    Reply  Tuesday, September 23, 2014, 18:32, John Wong, Empty, 40282-5, TARGET BOAT, Done, Sintering Ta target boat with TaC coating (with Temp measurement) 


    
        
            Laura Lambert wrote:
        
        
            
             Tuesday, September 23, 2014, 15:00
Entry  Thursday, September 25, 2014, 17:35, John Wong, Endcaps, 40282-5, TARGET BOAT, Done, Sintering Ta-coated endcaps (temp measured)  
Thursday, September 25, 2014, 17:32
Target boat is filled with Ta-coated endcaps.  The caps are stacked together.  In between each cap, a piece of graphite foil is used
for separation so the Ta caps would not fused. 
Entry  Thursday, October 02, 2014, 11:26, John Wong, Empty, , , Maintenance, Broken insulators  
 Thursday, October 02, 2014, 11:22
It was found that after the last process, Evap#2 has broken insulators - the cylinder insulator that supports the target centre legs and the block
insulator that supports the terminals.  
    Reply  Monday, October 06, 2014, 12:17, John Wong, Empty, 40282-5, LP-SIS, In progress, Sintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR) 


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, October 02, 2014, 11:51
Entry  Thursday, October 09, 2014, 15:59, John Wong, Nb, , TARGET BOAT, In progress, Conditioning Nb target (for Bob)  
Thursday, October 09, 2014, 15:56
The target boat contains 5 samples of Nb discs.  Each disc is wrapped with Nb foil and labelled. 
Samples will be heated up to 1400C for 4 hours. 
    Reply  Thursday, October 09, 2014, 16:37, John Wong, Empty, 40282-5, LP-SIS, Done, Sintering TaC coating container for UCx#11 (temp measured with OMEGA 2IR) 


    
        
            Laura Lambert wrote:
        
        
            
            
            
              
Entry  Thursday, October 09, 2014, 17:41, John Wong, Nb, , TARGET BOAT, Done, Conditioning Nb targets (for Bob)  samples@1400C.png
Thursday, October 09, 2014, 17:36
Target boat consists of 5 Nb discs.  Each disc is wrapped with Nb foil, and to be heated to 1400C for 4 hours.
Chamber has been pumped down to 6.5e-7 Torr.  HS valves open - no leaks detected.
Entry  Tuesday, November 04, 2014, 16:20, John Wong, SiC, , TARGET BOAT, In progress, TEST: Fabrication of SiC & Determine phase transformation 3C vs 6H 
Tuesday, November 04, 2014, 16:08
The purpose of this experiment is to improve the fabrication of SiC.  Previously, the SiC target was heated to 2000c and yellow crystals were
observed.
    Reply  Tuesday, November 04, 2014, 16:21, John Wong, SiC, 39530-8, HP-FEBIAD, Done, Testing the new OMEGA-IR2C on SiC#31 target (NOT TO BE USED ONLINE) 


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, October 23, 2014, 15:34
Entry  Monday, February 02, 2015, 16:33, John Wong, Empty, 41077-2, LP-SIS, In progress, Coating/Sintering TaC on target container - For Graphite Insert  
Monday, February 02, 2015, 16:28
Container is coated with TaC.  No Ta foil wrapped around. 
Chamber is being pumped down.
    Reply  Thursday, February 05, 2015, 18:03, John Wong, Empty, 41077-2, LP-SIS, In progress, Coating/Sintering TaC on target container - For Graphite Insert  


    
        
            Laura Lambert wrote:
        
        
            
            
            
              
    Reply  Monday, March 16, 2015, 17:38, John Wong, Ta, 38817-5, HP-SIS, Done, Conditioning Ta target 


    
        
            Laura Lambert wrote:
        
        
            
             Monday, March 09, 2015, 16:47
    Reply  Thursday, April 23, 2015, 10:17, John Wong, SiC, 38817-7, HP-SIS, Done, Sintering SiC#31 Screen_Shot_2015-04-23_at_3.04.01_PM.png


    
        
            Laura Lambert wrote:
        
        
            
             Friday, April 17, 2015, 16:01
    Reply  Monday, May 04, 2015, 17:26, John Wong, , 40282-4, TARGET BOAT, In progress, Sintering four different ZrC samples 


    
        
            Laura Lambert wrote:
        
        
            
             Friday, May 01, 2015, 10:27
    Reply  Monday, May 25, 2015, 17:08, John Wong, Empty, 40282-5, TARGET BOAT, In progress, Sintering TaC coating on Ta target boat 


    
        
            Laura Lambert wrote:
        
        
            
             Friday, May 22, 2015, 11:43
    Reply  Wednesday, May 27, 2015, 17:58, John Wong, Endcaps, 40282-5, TARGET BOAT, In progress, Sintering TaC coating on Ta endcaps 


    
        
            Laura Lambert wrote:
        
        
            
             Tuesday, May 26, 2015, 13:06
    Reply  Thursday, May 28, 2015, 17:50, John Wong, Endcaps, 40282-5, TARGET BOAT, Done, Sintering TaC coating on Ta endcaps - round 2 


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, May 28, 2015, 11:34
    Reply  Monday, June 01, 2015, 18:09, John Wong, ZrC, 41177-1, LP-SIS, In progress, Conditioning ZrC#7 


    
        
            Laura Lambert wrote:
        
        
            
             Friday, May 29, 2015, 11:21
    Reply  Tuesday, June 02, 2015, 13:05, John Wong, ZrC, 41177-1, LP-SIS, Done, Conditioning ZrC#7 


    
        
            John Wong wrote:
        
        
            
            
            
              
    Reply  Friday, June 05, 2015, 12:19, John Wong, Empty, , LP-IG-LIS, In progress, Sintering TaC coating container for UCx 


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, June 04, 2015, 9:07