402
|
Wednesday, February 28, 2018, 15:18 |
Laura Lambert | Empty | 42218-13 | LP-SIS | Done | Sintering TaC coating on UCx#22 container | Wednesday, February 28, 2018, 15:16
Container coated with TaC using |
|
404
|
Tuesday, April 17, 2018, 10:24 |
Laura Lambert | Ta | 41177-3 | LP-SIS | Done | Conditioning Ta#56 back-up target/ Temp measurements for Aurelia | Tuesday, April 17, 2018, 10:20
Target consists of 470 discs. |
|
405
|
Thursday, April 19, 2018, 12:38 |
Laura Lambert | Ta | 41177-3 | LP-SIS | Done | Round 2. Temp measurements for Aurelia target Ta#56 | Thursday, April 19, 2018, 12:37
See elog i.d. 404 for target description
and first round of heating. |
|
410
|
Wednesday, May 23, 2018, 15:21 |
Laura Lambert | Empty | | HP-FEBIAD-CTL | Done | Sintering TaC coating container for UCx#23 | Wednesday, May 16, 2018, 09:56
Container coated with TaC using |
|
1
|
Monday, March 28, 2011, 12:40 |
John Wong | | | | | Under Construction | Evaporator #2 is still under construction.
For further information please contact Jens
Lassen. |
|
3
|
Monday, February 13, 2012, 16:24 |
John Wong | | | | Done | Evaporator #2 Commissioned | Monday, February 13, 2012, 16:21
The Evaporator 2 is now commissioned.
See attachment#1 for the commissioning |
|
4
|
Tuesday, February 28, 2012, 11:00 |
John Wong | Empty | Test oven | LP-SIS | Done | Measuring temperatures, currents & voltages | Tuesday, February 28, 2012, 10:36
Two thermocouples were inserted through
the left side of the copper heat shield, |
|
5
|
Thursday, March 01, 2012, 14:42 |
John Wong | | | | | IEVAP2:TGHT/TBHT max current setpoint issue | Thursday, March 01, 2012, 14:35
Both the IEVAP2:TBHT and IEVAP2:TGHT
maximum current setpoints on the vacuum page |
|
7
|
Tuesday, March 20, 2012, 14:35 |
John Wong | | | | Done | Evap#2 Backing up muffler not connected to the exhaust system. | Tuesday, March 20, 2012, 14:22
The Evaporator #2 backing pump (IEVAP2:BP1)
muffler has not connected to the exhaust |
|
8
|
Tuesday, March 20, 2012, 14:39 |
John Wong | BeO | Target boat #1 | | Done | Sintering BeO pellets |
|
|
9
|
Thursday, March 22, 2012, 00:34 |
John Wong | BeO | Target boat #1 | | Done | Sintering BeO pellets |
|
|
12
|
Thursday, March 29, 2012, 22:44 |
John Wong | BeO | Target boat #1 | | Done | Sintering new BeO pellets |
|
|
13
|
Friday, March 30, 2012, 23:21 |
John Wong | BeO | Target boat #1 | | Done | Sintering new BeO pellets |
|
|
15
|
Tuesday, April 03, 2012, 09:00 |
John Wong | Empty | Ta-target boat #2 | | | Sintering Ta-target boat with TaC coating | Tuesday, April 03, 2012, 08:54
Yesterday, a new target boat was
sprayed with TaC coating and let dried. |
|
17
|
Tuesday, May 15, 2012, 12:26 |
John Wong | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target | Tuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on
Nov 03, 2010. The target consists of |
|
18
|
Tuesday, May 15, 2012, 14:00 |
John Wong | | | | Maintenance | Installed a new stainless metal heat shield | Tuesday, May 15, 2012, 13:45
It was discovered that one of the
insulators that supported the target module |
|
19
|
Tuesday, May 15, 2012, 17:03 |
John Wong | | | | Problems | TBHT cooling line leaky | Tuesday, May 15, 2012, 17:00
It was found that there were water
droplets from the TBHT cooling line. The |
|
20
|
Tuesday, May 15, 2012, 17:06 |
John Wong | | | | Problems resolved | TBHT power supply faulty | Tuesday, May 15, 2012, 17:03
The tube heater power supply current
readback and setpoint are not matching. Ray |
|
21
|
Wednesday, May 16, 2012, 14:04 |
John Wong | | | | Problems resolved | TBHT cooling line leaky |
|
|
23
|
Friday, May 18, 2012, 13:17 |
John Wong | SiC | 38481-2 | HP-SIS | Done | Re-condition the HP-SIS SiC target |
|
|