Entry  Thursday, September 26, 2013, 15:17, John Wong, Empty, 39814-VI-?, LP-IG-LIS, Done, Sintering empty target oven coated with TaC for UCx#8 UCx#8_container_TaC_coat_sintering.PNG

Thursday, September 26, 2013, 13:04

The LP-IG-LIS target container is coated with TaC. 

Container is wrapped with 3 layers of Ta heat shield and about to go through the sintering process.

A thermocouple is inserted to measure the temperature inside the tube (1st attempt ever). 

Click on the link for detailed pictures:

https://www.dropbox.com/sh/6dc5arajg87mws9/6cU5OxjkZg


TGHT will be ramped up to 580A at 0.2A/min

TBHT will be ramped up to 230A at 0.2A/min.

Chamber has been pumped down.  HS cooling H2O valves are opened, and no leaks are detected. 

Currently IGP1 @ 5.9e-6 Torr.


 Thursday, September 26, 2013, 15:44

TGHT stepped up to 30A.  TBHT currently @ 0A. 

Temp @ 35C, Vac @ 1.4e-5 Torr.


 Monday, September 30, 2013, 14:54

The container was heated up to 580A TGHT/ 230A TBHT for a day (see attachment #1 for vac vs cur plot).

The temperature was measure at ~1780C. (see link for details: https://www.dropbox.com/sh/d8d9j2t60qlm3jk/nkMh7dx_R8 )

The target was cooled down and vented. 

Proceed complete.


 

 

Entry  Monday, July 22, 2013, 15:03, John Wong, Empty, 38634-7, LP-SIS, Done, Sintering empty target oven coated with TaC for UCx#7 

Monday, July 22, 2013, 15:00

Target container is coated with TaC - this container will be used for UCx#7.

Container is wrapped with 3 layers of Ta, including the back-block.

For the sintering process:

TGHT will be ramped up to 580A at 0.2A/min

TBHT will be ramped up to 230A at 0.2A/min.

Chamber has been pumped down.  HS cooling H2O valves are opened, and no leaks are detected. 

Currently IGP1 @ 7.03e-6 Torr. 


 Monday, July 22, 2013, 15:19

TGHT/TBHT was stepped up to 20A.  Pressure increased to ~1.2e-5 Torr.

Auto-ramping initiated...


 Wednesday, July 24, 2013, 18:40

TGHT and TBHT have reached to 580A/230A, respectively.  Target has been heated for ~4 hours at that max current.

Vacuum currently at 1.65e-6 Torr.

Auto-cooling initiated... (TGHT @ -1A/min, TBHT -0.5A/min)

Target will be vented in air tomorrow.


 

Entry  Thursday, June 25, 2015, 16:20, Laura Lambert, ZrC, 41177-2, LP-SIS, In progress, Sintering back-up ZrC 

 Thursday, June 25, 2015, 16:14

Total number of foils: 422 discs

Total mass of materials [incl graphite foils]: 

Total length packed: 12.0cm

Container has one Ta heat shield.

No endcaps inserted to allow outgassing

Two TaC coated Ta wires formed into a spring inserted either end to avoid ZrC expansion of materials.

Currently being pumped down.


 Friday, June 26, 2015, 11:44

HS water valves opened.

No leaks detected.

Initiating ramp up.


 Friday, June 26, 2015, 14:44

EVAP2 was tapped up manually to 50A.

Vacuum tripped evap off.

Tapping back up manually now...


 Friday, June 26, 2015, 15:53

Tapped up manually to 45A for both TGHT and TBHT

IGP1 = 4.8e-5 Torr

Will initiate auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively once vacuum settled down and stable.

Max setpoints set to 520A and 230A for the TGHT and TBHT respectively.

Good Vacuum = 3.0e-5 Torr. Bad Vacuum = 4.0e-5 Torr.


 

    Reply  Monday, June 29, 2015, 07:05, John Wong, ZrC, 41177-2, LP-SIS, Done, Sintering back-up ZrC Screen_Shot_2015-06-29_at_7.14.12_AM.png

Laura Lambert wrote:

 Thursday, June 25, 2015, 16:14

Total number of foils: 422 discs

Total mass of materials [incl graphite foils]: 

Total length packed: 13.2cm

Container has one Ta heat shield.

No endcaps inserted to allow outgassing

Two TaC coated Ta wires formed into a spring inserted either end to avoid ZrC expansion of materials.

Currently being pumped down.


 Friday, June 26, 2015, 11:44

HS water valves opened.

No leaks detected.

Initiating ramp up.


 Friday, June 26, 2015, 14:44

EVAP2 was tapped up manually to 50A.

Vacuum tripped evap off.

Tapping back up manually now...


