power supply - TGHT current/voltage are holding.  Target boat may be OK!

Chamber is a bit warm now.  Will allow time to cool down.

Will vent the chamber tomorrow and the boat will be inspected. 


 

 Thursday, January 23, 2014, 16:18

Chamber vented overnight and was opened up this morning.

Target boat not fully sintered [see attached photos].

Chamber currently being pumped down again in order to continue with sintering TaC coating.

HS cooling water valves were opened, no leaks detected.

Will ramp up to 700A again over the weekend.

 Friday, January 24, 2014, 14:21

Chamber was pumped down to 1.7e-7 Torr.

TGHT was stepped up to 35A, voltage max set at 14V. TBHT currently sitting at 0A.

Waited 20min, vacuum consistently stable. Auto-ramp initiated at 2.0 A/min and max setpoint to 700A.


 

 Monday, January 27, 2014, 10:05

TGHT reached 700A over the weekend. Measured temp @ 2000C.

TGHT auto-cool inititated at 2.0A/min.


 

 Tuesday, January 28, 2014, 11:53

Chamber cooled down overnight, vented and opened up this morning.

Target boat still has a strip of green, still not fully sintered! [see attached photos].

Chamber currently being pumped down again to attempt sintering - round 3.


 

 Tuesday, January 28, 2014, 13:06

Discussed with Peter. Instead of re-sintering the whole boat by itself, end caps will be inserted for sintering and will be placed further down the boat where the sintering process appears complete.


 

Entry  Friday, January 31, 2014, 12:10, Laura Lambert, Empty, 39165-10, LP-SIS, Done, Sintering TaC coating container for Ta? 

 Friday, January 31, 2014, 11:28

Target container is coated with TaC.

The container is wrapped with 3 x Ta heat-shield.

Chamber was pumped down to 1.9e-7 Torr.

HS water valves were opened, no leak detected.

TGHT and TBHT were stepped up to 35A. Waited ~20min, current stabilized and vacuum starting to drop.

TGHT will be ramped up to 580A at 0.2A/min, max voltage = 11.05V.

TBHT will be ramped up to 230A at 0.2A/min, max volatge = 5V.

Initiating auto-ramping: Good Vac = 3.0e-5 Torr, Bad Vac = 4.0e-5 Torr.


 Monday, February 03, 2014, 10:21

TGHT reached 580A pver the weekend.

TBHT sitting at 1.4A, checked archive: never went over 1.6A. Aborted auto-ramp, re-starting auto ramp process for TBHT.

IGP1 = 1.6e-7 Torr.


 Monday, February 03, 2014, 15:23

TBHT running smoothly, must have been and electrical problem.

TBHT currently at 85A, vacuum has not changed, increasing TBHT auto-ramp to 2.0A/min


 Tuesday, February 04, 2014, 10:10

TBHT reached 230A yesterday pm. Measured temp this morning at 1800C.

Initiated TGHT/TBHT auto-cooling at 2.0A/min.


 Wednesday, February 05, 2014, 11:33

Chamber cooled down overnight, vented and opened up this morning.

Smooth run! Container fully sintered.

Entry  Tuesday, February 11, 2014, 13:49, Laura Lambert, Empty, 38817-8, HP-SIS, Done, Sintering TaC coating container for TiC 

 Tuesday, February 11, 2014, 13:43

Target container is coated with TaC and wrapped with 3-Ta heat shields.

TGHT and TBHT will be ramped up to 820A and 300A, respectively.

Ramping rate set to 0.2A/min.

Good vac = 3e-5 Torr, Bad vac = 4e-5 Torr.

Chamber currently being pumped down...


 Tuesday, February 11, 2014, 16:33

Chamber pumped down to 2e-6 Torr.

HS cooling water valves opened; no leaks detected.

Will step up in the a.m.


 Wednesday, February 12, 2014, 11:41

IGP1 = 1.5e-7 Torr

TGHT max voltage = 17.05V, TBHT max voltage = 5V

Stepped TGHT and TBHT up to 35A

Waited 1hr15 before vacuum stabilized/ started to drop.

Initiating auto-ramping.


 Thursday, February 13, 2014, 10:19

TBHT and TGHT have both reached 300A

IGP1 = 2.4e-7 Torr.

