Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 13 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subjectdown Text Attachments
  317   Wednesday, August 24, 2016, 17:07 John WongSiC39814-V2-1LP-IG-LISDoneSintering process for SiC#34 (2nd round) Wednesday, August 24, 2016, 17:05
Target container was previously coated
with TaC and sintered up to 1900C at 420A/7.01V
 10x 
  526   Monday, February 01, 2021, 13:57 Darwin Ortiz RosalesSiC40282-4TARGET BOATDoneSintering of SiC discs for SEMMonday, February 01, 2021, 13:52  
  
  77   Monday, June 17, 2013, 16:59 Laura LambertSiC38481-6HP-FEBIADDoneSintering of SiC #29Monday, June 17, 2013, 16:57
Target is loaded with 510 SiC discs
Container was previously coated with
  
  78   Tuesday, June 18, 2013, 16:40 John WongSiC38481-6HP-FEBIADDoneSintering of SiC #29

    

       
            
  
  11   Thursday, March 29, 2012, 19:30 Nikita BernierBeOTarget boat #1 DoneSintering new BeO pellets Thursday, March 29, 2012, 19:17
 
  
  12   Thursday, March 29, 2012, 22:44 John WongBeOTarget boat #1 DoneSintering new BeO pellets

    

       
            
 Parameter.jpg 
  13   Friday, March 30, 2012, 23:21 John WongBeOTarget boat #1 DoneSintering new BeO pellets

    

       
            
 archive_24hr.jpgTGHT@240A.jpgTGHT@700A.jpgTGHT@750A.jpgTGHT@0A.jpg 
  14   Monday, April 02, 2012, 16:26 Nikita BernierBeOTarget boat #1 DoneSintering new BeO pellets

    

       
            
  
  188   Friday, May 01, 2015, 10:50 Laura Lambert 40282-4TARGET BOATIn progressSintering four different ZrC samples Friday, May 01, 2015, 10:27
Four different samples of ZrC are
loaded into a target boat.
 1.jpg2015-04-30_15.24.57.jpg 
  189   Monday, May 04, 2015, 17:26 John Wong 40282-4TARGET BOATIn progressSintering four different ZrC samples

    

       
            
  
  191   Friday, May 08, 2015, 15:56 Laura Lambert 40282-4TARGET BOATDoneSintering four different ZrC samples

    

       
            
 evap2_data_from_four_samples.xlsx 
  90   Thursday, September 26, 2013, 15:17 John WongEmpty39814-VI-?LP-IG-LISDoneSintering empty target oven coated with TaC for UCx#8Thursday, September 26, 2013, 13:04
The LP-IG-LIS target container is
coated with TaC. 
 UCx#8_container_TaC_coat_sintering.PNG 
  79   Monday, July 22, 2013, 15:03 John WongEmpty38634-7LP-SISDoneSintering empty target oven coated with TaC for UCx#7Monday, July 22, 2013, 15:00
Target container is coated with TaC
- this container will be used for UCx#7.
  
  223   Thursday, June 25, 2015, 16:20 Laura LambertZrC41177-2LP-SISIn progressSintering back-up ZrC Thursday, June 25, 2015, 16:14
Total number of foils: 422 discs
  
  224   Monday, June 29, 2015, 07:05 John WongZrC41177-2LP-SISDoneSintering back-up ZrC

    

       
            
 Screen_Shot_2015-06-29_at_7.14.12_AM.png 
  145   Monday, July 28, 2014, 15:06 Laura Lambert 40282-3LP-SISIn progressSintering ZrC# 6 target Monday, July 28, 2014, 14:41
Total number of foils: 445 discs
Total mass of materials [incl graphite
  
  146   Tuesday, July 29, 2014, 11:23 John Wong 40282-3LP-SISIn progressSintering ZrC# 6 target

    

       
            
  
  452   Tuesday, July 30, 2019, 15:42 Darwin Ortiz RosalesZrC43044-6LP-SISDoneSintering ZrC Discs 
 
Tuesday,
July 30, 2019, 15:33
ZrC backup Target 12.6 cm disc length,
  
  453   Monday, August 12, 2019, 15:55 John WongZrC43044-6LP-SISDoneSintering ZrC Discs


   
        
            
 ZrC_43044-6_inspection.pdf 
  434   Monday, March 18, 2019, 15:58 Darwin Ortiz RosalesZrC43044-5LP-SISDoneSintering ZrCMonday, March 18, 2019, 15:51
Total number of foils: 555
Total mass of material including
 IMG_3070.JPGIMG_3066.JPG 
ELOG V2.9.2-2455