 Friday, June 26, 2015, 15:53

Tapped up manually to 45A for both TGHT and TBHT

IGP1 = 4.8e-5 Torr

Will initiate auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively once vacuum settled down and stable.

Max setpoints set to 520A and 230A for the TGHT and TBHT respectively.

Good Vacuum = 3.0e-5 Torr. Bad Vacuum = 4.0e-5 Torr.


 

 Monday, June 29, 2015, 06:57

TGHT has been at 520A/9.80V, DV 5.80V for 7 hours, temperature measured at 1800C.  Vac is coming down to 9.18e-6 Torr.  However, TGHT voltage is slightly going up over the 7 hours of heating, See screenshot attachment. (Can't make further comments until target is inspected.)

Initiated cooling down at 2A/min for TGHT and 1A/min for TBHT.

Chamber can be vented later today.


 Monday, June 29, 2015, 14:58

Target has been inspected.

Slightly crystallization on the outer tube of the container can be observed. 

Overall, the container looks a lot better than before. 

Rn foiled inserted. Salt added - Ready for test-stand


 

Entry  Monday, July 28, 2014, 15:06, Laura Lambert, , 40282-3, LP-SIS, In progress, Sintering ZrC# 6 target 

 Monday, July 28, 2014, 14:41

Total number of foils: 445 discs

Total mass of materials [incl graphite foils]: 49.027 g

Total length packed: 11.2 cm

Container has no Ta heat shields.

Currently being pumped down.


 

    Reply  Tuesday, July 29, 2014, 11:23, John Wong, , 40282-3, LP-SIS, In progress, Sintering ZrC# 6 target 

Laura Lambert wrote:

 Monday, July 28, 2014, 14:41

Total number of foils: 445 discs

Total mass of materials [incl graphite foils]: 49.027 g

Total length packed: 11.2 cm

Container has no Ta heat shields.

Currently being pumped down.


 

 Tuesday, July 29, 2014, 11:19

Chamber was pumped down overnight to ~5.5e-7 torr.

HS water valve opened; no leaks were detected.

Stepped up TGHT/TBHT to 40A. IG went up 8e-6 Torr and stabilized. 

Initiated auto-ramping TGHT @ 580A, TBHt @ 230A at 0.2A/min


 

Entry  Tuesday, July 30, 2019, 15:42, Darwin Ortiz Rosales, ZrC, 43044-6, LP-SIS, Done, Sintering ZrC Discs 
 
 

Tuesday, July 30, 2019, 15:33

ZrC backup Target 12.6 cm disc length, 465 g total weight (no springs and no analysis discs).

Total weight= 470 g.

20 Analysis discs weighing 2.368 g (10 at each end).

Two springs (one at each end).

OMEGA slope initially = 0.990  (was changed to 1.09 at higher Temperature as per eLog #434

Target is being pumped down.


Wednesday, July 31, 2019, 09:31

Desired temp = 1900 C, Auto ramping TGHT at  0.1 A/min to reach 400A then  TGHT will be tapped up accordingly to reach desired temperature. (eLog 434)

TBHT will be set fixed at 230A (max). TBHT at 0.1 A/min to reach 230A.

Note: Initially both TGHT and TBHT will be ramped up at 0.3A/min up to 30A each.

IGP1= 1.35e-06 Torr

Good vac at 3.00-5 Torr

Bad vac at 5.0e-5 Torr.


Wednesday, July 31, 2019, 12:02

At 30A pressure was increasing a bit fast, therefore, the ramp was changed to increments of .1A every 120s (.05A/min). 