Increasing TGHT auto-ramp to 2.0A/min


 Friday, February 14, 2014, 08:58

TGHT reached 820A yesterday afternoon. Measured internal temp this morning at 1300C.

Initiated TGHT auto-cooling at 2.0A/min and TBHT at 1.0A/min.

IGP1 = 3.2e-7 Torr.


 Monday, February 17, 2014, 12:02

Cooled down friday. Vented this morning.

Container fully sintered, smooth run!


 

Entry  Tuesday, February 18, 2014, 12:19, Laura Lambert, Empty, 40282-3, TARGET BOAT, Done, Sintering Ta target boat with TaC coating Photo_2-17-2014_3_54_11_PM.jpgIMG_20140221_102415969.jpgIMG_20140221_102337054.jpg

 Tuesday, February 18, 2014, 12:12

A new target boat was sprayed with TaC coating and let dry.
The target boat is NOT wrapped with Ta-heat shield.

Thermocouples have been attached to the target boat in order to monitor the internal temperature of the new target boat design. 

The boat was installed in Evap#2, chamber is currently being pumped down.


 Tuesday, February 18, 2014, 14:20

Chamber was pumped down this morning to 2.9e-6 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 14V. TBHT currently at 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 0.2A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr; Bad vacuum: 4.00e-5 Torr.

Temperature reading on left: thermocouple touching edge of target boat; temperature reading on right: thermocouple floating in center of target boat.


 Wednesday, February 19, 2014, 09:11

TGHT has been slowly ramping up overnight at a rate of 0.2A/min

IGP1 = 3.9e-7 Torr, TGHT = 260A; stepping ramping rate up to 2.0A/min


 Wednesday, February 19, 2014, 15:25

IGP1 = 9.4e-7 Torr

Thermocouple T2 = 1267.8C

Internal temp measured with Mikron = 1600C

Increasing max setpoint to 720A due to previous not fully sintered new design of target boat.


 Thursday, February 20, 2014, 09:17

Thermocouple T2 = 1254.5C

Internal temp measured with Mikron = 1811C

IGP1 = 2.6e-7 Torr

Reached max setpoint yesterday evening.

Initiating auto-cooling at 2.0A/min.


 Friday, February 21, 2014, 10:47

Vented and opened chamber this morning.

Target boat not fully sintered. [see attached photos]

Close to a full sinter, and will re-sinter next week with endcaps, so will not re-sinter by itself.


 

Entry  Tuesday, June 17, 2014, 13:20, Laura Lambert, Empty, 39530-8, HP-FEBIAD, Done, Sintering TaC coating container for SiC#30 part 2 

 Tuesday, June 17, 2014, 13:11

Target container is coated with TaC.

Container is wrapped with 3x Ta-heat shields.

Currently being pumped down.

For sintering process:

TGHT and TBHT will be ramped up to 820A and 300A respectively at 0.1A/min


 Tuesday, June 17, 2014, 14:22

HS water cooling valves opened, no leaks detected.

IGP1 @1.8e-6 Torr

TGHT max = 820A/ 17V

TBHT max = 300A/ 5V

Stepped up manually to 40A, waited ~20min, vacuum stable.

Initiating auto-ramp @ 1.0A/min


 Wednesday, June 18, 2014, 11:24

TGHT and TBHT reached their respective 820A and 300A last night.

Internal temp measured from side of EVAP2 with mikron = 1830C

IGP1 = 7.6e-7 Torr

Initiating auto-cool down process at 2.0A/min and 1.0A/min for TGHT and TBHT respectively


vented and opened this morning.

smooth run

 

Entry  Wednesday, July 23, 2014, 15:07, John Wong, Empty, 40282-3, LP-SIS, In progress, Sintering TaC coated target container  

Wednesday, July 23, 2014, 15:07

Target container is coated with TaC.  No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min.

TBHT will be ramped up to 230A at 0.2A/min.

Chamber is currently being pumped down


 Wednesday, July 23, 2014, 17:40

Vacuum came down to mid 10-6 Torr.

Stepped up TGHT and TBHT to 30A - IG1 @ 1.4e-5 Torr.

Initiated auto-ramping.


 Thursday, July 24, 2014, 17:19

TGHT and TBHT have reached to 100A, and vacuum is coming down to 1.4e-6 Torr.

Increase ramping rate, TGHT to 1A/min, TBHT 0.5A/min.


