Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 18 of 34  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Authordown Target Material Target Oven W.O# Source Status Subject Text Attachments
  157   Tuesday, September 23, 2014, 18:32 John WongEmpty40282-5TARGET BOATDoneSintering Ta target boat with TaC coating (with Temp measurement)

    

       
            
  
  158   Thursday, September 25, 2014, 17:35 John WongEndcaps40282-5TARGET BOATDoneSintering Ta-coated endcaps (temp measured) Thursday, September 25, 2014, 17:32
Target boat is filled with Ta-coated
endcaps.  The caps are stacked together. 
  
  159   Thursday, October 02, 2014, 11:26 John WongEmpty  MaintenanceBroken insulators  Thursday, October 02, 2014, 11:22
It was found that after the last
process, Evap#2 has broken insulators - the
  
  162   Monday, October 06, 2014, 12:17 John WongEmpty40282-5LP-SISIn progressSintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR)

    

       
            
  
  164   Thursday, October 09, 2014, 15:59 John WongNb TARGET BOATIn progressConditioning Nb target (for Bob) Thursday, October 09, 2014, 15:56
The target boat contains 5 samples
of Nb discs.  Each disc is wrapped with
  
  165   Thursday, October 09, 2014, 16:37 John WongEmpty40282-5LP-SISDoneSintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR)

    

       
            
  
  166   Thursday, October 09, 2014, 17:41 John WongNb TARGET BOATDoneConditioning Nb targets (for Bob) Thursday, October 09, 2014, 17:36
Target boat consists of 5 Nb discs. 
Each disc is wrapped with Nb foil, and to
 samples@1400C.png 
  168   Tuesday, November 04, 2014, 16:20 John WongSiC TARGET BOATIn progressTEST: Fabrication of SiC & Determine phase transformation 3C vs 6HTuesday, November 04, 2014, 16:08
The purpose of this experiment is
to improve the fabrication of SiC. 
  
  169   Tuesday, November 04, 2014, 16:21 John WongSiC39530-8HP-FEBIADDoneTesting the new OMEGA-IR2C on SiC#31 target (NOT TO BE USED ONLINE)

    

       
            
  
  176   Monday, February 02, 2015, 16:33 John WongEmpty41077-2LP-SISIn progressCoating/Sintering TaC on target container - For Graphite Insert Monday, February 02, 2015, 16:28
Container is coated with TaC. 
No Ta foil wrapped around. 
  
  178   Thursday, February 05, 2015, 18:03 John WongEmpty41077-2LP-SISIn progressCoating/Sintering TaC on target container - For Graphite Insert

    

       
            
  
  184   Monday, March 16, 2015, 17:38 John WongTa38817-5HP-SISDoneConditioning Ta target

    

       
            
  
  187   Thursday, April 23, 2015, 10:17 John WongSiC38817-7HP-SISDoneSintering SiC#31

    

       
            
 Screen_Shot_2015-04-23_at_3.04.01_PM.png 
  189   Monday, May 04, 2015, 17:26 John Wong 40282-4TARGET BOATIn progressSintering four different ZrC samples

    

       
            
  
  195   Monday, May 25, 2015, 17:08 John WongEmpty40282-5TARGET BOATIn progressSintering TaC coating on Ta target boat

    

       
            
  
  198   Wednesday, May 27, 2015, 17:58 John WongEndcaps40282-5TARGET BOATIn progressSintering TaC coating on Ta endcaps

    

       
            
  
  201   Thursday, May 28, 2015, 17:50 John WongEndcaps40282-5TARGET BOATDoneSintering TaC coating on Ta endcaps - round 2

    

       
            
  
  204   Monday, June 01, 2015, 18:09 John WongZrC41177-1LP-SISIn progressConditioning ZrC#7

    

       
            
  
  205   Tuesday, June 02, 2015, 13:05 John WongZrC41177-1LP-SISDoneConditioning ZrC#7

    

       
            
  
  208   Friday, June 05, 2015, 12:19 John WongEmpty LP-IG-LISIn progressSintering TaC coating container for UCx

    

       
            
  
ELOG V2.9.2-2455