Thursday, August 01, 2019, 08:42

TGHT = 54.7

TBHT = 54.3

IGP1 = 3.86e-5 Torr

Will changer heat ramp to .1A/min by changing wait interval to 60s


Tuesday, August 06, 2019, 07:14

OMEGA = 1212 C

TGHT = 344.7 A, 5.79 V

TBHT = 233 A, 4.17 V

IGP1 = 1.05 e-06 Torr

Autoramping to 400A at increments of 0.1A/min


Tuesday, August 06, 2019, 09:50

OMEGA = 1233 C

TGHT = 360 A, 6.05 V

TBHT = 233 A, 4.18 V

IGP1 = 1.21 e-06 Torr

increasing autoramp increments to .5A/min


Tuesday, August 06, 2019, 12:27

OMEGA = 1356 C

TGHT = 400.6 A, 6.92 V

TBHT = 233.8 A, 4.20 V

IGP1 = 1.95 e-06 Torr

Autoramping to 430 A on TGHT at 0.5 A/min


Tuesday, August 06, 2019, 14:02

OMEGA = 1447 C

TGHT= 430.9 A, 7.66V

TBHT = 233.2A, 4.2 V

IGP1= 2.01e-06 Torr

Autoramping to 440 A on TGHT at 0.5 A/min


Wednesday, August 07, 2019, 09:10

OMEGA = 1548

TGHT = 441.56 A, 8.2 V

TBHT = 233.3 A, 4.2 V

IGP1 = 6.21e-07 Torr

Manually ramping up to 1900C @ 1A/min


Wednesday, August 07, 2019, 09:43

Changed OMEGA slope to 1.09 as per eLog #434

OMEGA reads 1773 C @ TGHT 451A, 8.4V

IGP1 = 7.02 e-07


Wednesday, August 07, 2019, 10:56

OMEGA = 1903 C

TGHT = 483.5 A, 9.2V

TBHT = 233.3 A, 4.3V

IGP1 = 1.7 e-06 Torr trending down


Wednesday, August 07, 2019, 11:40

OMEGA = 1914 C

TGHT = 483.5 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.5 e-06 Torr trending down

Decrease TGHT current to 480.4 A


Wednesday, August 07, 2019, 13:04

OMEGA = 1918 C

TGHT = 480.3 A, 9.4V

TBHT = 233.3 A, 4.3V

IGP1 = 1.28e-06 Torr

Decrease TGHT current to 474.5 A


Wednesday, August 07, 2019, 13:26

OMEGA = 1904 C

TGHT = 474.8 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.11e-06 Torr


Wednesday, August 07, 2019, 13:47

OMEGA = 1912 C

TGHT = 474.8 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.10e-06 Torr

Decrease TGHT to 471.8 A

OMEGA temperature went down to 1904 C


Wednesday, August 07, 2019, 14:26

OMEGA = 1911 C

TGHT = 471.8 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.00e-06 Torr

Decrease TGHT to 469.0 A

OMEGA temperature down to 1904C


Wednesday, August 07, 2019, 15:45

OMEGA = 1912 C

TGHT = 468.8.8 A, 9.2V

TBHT = 233.3 A, 4.3V

IGP1 = 9.2e-07 Torr

Decrease TGHT to 466.0 A

OMEGA temperature down to 1903C

 


Wednesday, August 07, 2019, 22:09

OMEGA = 1924 C

TGHT = 466.8. A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 7.6e-07 Torr

Cooling at 2A/min TGHT to 456.0 A, 9.0 V and 1A/min TBHT to 230.1 A, 4.2 V

OMEGA = 1900 C

Will allow Pressure to stabilize

 


 Thursday, August 08, 2019, 06:54

OMEGA = 1919 C

TGHT = 456.9 A, 9.1V

TBHT = 230.3 A, 4.2 V

IGP1 =5.7e-07 Torr

Cooling at 2A/min TGHT and 1A/min TBHT


Thursday, August 08, 2019, 13:30

Target removed from Evap2.  Awaiting inspection by John.


 

 

    Reply  Monday, August 12, 2019, 15:55, John Wong, ZrC, 43044-6, LP-SIS, Done, Sintering ZrC Discs ZrC_43044-6_inspection.pdf

Darwin Ortiz Rosales wrote:

 
 

Tuesday, July 30, 2019, 15:33

ZrC backup Target 12.6 cm disc length, 465 g total weight (no springs and no analysis discs).

Total weight= 470 g.

20 Analysis discs weighing 2.368 g (10 at each end).

Two springs (one at each end).

OMEGA slope initially = 0.990  (was changed to 1.09 at higher Temperature as per eLog #434

Target is being pumped down.


Wednesday, July 31, 2019, 09:31

Desired temp = 1900 C, Auto ramping TGHT at  0.1 A/min to reach 400A then  TGHT will be tapped up accordingly to reach desired temperature. (eLog 434)

TBHT will be set fixed at 230A (max). TBHT at 0.1 A/min to reach 230A.

Note: Initially both TGHT and TBHT will be ramped up at 0.3A/min up to 30A each.

IGP1= 1.35e-06 Torr

Good vac at 3.00-5 Torr

Bad vac at 5.0e-5 Torr.


Wednesday, July 31, 2019, 12:02

At 30A pressure was increasing a bit fast, therefore, the ramp was changed to increments of .1A every 120s (.05A/min). 


