Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 16 of 34  Not logged in ELOG logo
ID Date Author Target Materialdown Target Oven W.O# Source Status Subject Text Attachments
  200   Thursday, May 28, 2015, 11:36 Laura LambertEndcaps40282-5TARGET BOATIn progressSintering TaC coating on Ta endcaps - round 2 Thursday, May 28, 2015, 11:34
Endcaps were sintered [see elog#199]
 endcaps_-_may_28_-_round2.jpg 
  201   Thursday, May 28, 2015, 17:50 John WongEndcaps40282-5TARGET BOATDoneSintering TaC coating on Ta endcaps - round 2

    

       
            
  
  202   Friday, May 29, 2015, 11:18 Laura LambertEndcaps40282-5TARGET BOATDoneSintering TaC coating on Ta endcaps - round 2

    

       
            
 endcaps_-round2_sintering_(1).jpgendcaps_-round2_sintering_(2).jpg 
  230   Monday, July 13, 2015, 11:54 Laura LambertEndcaps40282-5TARGET BOATProblemsSintering TaC coating on Ta endcaps Monday, July 13, 2015, 11:53
A Ta foil is placed in the target
 endcaps_july_14_2015.JPGIMG_20150715_102332633.jpgIMG_20150715_102240364_HDR.jpgIMG_20150715_102631676.jpg 
  235   Thursday, August 06, 2015, 15:45 Laura LambertEndcaps TARGET BOATDoneSintering TaC coating on Ta endcaps Thursday, August 06, 2015, 15:36
The endcaps are stacked together
with a punched out disc of graphite foil
 round2_july_batch_(1).jpground2_july_batch_(2).jpground2_july_batch_(3).jpgsingle_round_sintering_(1).jpgsingle_round_sintering_(2).jpg 
  344   Friday, February 03, 2017, 14:18 Laura LambertEndcaps TARGET BOATProblemsSintering TaC coating on Ta endcaps and springs Friday, February 03, 2017, 14:17
The endcaps are stacked together
 IMG_1526.JPGIMG_1527.JPG 
  348   Tuesday, February 14, 2017, 15:44 Laura LambertEndcaps TARGET BOATProblems resolvedSintering TaC coating on Ta endcaps and springs

    

       
            
  
  349   Tuesday, February 14, 2017, 15:48 Laura LambertEndcaps TARGET BOATDoneSintering TaC coating on Ta endcaps and springs

    

       
            
 IMG_1542.JPGIMG_1545.JPGIMG_1549.JPGIMG_1552.JPG 
  395   Thursday, December 07, 2017, 10:03 Laura LambertEndcaps TARGET BOATIn progressSintering TaC coating on endcaps and springs Thursday, December 07, 2017, 09:57
Each endcap is wrapped in a
  
  396   Thursday, December 07, 2017, 11:56 Laura LambertEndcaps TARGET BOATProblemsSintering TaC coating on endcaps and springs

    

       
            
 trip_due_to_new_vacuum_limits_not_being_updated_properly.JPG 
  397   Friday, December 08, 2017, 15:29 Laura LambertEndcaps TARGET BOATProblems resolvedSintering TaC coating on endcaps and springs

    

       
            
  
  398   Friday, December 08, 2017, 15:42 Laura LambertEndcaps TARGET BOATDoneSintering TaC coating on endcaps and springs

    

       
            
  
  447   Tuesday, June 04, 2019, 08:41 Darwin Ortiz RosalesEndcaps TARGET BOATDoneSintering TaC coating on endcaps and springsTuesday,
June 04, 2019, 08:36
  
  465   Monday, November 04, 2019, 14:25 Darwin Ortiz RosalesEndcaps40282-4TARGET BOATDone 
Monday, November 04, 2019, 14:19 
Each endcap is separated with
 Nov4CapCoating.PNG 
  563   Monday, November 08, 2021, 09:36 Darwin Ortiz RosalesEndcaps TARGET BOATDoneCoating of Ta caps and Ta springs (8 caps and 2 springs)Monday, November 08, 2021, 09:35
Two groups of 4 caps wrapped in graphite
with graphite discs in between. 
  
  614   Thursday, March 09, 2023, 06:58 Darwin Ortiz RosalesEndcaps TARGET BOATDoneTaC coated endcaps and spring sinteringThursday,
March 09, 2023, 06:53
2 TaC coated springs and  12
  
  677   Tuesday, September 10, 2024, 13:16 Darwin Ortiz RosalesEndcaps TARGET BOATDoneTaC coating sinteringA boat lined up with graphite and wrapped
in 3 Ta heatshileds
Vacuum IGP1 initial =6.1 e-06 Torr
  
  4   Tuesday, February 28, 2012, 11:00 John WongEmptyTest oven LP-SISDoneMeasuring temperatures, currents & voltages Tuesday, February 28, 2012, 10:36
Two thermocouples were inserted through
the left side of the copper heat shield,
 Evap_2_thermocouple.jpg 
  15   Tuesday, April 03, 2012, 09:00 John WongEmptyTa-target boat #2  Sintering Ta-target boat with TaC coatingTuesday, April 03, 2012, 08:54
Yesterday, a new target boat was
sprayed with TaC coating and let dried.
 TGHT_maxcurrent.jpg 
  36   Thursday, July 19, 2012, 17:05 John WongEmpty37918-3LP-FEBIADDoneCoating target oven /w TaC & sintering for UCx#5 Thursday, July 19, 2012, 16:58
The target container was coated with
TaC. 
  
ELOG V2.9.2-2455