 Friday, July 25, 2014, 11:26

Target container temperature reaches ~1550C at 580A on TGHT and 230A TBHT, and it has been heated for ~10 hrs.

Auto-cooling initiated at 2A/min.


 

    Reply  Monday, July 28, 2014, 10:52, Laura Lambert, Empty, 40282-3, LP-SIS, Done, Sintering TaC coated target container  

John Wong wrote:

Wednesday, July 23, 2014, 15:07

Target container is coated with TaC.  No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min.

TBHT will be ramped up to 230A at 0.2A/min.

Chamber is currently being pumped down


 Wednesday, July 23, 2014, 17:40

Vacuum came down to mid 10-6 Torr.

Stepped up TGHT and TBHT to 30A - IG1 @ 1.4e-5 Torr.

Initiated auto-ramping.


 Thursday, July 24, 2014, 17:19

TGHT and TBHT have reached to 100A, and vacuum is coming down to 1.4e-6 Torr.

Increase ramping rate, TGHT to 1A/min, TBHT 0.5A/min.


 Friday, July 25, 2014, 11:26

Target container temperature reaches ~1550C at 580A on TGHT and 230A TBHT, and it has been heated for ~10 hrs.

Auto-cooling initiated at 2A/min.


 

 Monday, July 28, 2014, 10:50

vented in air and opened this morning. successful run


 

Entry  Tuesday, August 05, 2014, 13:13, Laura Lambert, Empty, , TARGET BOAT, In progress, Sintering TaC coated end caps aug5-2014.jpg

 Tuesday, August 05, 2014, 12:02

The target container end caps were coated with TaC spray and let dry.

The caps are inserted in the target boat vertically, wrapped in graphite foil with 3 x Ta-heat shield. [see attached photo]

The chamber is currently being pumped down.


 

Entry  Tuesday, September 23, 2014, 15:02, Laura Lambert, Empty, 40282-5, TARGET BOAT, In progress, Sintering Ta target boat with TaC coating 

 Tuesday, September 23, 2014, 15:00

A new target boat [new design with no end caps] was sprayed with TaC coating and let dry.

The target boat is wrapped with 3-layers of Ta-heat shield.

The boat was installed in EVAP2, chamber is currently being pumped down.


 

    Reply  Tuesday, September 23, 2014, 18:32, John Wong, Empty, 40282-5, TARGET BOAT, Done, Sintering Ta target boat with TaC coating (with Temp measurement) 

Laura Lambert wrote:

 Tuesday, September 23, 2014, 15:00

A new target boat [new design with no end caps] was sprayed with TaC coating and let dry.

The target boat is wrapped with 3-layers of Ta-heat shield.

The boat was installed in EVAP2, chamber is currently being pumped down.


 

 Tuesday, September 23, 2014, 18:31

Chamber was pumped down to 2.5e-6 Torr. 

HS water valve open; no leaks detected.

Stepping up TGHT to 40A - pressure is increasing...


 Tuesday, September 23, 2014, 19:05

Auto-ramping TGHT to 580A at 0.5A/min.  Temperature will be measured and TGHt will be adjusted accordingly.


 Wednesday, September 24, 2014, 11:57

Pressure is stable at 2.2-6 Torr as TGHT is ramping up.  Increase ramping rate to 2.0A/min.  Currently TGHT at 540A.


 Wednesday, September 24, 2014, 15:36

TGHT at 580A for 2 hrs.  Inner tube temp (left side wall, viewing from the window port) ~1800C (measured with Mikron = 1550C +250C em. correction); Vac @ 1.67e-6 Torr.

Temperature measurement distance from the window to Mikron = 45cm.

Increase TGHT to reach 2000C (Mikron @ 1750C)


 Wednesday, September 24, 2014, 18:14

TGHT has gone up to 725A/13.2V.  Temp measured at 1740C (+250C = ~2000C).  Pressure gone up to 5.5e-6 Torr and it's coming down slowly.

Will continue heating at this temperature for a few hours; then cool down afterward.


 Wednesday, September 24, 2014, 18:56

Temperature is pretty stable at 1740C on Mikron, and pressure is still coming down, currently at 2.9e-6 Torr.

Slow ramping down TGHT at 1.0A/min.  The chamber should be ready for venting tomorrow. 

Target boat will be inspected.