Thursday, August 01, 2019, 08:42

TGHT = 54.7

TBHT = 54.3

IGP1 = 3.86e-5 Torr

Will changer heat ramp to .1A/min by changing wait interval to 60s


Tuesday, August 06, 2019, 07:14

OMEGA = 1212 C

TGHT = 344.7 A, 5.79 V

TBHT = 233 A, 4.17 V

IGP1 = 1.05 e-06 Torr

Autoramping to 400A at increments of 0.1A/min


Tuesday, August 06, 2019, 09:50

OMEGA = 1233 C

TGHT = 360 A, 6.05 V

TBHT = 233 A, 4.18 V

IGP1 = 1.21 e-06 Torr

increasing autoramp increments to .5A/min


Tuesday, August 06, 2019, 12:27

OMEGA = 1356 C

TGHT = 400.6 A, 6.92 V

TBHT = 233.8 A, 4.20 V

IGP1 = 1.95 e-06 Torr

Autoramping to 430 A on TGHT at 0.5 A/min


Tuesday, August 06, 2019, 14:02

OMEGA = 1447 C

TGHT= 430.9 A, 7.66V

TBHT = 233.2A, 4.2 V

IGP1= 2.01e-06 Torr

Autoramping to 440 A on TGHT at 0.5 A/min


Wednesday, August 07, 2019, 09:10

OMEGA = 1548

TGHT = 441.56 A, 8.2 V

TBHT = 233.3 A, 4.2 V

IGP1 = 6.21e-07 Torr

Manually ramping up to 1900C @ 1A/min


Wednesday, August 07, 2019, 09:43

Changed OMEGA slope to 1.09 as per eLog #434

OMEGA reads 1773 C @ TGHT 451A, 8.4V

IGP1 = 7.02 e-07


Wednesday, August 07, 2019, 10:56

OMEGA = 1903 C

TGHT = 483.5 A, 9.2V

TBHT = 233.3 A, 4.3V

IGP1 = 1.7 e-06 Torr trending down


Wednesday, August 07, 2019, 11:40

OMEGA = 1914 C

TGHT = 483.5 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.5 e-06 Torr trending down

Decrease TGHT current to 480.4 A


Wednesday, August 07, 2019, 13:04

OMEGA = 1918 C

TGHT = 480.3 A, 9.4V

TBHT = 233.3 A, 4.3V

IGP1 = 1.28e-06 Torr

Decrease TGHT current to 474.5 A


Wednesday, August 07, 2019, 13:26

OMEGA = 1904 C

TGHT = 474.8 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.11e-06 Torr


Wednesday, August 07, 2019, 13:47

OMEGA = 1912 C

TGHT = 474.8 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.10e-06 Torr

Decrease TGHT to 471.8 A

OMEGA temperature went down to 1904 C


Wednesday, August 07, 2019, 14:26

OMEGA = 1911 C

TGHT = 471.8 A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 1.00e-06 Torr

Decrease TGHT to 469.0 A

OMEGA temperature down to 1904C


Wednesday, August 07, 2019, 15:45

OMEGA = 1912 C

TGHT = 468.8.8 A, 9.2V

TBHT = 233.3 A, 4.3V

IGP1 = 9.2e-07 Torr

Decrease TGHT to 466.0 A

OMEGA temperature down to 1903C

 


Wednesday, August 07, 2019, 22:09

OMEGA = 1924 C

TGHT = 466.8. A, 9.3V

TBHT = 233.3 A, 4.3V

IGP1 = 7.6e-07 Torr

Cooling at 2A/min TGHT to 456.0 A, 9.0 V and 1A/min TBHT to 230.1 A, 4.2 V

OMEGA = 1900 C

Will allow Pressure to stabilize

 


 Thursday, August 08, 2019, 06:54

OMEGA = 1919 C

TGHT = 456.9 A, 9.1V

TBHT = 230.3 A, 4.2 V

IGP1 =5.7e-07 Torr

Cooling at 2A/min TGHT and 1A/min TBHT


Thursday, August 08, 2019, 13:30

Target removed from Evap2.  Awaiting inspection by John.


 

 

 Monday, August 12, 2019, 15:45

Visual inspection on the target was performed today.  See attachment for details.

Target container is slightly bent, and some visible crystallization on the container surface.  

The discs are nicely packed with only a slight expansion in length was measured.

No clogging inside the container nor the ionizer tube. 

Some sintered discs samples were collected and SEM will be perform later. 


 

Entry  Monday, March 18, 2019, 15:58, Darwin Ortiz Rosales, ZrC, 43044-5, LP-SIS, Done, Sintering ZrC IMG_3070.JPGIMG_3066.JPG

Monday, March 18, 2019, 15:51

Total number of foils: 555

Total mass of material including graphite foils: 478 grams

Total length packed 14.2 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate outgassing

Two TaC coated Ta wire springs inserted at either end to allow for ZrC expansion.

5 extra foils tucked beneath each spring for QC; total mass (10 discs) =1.0160 g

Desired temp = 1900 C, Auto ramping TGHT at  0.1 A/min to reach 280A A (Omega slope set = 0.990, approx 1400 C, Elog#427),  TGHT will be tapped up accordingly to reach desired temperature. 

TBHT will be set fixed at 230A (max). TBHT at 0.1 A/min to reach 230A.

Good vac at 3.00-5 Torr

Bad vac at 5.0e-5 Torr.

Currently being pumped down.


