Wednesday, February 28, 2018, 15:18, Laura Lambert, Empty, 42218-13, LP-SIS, Done, Sintering TaC coating on UCx#22 container
|
Wednesday, February 28, 2018, 15:16
Container coated with TaC using 'flushing technique' and let dry.
Q-tip to plug ionizer became stuck in ionizer, removed manually with small drill bit. |
Tuesday, April 17, 2018, 10:24, Laura Lambert, Ta, 41177-3, LP-SIS, Done, Conditioning Ta#56 back-up target/ Temp measurements for Aurelia
|
Tuesday, April 17, 2018, 10:20
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides] |
Thursday, April 19, 2018, 12:38, Laura Lambert, Ta, 41177-3, LP-SIS, Done, Round 2. Temp measurements for Aurelia target Ta#56
|
Thursday, April 19, 2018, 12:37
See elog i.d. 404 for target description and first round of heating.
Endcaps inserted and expanded. |
Wednesday, May 23, 2018, 15:21, Laura Lambert, Empty, , HP-FEBIAD-CTL, Done, Sintering TaC coating container for UCx#23
|
Wednesday, May 16, 2018, 09:56
Container coated with TaC using 'flushing technique' and let dry over weekend.
Cleaned ionizer tube with acetone, no coating inside ionizer tube. |
Monday, March 28, 2011, 12:40, John Wong, , , , , Under Construction
|
Evaporator #2 is still under construction. For further information please contact Jens Lassen. |
Monday, February 13, 2012, 16:24, John Wong, , , , Done, Evaporator #2 Commissioned
|
Monday, February 13, 2012, 16:21
The Evaporator 2 is now commissioned. See attachment#1 for the commissioning report or refer to Document #43321. |
Tuesday, February 28, 2012, 11:00, John Wong, Empty, Test oven , LP-SIS, Done, Measuring temperatures, currents & voltages
|
Tuesday, February 28, 2012, 10:36
Two thermocouples were inserted through the left side of the copper heat shield, see attachment #1. One thermocouple is attached to the target
tube with a Ta-wire, and the other is attached to the back block. |
Thursday, March 01, 2012, 14:42, John Wong, , , , , IEVAP2:TGHT/TBHT max current setpoint issue
|
Thursday, March 01, 2012, 14:35
Both the IEVAP2:TBHT and IEVAP2:TGHT maximum current setpoints on the vacuum page (see page: /edl/ievap2_vacuum1.edl) are wrong.
For IEVAP2:TGHT, the maximum current setpoint should be 1500A (see page: /edl/ievap2tghtcp.edl), not 1000A. |
Tuesday, March 20, 2012, 14:35, John Wong, , , , Done, Evap#2 Backing up muffler not connected to the exhaust system.
|
Tuesday, March 20, 2012, 14:22
The Evaporator #2 backing pump (IEVAP2:BP1) muffler has not connected to the exhaust duct.
See attachment#1 as to where the muffler should be connected to the exhaust ducting system. |
Tuesday, March 20, 2012, 14:39, John Wong, BeO, Target boat #1, , Done, Sintering BeO pellets
|
Nikita Bernier wrote:
Monday, March 19, 2012, 17:04 |
Thursday, March 22, 2012, 00:34, John Wong, BeO, Target boat #1, , Done, Sintering BeO pellets
|
Nikita Bernier wrote:
Monday, March 19, 2012, 17:04 |
Thursday, March 29, 2012, 22:44, John Wong, BeO, Target boat #1, , Done, Sintering new BeO pellets
|
Nikita Bernier wrote:
Thursday, March 29, 2012, 19:17 |
Friday, March 30, 2012, 23:21, John Wong, BeO, Target boat #1, , Done, Sintering new BeO pellets
|
John Wong wrote:
|
Tuesday, April 03, 2012, 09:00, John Wong, Empty, Ta-target boat #2, , , Sintering Ta-target boat with TaC coating
|
Tuesday, April 03, 2012, 08:54
Yesterday, a new target boat was sprayed with TaC coating and let dried.
The boat was then installed in the Evap#2 chamber and pumped down to 10-6 Torr before the target heater was turned on. NOTE: Target boat |
Tuesday, May 15, 2012, 12:26, John Wong, SiC, 38481-2, HP-SIS, Done, Re-condition the HP-SIS SiC target
|
Tuesday, May 15, 2012, 12:24
The HP-SIS SiC target was made on Nov 03, 2010. The target consists of 405 discs, 18.5cm in length. It was sintered in the Evaporator#1.
This target is going into Evap#2 for re-conditioning. It is currently being pumped down. |
Tuesday, May 15, 2012, 14:00, John Wong, , , , Maintenance, Installed a new stainless metal heat shield
|
Tuesday, May 15, 2012, 13:45
It was discovered that one of the insulators that supported the target module broke apart (see Attachment#1). This might be caused by the
heat from the target legs that reflected back from the base to the insulators. The burnt marks are the evidence. |
Tuesday, May 15, 2012, 17:03, John Wong, , , , Problems, TBHT cooling line leaky
|
Tuesday, May 15, 2012, 17:00
It was found that there were water droplets from the TBHT cooling line. The joint is leaky. (see attachment 1)
A message has sent to Rick M. |
Tuesday, May 15, 2012, 17:06, John Wong, , , , Problems resolved, TBHT power supply faulty
|
Tuesday, May 15, 2012, 17:03
The tube heater power supply current readback and setpoint are not matching. Ray Dube checked the power supply and confirmed that it is faulty.
He will replace a functional p/s tomorrow. |
Wednesday, May 16, 2012, 14:04, John Wong, , , , Problems resolved, TBHT cooling line leaky
|
John Wong wrote:
Tuesday, May 15, 2012, 17:00 |
Friday, May 18, 2012, 13:17, John Wong, SiC, 38481-2, HP-SIS, Done, Re-condition the HP-SIS SiC target
|
Nikita Bernier wrote:
|
|