 Thursday, September 25, 2014, 17:25.

The boat was inspected and it turned out great!  The coating was fully sintered and there is no sign of damage on the boat. 

See the link for photos.

https://www.dropbox.com/sh/m7ycqhkj4avfull/AABHVTweTsP4ajeWZ6uoY010a?dl=0


 

Entry  Thursday, October 02, 2014, 11:26, John Wong, Empty, , , Maintenance, Broken insulators  

 Thursday, October 02, 2014, 11:22

It was found that after the last process, Evap#2 has broken insulators - the cylinder insulator that supports the target centre legs and the block insulator that supports the terminals.  

Informed Anders/Rick.


 

Entry  Thursday, October 02, 2014, 11:52, Laura Lambert, Empty, 40282-5, LP-SIS, In progress, Sintering TaC coating container for UCx#11 

 Thursday, October 02, 2014, 11:51

Target container sprayed with TaC, currently drying in fume hood


 Monday, October 06, 2014, 12:11

Target container & back block is wrapped with 3 layers of Ta-heat shield.  The chamber has been pumped down over the weekend. 

Pressure currently at 2.23e-7 Torr. 

HS water valves open; no leaks detected.

TGHT will be ramped up to 580A at 0.2A/min

TBHT will be ramped up to 230A at 0.2A/min.


 

    Reply  Friday, October 03, 2014, 13:02, Anders Mjos, Empty, , , Maintenance, Broken insulators  NewInsulators.jpgBrokenInsulators.jpg

John Wong wrote:

 Thursday, October 02, 2014, 11:22

It was found that after the last process, Evap#2 has broken insulators - the cylinder insulator that supports the target centre legs and the block insulator that supports the terminals.  

Informed Anders/Rick.


 

 Friday, October 03, 2014

  • Insulators replaced. Torque 55 in lbs on all fasteners.
  • Cleaned TGHT terminals with scotch-brite and methanol.
  •  New (clean) heat shield prepared WO-39230-2.
  • Re-installed right side heat shield alignment pin (previously removed to allow line of sight to the target).
    Reply  Monday, October 06, 2014, 12:17, John Wong, Empty, 40282-5, LP-SIS, In progress, Sintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR) 

Laura Lambert wrote:

 Thursday, October 02, 2014, 11:51

Target container sprayed with TaC, currently drying in fume hood


 Monday, October 06, 2014, 12:11

Target container & back block is wrapped with 3 layers of Ta-heat shield.  The chamber has been pumped down over the weekend. 

Pressure currently at 2.23e-7 Torr. 

HS water valves open; no leaks detected.

TGHT will be ramped up to 580A at 0.2A/min

TBHT will be ramped up to 230A at 0.2A/min.


 

 Monday, October 06, 2014, 12:16

Stepped up both TGHT/TBHT to 35A. 


Tuesday, October 07, 2014, 12:54

TBHT reached to 230A/3.7V and TGHT is still ramping up, currently at 303A/4.5V. Temp measured with Omega-IR2 = 1165C with e'=0.85

Pressure @ 5.2e-7 Torr. 

Increase ramping rate to 2A/min.


 Tuesday, October 07, 2014, 16:21

TGHT is now at 580A and TGHT at 230A.

Temperature is measured with OMEGA-IR2, MIKRON, and analog pyrometer - All the measurements are agreed at 1700C (without the tantalum emissivity correction of 250C)

The OMEGA-IR2 slope has changed to 0.97 for the correction - The real temperature reading from the display is showing 1935C.

Now... attempting to low TBHT to see any temperature change.


 Tuesday, October 07, 2014, 17:01

TGHT @ 580A.

TBHT = 180C, Temp = 1925C

TBHT = 130C, Temp = 1920C

Not much of change in the temperature on the target tube...


Tuesday, October 07, 2014, 17:07

Attempting to increase the temperature to 2000C

TGHT = 600A, Temp = 1955C

TGHT = 620A, Temp = 2000C

Target will continue heating at this temperature overnight... Will continue to monitor.


 Tuesday, October 07, 2014, 20:59

After almost 4 hours of heating at 620A on TGHT, the temperature has dropped to 1980C.  

Pressure is coming down to 1.17e-6 Torr.  