 Tuesday, March 19, 2019, 08:57

Current pressure IGP1 = 5.24e-07 Torr

Manually tapping to 40A on TBHT and TGHT

At 20 A IGP1 pressure trending up.  Will leave at 20A until trending down.

Pressure @ 20 A set, peaked ~1.8e-06 Torr after 1 hour


Tuesday, March 19, 2019, 10:32

Tapping manually to 50 A on TBHT and TGHT while monitoring IGP1 pressure

Tapped to 25 A and IGP1 pressure trending up.  Will allow to stabilize.

Tuesday, March 19, 2019, 11:34

Pressure stabilized at ~3.25e-06 Torr

Tapped up to 30 A on both TGHT and TBHT

Pressure stabilized at ~6.6e-06

Tapped up to 34A on both TGHT and TBHT

Pressure stabilized at ~1.2e-05 Will allow to drop before proceeding


 Tuesday, March 19, 2019, 13:43

Tapped up to 40A waiting for pressure to stabilize

Pressure shot up ~8.5e-05, therefore tapped down TGHT to 35A (At 35A TGHT current value fluctuates, probably better to ramp up to 36A)

Will let pressure drop before proceeding with TGHT heating

Ramped TGHT to 36A, IGP1 pressure still trending down and current measurements stable.

 Starting autoramp at 0.3A/min for both TGHT and TBHT until 280A and 230A respectively

Initial TGHT Current: 33.6A, 0.05V

Initial TBHT Current: 38.6A, 0.48V

IGP1 = 4.9e-05 Torr


Wednesday, March 20, 2019, 09:41

 TGHT has only ramped to 45.7 A, 0.085V

TBHT has only ramped to 50.2A, 0.62V

IGPI pressure ~4.0 e-5 Torr

Stopping ramp and monitoring pressure to see if it drops appropriate levels.

 


Wednesday, March 20, 2019, 14:10  

IGP1 pressure = 7.6e-06 Torr

TGHT 47.7Z, 0.16V

TBHT 50.1A, 0.63V

Autoramp at 0.1A/min both TGHT and TBHT to 280A and 230A respectively.


 Thursday, March 21, 2019, 08:12

IGP1 = 3.1e-05 Torr

TGHT = 51.4 A, 0.18V

TBHT=61.9A, 0.87V

Stopped autoramp

Manually ramping TGHT and TBHT while monitoring pressure

 Rampted up TGHT to 54A (reading 65 A), 0.5V and TBHT to 68A, 0.9V

Allowing pressure to stabilize


Manually tapped TGHT to 80A, .81V

Manually tapped TBHT to 90A, 1.3V

IGP1 = .0002 Torr

Will leave over night to allow pressure to drop


Friday, March 22, 2019, 08:17

IGP1 = 6.6e-06

TGHT = 88.8A, 0.81V

TBHT = 90.1A, 1.3V

Will manually tap ~100A on both TBHT and TGHT

Friday, March 22, 2019, 12:18

IGP1 = 1.28e-05 Torr

TGHT = 100.9A, 1.0V

TBHT = 101.2A, 1.5V

will allow pressure to drop slightly the autoramp at 0.1A/min for both TGHT and TBHT until 280A and 230A respectively


Friday, March 22, 2019, 14:51

IGP1= 7.4 e-06 Torr

TGHT = 100.8A, 1.0V

TBHT= 101.5A, 1.5V

Started autoramp at 0.1A/min for both TGHT and TBHT until 280A and 230A respectively


Tuesday, March 26, 2019, 08:18

IGP1 oscillated around ramping trip point 3.0e-05 while current slowly ramped to 280A (reached sometime during the night).

IGP1= 7.8e-06 Torr

TGHT= 283.4A, 4.2V

TBHT= 233.1A, 4.1V

Will continue ramp TGHT @0.2A/min up to 400A  (Omega slope set = 0.990, approx 1800 C, Elog#427)


Wednesday, March 27, 2019, 09:39

Target has been at 400A, OMEGA ~1400C since ~7pm of previous evening

TGHT = 400.2A, 6.45V

TBHT= 233.1A, 4.16V

IGP1= 3.1e-07 Torr

Autoramp TGHT to440A @0.2A/min

 Stopped autoramp at TGHT = 427.4 A and 7.00V, OMEGA= 1492 C

Wednesday, March 27, 2019, 14:14

Restarted TGHT autoramp @.2A/min up to 440A


Friday, March 29, 2019, 12:06

Changed OMEGA slope to 1.09 after checking with the analog pyrometer

IGP1 = 1.65e-07 Torr

TGHT = 441.3A, 7.5V

TBHT= 233.0A, 4.2V

Tapping TGHT to 450A @ ~1A/min while monitoring pressure

TGHT remained at 451A, 7.8 V  and  TBHT at 233.2A, 4.2 V,  for 10.5 hours while OMEGA Temperature ~1810 C.

