  Evaporator_2, Page 14 of 34  Not logged in ELOG logo
Entry  Wednesday, February 28, 2018, 15:18, Laura Lambert, Empty, 42218-13, LP-SIS, Done, Sintering TaC coating on UCx#22 container 
Entry  Tuesday, April 17, 2018, 10:24, Laura Lambert, Ta, 41177-3, LP-SIS, Done, Conditioning Ta#56 back-up target/ Temp measurements for Aurelia 
Entry  Thursday, April 19, 2018, 12:38, Laura Lambert, Ta, 41177-3, LP-SIS, Done, Round 2. Temp measurements for Aurelia target Ta#56 
Entry  Wednesday, May 23, 2018, 15:21, Laura Lambert, Empty, , HP-FEBIAD-CTL, Done, Sintering TaC coating container for UCx#23 
Entry  Monday, March 28, 2011, 12:40, John Wong, , , , , Under Construction 
Entry  Monday, February 13, 2012, 16:24, John Wong, , , , Done, Evaporator #2 Commissioned  Evap2_Commissioning_Report.PDF
Entry  Tuesday, February 28, 2012, 11:00, John Wong, Empty, Test oven , LP-SIS, Done, Measuring temperatures, currents & voltages Evap_2_thermocouple.jpg
Entry  Thursday, March 01, 2012, 14:42, John Wong, , , , , IEVAP2:TGHT/TBHT max current setpoint issue TGHT_TBHT_setpoints.JPG
Entry  Tuesday, March 20, 2012, 14:35, John Wong, , , , Done, Evap#2 Backing up muffler not connected to the exhaust system. Evap2_backingpump.jpgscroll_pump_exhaust.jpg
    Reply  Tuesday, March 20, 2012, 14:39, John Wong, BeO, Target boat #1, , Done, Sintering BeO pellets 
    Reply  Thursday, March 22, 2012, 00:34, John Wong, BeO, Target boat #1, , Done, Sintering BeO pellets voltage_limiting.jpgTemp_-_Cal_vs_Measured.JPGTGHT_525A.JPG
    Reply  Thursday, March 29, 2012, 22:44, John Wong, BeO, Target boat #1, , Done, Sintering new BeO pellets Parameter.jpg
    Reply  Friday, March 30, 2012, 23:21, John Wong, BeO, Target boat #1, , Done, Sintering new BeO pellets archive_24hr.jpgTGHT@240A.jpgTGHT@700A.jpgTGHT@750A.jpgTGHT@0A.jpg
Entry  Tuesday, April 03, 2012, 09:00, John Wong, Empty, Ta-target boat #2, , , Sintering Ta-target boat with TaC coating TGHT_maxcurrent.jpg
Entry  Tuesday, May 15, 2012, 12:26, John Wong, SiC, 38481-2, HP-SIS, Done, Re-condition the HP-SIS SiC target 
Entry  Tuesday, May 15, 2012, 14:00, John Wong, , , , Maintenance, Installed a new stainless metal heat shield Evaporator#2_broken_insulator.pdfEvaporator#2_upgrade_.pdf
Entry  Tuesday, May 15, 2012, 17:03, John Wong, , , , Problems, TBHT cooling line leaky TBHT_cooling_line_leaky.pdf
Entry  Tuesday, May 15, 2012, 17:06, John Wong, , , , Problems resolved, TBHT power supply faulty tubeheater_control.png
    Reply  Wednesday, May 16, 2012, 14:04, John Wong, , , , Problems resolved, TBHT cooling line leaky 
    Reply  Friday, May 18, 2012, 13:17, John Wong, SiC, 38481-2, HP-SIS, Done, Re-condition the HP-SIS SiC target 