Increased TGHT to 630A to maintain temp @ 2000C


 

    Reply  Wednesday, October 08, 2014, 11:51, Laura Lambert, Empty, 40282-5, LP-SIS, Done, Sintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR) 

John Wong wrote:

Laura Lambert wrote:

 Thursday, October 02, 2014, 11:51

Target container sprayed with TaC, currently drying in fume hood


 Monday, October 06, 2014, 12:11

Target container & back block is wrapped with 3 layers of Ta-heat shield.  The chamber has been pumped down over the weekend. 

Pressure currently at 2.23e-7 Torr. 

HS water valves open; no leaks detected.

TGHT will be ramped up to 580A at 0.2A/min

TBHT will be ramped up to 230A at 0.2A/min.


 

 Monday, October 06, 2014, 12:16

Stepped up both TGHT/TBHT to 35A. 


Tuesday, October 07, 2014, 12:54

TBHT reached to 230A/3.7V and TGHT is still ramping up, currently at 303A/4.5V. Temp measured with Omega-IR2 = 1165C with e'=0.85

Pressure @ 5.2e-7 Torr. 

Increase ramping rate to 2A/min.


 Tuesday, October 07, 2014, 16:21

TGHT is now at 580A and TGHT at 230A.

Temperature is measured with OMEGA-IR2, MIKRON, and analog pyrometer - All the measurements are agreed at 1700C (without the tantalum emissivity correction of 250C)

The OMEGA-IR2 slope has changed to 0.97 for the correction - The real temperature reading from the display is showing 1935C.

Now... attempting to low TBHT to see any temperature change.


 Tuesday, October 07, 2014, 17:01

TGHT @ 580A.

TBHT = 180C, Temp = 1925C

TBHT = 130C, Temp = 1920C

Not much of change in the temperature on the target tube...


Tuesday, October 07, 2014, 17:07

Attempting to increase the temperature to 2000C

TGHT = 600A, Temp = 1955C

TGHT = 620A, Temp = 2000C

Target will continue heating at this temperature overnight... Will continue to monitor.


 Tuesday, October 07, 2014, 20:59

After almost 4 hours of heating at 620A on TGHT, the temperature has dropped to 1980C.  

Pressure is coming down to 1.17e-6 Torr.  

Increased TGHT to 630A to maintain temp @ 2000C


 

 Wednesday, October 08, 2014, 11:46

Temperature readout from omega-IR2C = 2054C

TGHT = 11.14V, 628.0A

TBHT = 2.01V, 129.8A

IGP1 = 8.2e-7Torr

Initiating auto-cool for TGHT @ 2A/min, TBHT @ 1A/min


 Thursday, October 09, 2014, 16:00

vented in air and opened up this morning

target container looks good!


 

    Reply  Thursday, October 09, 2014, 16:37, John Wong, Empty, 40282-5, LP-SIS, Done, Sintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR) 

Laura Lambert wrote:

John Wong wrote:

Laura Lambert wrote:

 Thursday, October 02, 2014, 11:51

Target container sprayed with TaC, currently drying in fume hood


 Monday, October 06, 2014, 12:11

Target container & back block is wrapped with 3 layers of Ta-heat shield.  The chamber has been pumped down over the weekend. 

Pressure currently at 2.23e-7 Torr. 

HS water valves open; no leaks detected.

TGHT will be ramped up to 580A at 0.2A/min

TBHT will be ramped up to 230A at 0.2A/min.


 

 Monday, October 06, 2014, 12:16

Stepped up both TGHT/TBHT to 35A. 


Tuesday, October 07, 2014, 12:54

TBHT reached to 230A/3.7V and TGHT is still ramping up, currently at 303A/4.5V. Temp measured with Omega-IR2 = 1165C with e'=0.85

Pressure @ 5.2e-7 Torr. 

Increase ramping rate to 2A/min.


 Tuesday, October 07, 2014, 16:21

TGHT is now at 580A and TGHT at 230A.

Temperature is measured with OMEGA-IR2, MIKRON, and analog pyrometer - All the measurements are agreed at 1700C (without the tantalum emissivity correction of 250C)

The OMEGA-IR2 slope has changed to 0.97 for the correction - The real temperature reading from the display is showing 1935C.

Now... attempting to low TBHT to see any temperature change.


 Tuesday, October 07, 2014, 17:01

TGHT @ 580A.