Ramp-down was initiated with IGP1 = 1.7e-07 Torr

Ramp rate = 2A/min for TGHT and 1/min for TBHT


 Monday, April 01, 2019, 08:53

TGHT = 0A, 0.05V

TBHT= 0.01A, 0V

IGP1= 4.05e-08 Torr

Unloading Target


Target Final weight = 473 g

% Mass of ZrC+C+organics lost = 14.20 % compared to 13.95% theoretical organics content.

Final weight of 10 discs = 0.9250 g

% mass lost on this discs = 13.66%

The tube was slightly bent along the short axis

The discs expanded but more towards one side (possibly due to discrepancy in spring strength).

 One protective graphite disc added to each end

One end cap on each end

    Reply  Wednesday, March 26, 2014, 18:23, John Wong, TiC, 38817-8, HP-SIS, Done, Sintering TiC#4 

Laura Lambert wrote:

John Wong wrote:

 Friday, March 21, 2014, 16:09

Target container is loaded with 360 Discs of TiC.  

Target length = 11.7cm.  

Total green mass = 40.945g 

Container is wrapped with 3 Ta-heat shields, and have been pumped down in the chamber. 

For the sintering process: 

TGHT ramp up to 820A, and TGHT to 300A at 0.1A/min. 


Friday, March 21, 2014, 16:15

TGHT/TBHT were manually stepped up to 40A.  

Vac stabilizes at 1.7e-6 Torr.  

Initiate auto-ramping... 


 

 Wednesday, March 26, 2014, 11:05

TBHT reached max desired current of 300A

IGP1 = 1.4e-6 Torr

TGHT = 543A

Increasing TGHT auto-ramp to 2.0A/min


 

 Wednesday, March 26, 2014, 18:18

TGHT has reached to 820A\13.4V and target has been heated at that current for 4.5 hours.

Vac is coming down to 1.1e-6 Torr.

See link for RGA results: https://www.dropbox.com/sh/08dcxskux21aqap/1SF_dTJB4l

Cooling down in process at 2A/min for TGHT and 1A/min for TBHT.


 Thursday, March 27, 2014, 11:14

Target is cooled down.  TGHT/TBHT have reached to 0A. 

All pumps off; chamber will be vented soon. 


 Friday, March 28, 2014, 15:00

Target has been assembled.  Heat shield WO#39956-10


 

Entry  Tuesday, October 16, 2012, 14:18, John Wong, TiC, 39165-4, LP-SIS, Done, Sintering TiC#3 TiC#3_maxcurrent.PNG

Tuesday, October 16, 2012, 14:12

Target is filled with 360 discs of TiC (with 1 mole of graphite) backed on C-grv foil.  

No Ta heat-shields wrapped around the container.

One regular end-cap is inserted and expanded.  The other end is inserted with a D-cap for out-gassing.

Re ionizer foil is inserted.

TGHT will be ramped up to 580A, TBHT to 230A; ramping rate at 0.2A/min.

Chamber is currently being pumped down...


 Tuesday, October 16, 2012, 16:11

HS water valve is opened.  No leaks is detected.

Vacuum is coming down steadily.  IGP1 currently at 1.7e-5 Torr.


 Wednesday, October 17, 2012, 11:41

The chamber was pumped down overnight.  IGP1 reads at 5.8e-7 Torr.

Both TGHT & TBHT were stepped up to 30A. P/S OK! 

Initiated auto-ramping...


Monday, October 22, 2012, 10:58

TGHT and TBHT have reached to 580A & 230A, respectively (see attachment#1).

IGP1 currently at 6.27e-6 Torr.  BP@20mTorr.

Currents will remain at max for another 3 hours. 

Local temperature measured at 1500C (container surface), 1300C (center block)


 Monday, October 22, 2012, 17:27

Auto cooling initiated.


 Tuesday, October 23, 2012, 17:54

TGHT & TBHT are at 0A.  P/S & pumps off. 

The chamber will be vented, and the target will be taken out for inspections.


 

Entry  Friday, March 21, 2014, 16:18, John Wong, TiC, 38817-8, HP-SIS, In progress, Sintering TiC  

 Friday, March 21, 2014, 16:09

Target container is loaded with 360 Discs of TiC.  

Target length = 11.7cm.  

Total green mass = 40.945g 

Container is wrapped with 3 Ta-heat shields, and have been pumped down in the chamber. 

For the sintering process: 

TGHT ramp up to 820A, and TGHT to 300A at 0.1A/min. 


Friday, March 21, 2014, 16:15

TGHT/TBHT were manually stepped up to 40A.  

Vac stabilizes at 1.7e-6 Torr.  

Initiate auto-ramping... 


 

    Reply  Wednesday, March 26, 2014, 11:07, Laura Lambert, TiC, 38817-8, HP-SIS, In progress, Sintering TiC  

John Wong wrote:

 Friday, March 21, 2014, 16:09

Target container is loaded with 360 Discs of TiC.  

Target length = 11.7cm.  

Total green mass = 40.945g 

Container is wrapped with 3 Ta-heat shields, and have been pumped down in the chamber. 

For the sintering process: 

TGHT ramp up to 820A, and TGHT to 300A at 0.1A/min. 


Friday, March 21, 2014, 16:15

TGHT/TBHT were manually stepped up to 40A.  

Vac stabilizes at 1.7e-6 Torr.  

Initiate auto-ramping... 


 

 Wednesday, March 26, 2014, 11:05

TBHT reached max desired current of 300A

IGP1 = 1.4e-6 Torr

TGHT = 543A

Increasing TGHT auto-ramp to 2.0A/min


 

    Reply  Monday, October 26, 2015, 16:14, Laura Lambert, Empty, 41077-3, LP-SIS, Done, Sintering TaC on LPSIS (small block) container & temp measurements with 1xTa h.s temp_measurements_on_sintering_TaC_on_LPSIS_(small_block)_container.xlsx

John Wong wrote:

Laura Lambert wrote:

John Wong wrote:

 Wednesday, October 21, 2015, 17:35

This container is prepared for a backup UCx target (otherwise it will be used for development purposes).

The container is coated with TaC; one layer of Ta-heat shield is used. 

TGHT will be ramped up to reach 1900C (previous container had TGHT ramped up to 440A).  

TBHT will be ramped up to max 230A.  

Chamber is currently being pumped down.  

Heating can begin once the vacuum is good, currently at 4.8e-5 Torr. 


 

 Thursday, October 22, 2015, 11:36

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

Vacuum stabilized, initiated auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Final setpoints TGHT = 300A, TBHT = 230A

IGP1 = 1.0e-6 Torr; TGHT = 45.18A, 0.17V; TBHT = 38.4A, 0.41V


 

 Thursday, October 22, 2015, 17:09

Pressure coming down to 1.5e-6 Torr. 

Increased ramping rate to 2A/min for both TGHT and TBHT.


 

 Monday, October 26, 2015, 16:10

Target container was ramped down over the weekend and taken out today.

Coating looks good.

Will add on another Ta layer and continue with temperature measurements.

See attachment for raw data.


 

Entry  Wednesday, October 21, 2015, 17:39, John Wong, Empty, 41077-3, LP-SIS, In progress, Sintering TaC on LPSIS (small block) container 

 Wednesday, October 21, 2015, 17:35

This container is prepared for a backup UCx target (otherwise it will be used for development purposes).

The container is coated with TaC; one layer of Ta-heat shield is used. 

TGHT will be ramped up to reach 1900C (previous container had TGHT ramped up to 440A).  

TBHT will be ramped up to max 230A.  

Chamber is currently being pumped down.  

Heating can begin once the vacuum is good, currently at 4.8e-5 Torr. 


 Friday, October 23, 2015, 16:15

TGHT reached to 500A and temp measured at 1940C.  More about the temp plot can be found in the dropbox.

Initiated cooling down at 2A/min. 

Target will be inspected next Monday.


 

    Reply  Thursday, October 22, 2015, 11:41, Laura Lambert, Empty, 41077-3, LP-SIS, In progress, Sintering TaC on LPSIS (small block) container 

John Wong wrote:

 Wednesday, October 21, 2015, 17:35

This container is prepared for a backup UCx target (otherwise it will be used for development purposes).

The container is coated with TaC; one layer of Ta-heat shield is used. 

TGHT will be ramped up to reach 1900C (previous container had TGHT ramped up to 440A).  

TBHT will be ramped up to max 230A.  

Chamber is currently being pumped down.  

Heating can begin once the vacuum is good, currently at 4.8e-5 Torr. 


 

 Thursday, October 22, 2015, 11:36

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

Vacuum stabilized, initiated auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Final setpoints TGHT = 300A, TBHT = 230A

IGP1 = 1.0e-6 Torr; TGHT = 45.18A, 0.17V; TBHT = 38.4A, 0.41V


 

    Reply  Thursday, October 22, 2015, 17:10, John Wong, Empty, 41077-3, LP-SIS, In progress, Sintering TaC on LPSIS (small block) container 

Laura Lambert wrote:

John Wong wrote:

 Wednesday, October 21, 2015, 17:35

This container is prepared for a backup UCx target (otherwise it will be used for development purposes).

The container is coated with TaC; one layer of Ta-heat shield is used. 

TGHT will be ramped up to reach 1900C (previous container had TGHT ramped up to 440A).  

TBHT will be ramped up to max 230A.  

Chamber is currently being pumped down.  