TBHT = 180C, Temp = 1925C

TBHT = 130C, Temp = 1920C

Not much of change in the temperature on the target tube...


Tuesday, October 07, 2014, 17:07

Attempting to increase the temperature to 2000C

TGHT = 600A, Temp = 1955C

TGHT = 620A, Temp = 2000C

Target will continue heating at this temperature overnight... Will continue to monitor.


 Tuesday, October 07, 2014, 20:59

After almost 4 hours of heating at 620A on TGHT, the temperature has dropped to 1980C.  

Pressure is coming down to 1.17e-6 Torr.  

Increased TGHT to 630A to maintain temp @ 2000C


 

 Wednesday, October 08, 2014, 11:46

Temperature readout from omega-IR2C = 2054C

TGHT = 11.14V, 628.0A

TBHT = 2.01V, 129.8A

IGP1 = 8.2e-7Torr

Initiating auto-cool for TGHT @ 2A/min, TBHT @ 1A/min


 Thursday, October 09, 2014, 16:00

vented in air and opened up this morning

target container looks good!


 

 Thursday, October 09, 2014, 16:36

Photos for the OMEGA-IR2C temp measurement can be found on this link (see also the subfolder for the heating process):

https://www.dropbox.com/sh/n5sxcepg7e847xw/AACMubuKW1idd49D1Nz_0diNa?dl=0

Entry  Monday, November 10, 2014, 13:55, Laura Lambert, Empty, , LP-SIS, Done, Sintering TaC coating container for UCx#11 [2nd container] 

Monday, November 10, 2014, 13:51

target container was sprayed with TaC on friday and sintered over the weekend.
vented and removed from evap2 this morning, looks good.

this container will be used as a round2 for UCx #11 since the last container broke as it was being assembled.

hopefully all the materials can be recovered and re-used/re-loaded into the new container...


 

Entry  Wednesday, November 19, 2014, 15:10, Laura Lambert, Empty, 39530-2, LP-FEBIAD, Done, test#1. direct voltage and OMEGA temperature measurements test#1_TGHT_[without_vacuum].JPGtest#1_excel.JPGtest#1_graph1.JPGtest#1_graph2.JPG

 Wednesday, November 19, 2014, 15:10

currently pumping down


 Wednesday, November 19, 2014, 15:28

container is wrapped with 3 x Ta-heat shield

leak check done

Starting voltage = -0.017mV

TGHT = 0A, 0V

TBHT = 0A, 0V

IGP1 = 1.7e-6 Torr


 Wednesday, November 19, 2014, 16:33

Tapped TGHT up manually to 100A

DV [direct voltage] = 0.33V

TGHT = 109A

TBHT = 0A

IGP1 = 1.3e-6 Torr

Initiating auto-ramp of TGHT to 400A at 2A/min


 Thursday, November 20, 2014, 09:49

DV = 3.47V

OMEGA = 1645C

TGHT = 401A, 6.49V

TBHT = 0

IGP1 = 4.5e-7Torr

TGHT finished auto-ramping ~19:00 last night

initiating manual tap up to 2000 celsius or 580A [whichever is higher] and recording activity


 Friday, November 21, 2014, 12:50

TGHT was ramped up to 580A yesterday and left overnight.

In the picture attached one can see the TGHT current has remained constant at 578A [red = TGHT current, green = TGHT voltage]

The vacuum has slowly gone down as expected.

However, the DV, TGHT voltage and temperature have deviated. They have dipped up and down several times throughout the night. The first deviation was observed ~3.5hours after it reached its target of 580A.

DV reached 6.02V [when TGHT initially hit 580A] and increased to 6.27V after 3.5hrs and is currently sitting at 5.94V

OMEGA reached 2111C [when TGHT initially hit 580A] and increased to 2154C after 3.5 hrs and is currently sitting at 2094C

TGHT voltage reached 10.4V [when TGHT initially hit 580A] and increased to 10.6V after 3.5hrs and is currently sitting at 10.3V


 Friday, November 21, 2014, 17:59

EVAP2 sat at max setting: TGHT = 580A and TBHT = 230A for ~4hours

Initiating auto-cool TGHT 2A/min, TBHT 1A/min


 Monday, November 24, 2014, 14:28

Vented and opened this morning.

No notable changes on target container.

[See attachments for more detailed information of results]


 

ELOG V2.9.2-2455