Heating can begin once the vacuum is good, currently at 4.8e-5 Torr. 


 

 Thursday, October 22, 2015, 11:36

HS water valves opened, no leaks detected.

Tapped up manually to 35A.

Vacuum stabilized, initiated auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Final setpoints TGHT = 300A, TBHT = 230A

IGP1 = 1.0e-6 Torr; TGHT = 45.18A, 0.17V; TBHT = 38.4A, 0.41V


 

 Thursday, October 22, 2015, 17:09

Pressure coming down to 1.5e-6 Torr. 

Increased ramping rate to 2A/min for both TGHT and TBHT.


 

Entry  Monday, February 18, 2013, 16:43, John Wong, Empty, , LP-SIS, Done, Sintering TaC coating on the RFQ target container SiC#28_-_LPSIS-RFQ.pngSintering_of_TaC.PNGautorampingdown_10.PNG

 Monday, February 18, 2013, 16:28

The RFQ target container is coated with TaC and ready to be sintered.  No Ta-heat shields are used.  This container will be used for the SiC#28-LPSIS-RFQ. 

Two thermocouples are welded on the container:  One on the end cap and the other on the back block (see attachment#1)

The target will be heated to at least  TGHT at 580A and TBHT at 300A; the vacuum and gasses will be monitored.  

The chamber is currently being pumped down...  


 Friday, February 22, 2013, 14:24

The gasses were analyzed with the RGA:

TGHT @ 520A, TBHT @ 300A:  Mass 28 (CO) reached to max current of ~5pA before the current started to decrease, (see attachment #2).  This could be the indication of the material(s) in the target container was "sort of" fully reduced. 

TGHT was further ramped up  to 600A and heated for a few hours.  The temperature on the end was measured at 1252C and the center block was at 1580C.  (see attachment #3).

The container was successfully sintered with TaC. 


 

 

Entry  Tuesday, November 21, 2017, 13:55, Laura Lambert, Empty, 41882-4, TARGET BOAT, Done, Sintering TaC coating on fully enclosed target boat for graphite test 

 Tuesday, November 21, 2017, 12:01

Boat coated with TaC using 'flushing technique' and let dry overnight.

Wrapped with 1 long Ta heat shield 3x

Loaded into evap2 just before lunch

IGP1 = 7.1e-6 Torr

OMEGA slope = 0.98

Good vac at 3.0e-4, bad vac at 8.0e-4 Torr.

HS water valves have remained open since the last time evap2 was used.

No leak check done.

Tapped up manually to 35A.

Waited ~25min

Vacuum stable.

IGP1 = 1.15e-5 Torr

IGP2 = 1.17e-5 Torr

Initiating auto ramp for TGHT @ 0.2A/min to a max setpoint of 300A

Once max setpoints achieved, will tap up manually to final desired temperature of 1900C


 Wednesday, November 22, 2017, 09:32

TGHT = 270A, 4.15V

OMEGA = 1285C

IGP1 = 1.23e-6 Torr

IGP2 = 1.13e-6 Torr

Vacuum stable.

Increasing ramping rate to 1.0A/min and final setpoint to 350A


 Wednesday, November 22, 2017, 10:25

TGHT = 325A, 5.15V

OMEGA = 1500C

IGP1 = 2.80e-6 Torr

IGP2 = 2.93e-6 Torr

Vacuum stable.

Increasing ramping rate to 1.5A/min and final setpoint to 400A


 Wednesday, November 22, 2017, 10:49

TGHT = 350A, 5.60V

OMEGA = 1580C

IGP1 = 4.5e-6 Torr

IGP2 = 4.9e-6 Torr

Vacuum stable.

Increasing ramping rate to 2.0A/min


 Wednesday, November 22, 2017, 11:18

TGHT = 400A, 6.64V

OMEGA = 1734C

IGP1 = 5.8e-6 Torr

IGP2 = 6.2e-6 Torr

Vacuum stable.

Increasing final setpoint to 450A.


 Wednesday, November 22, 2017, 15:59

TGHT = 460A, 8.07V

OMEGA = 1898C

IGP1 = 1.34e-6 Torr

IGP2 = 1.27e-6 Torr

Sintering process complete.

Remained at max setpoints for just over 4hrs.

Initiating auto-cool at 2.0A/min.


 Thursday, November 23, 2017, 13:09

Removed from evap2 this morning.

Coating looks good.


 

Entry  Wednesday, April 05, 2017, 15:42, Laura Lambert, Empty, , TARGET BOAT, In progress, Sintering TaC coating on evap1 target boat 

 Wednesday, April 05, 2017, 15:36

Coated container with TaC coating using spray technique this morning and let dry.

Wrapped with one long layer of Ta heat shield, wrapped around boat 3x

No ends to target boat

Installed in evap2 and pumping down now...


 