ID Date Author Target Materialdown Target Oven W.O# Source Status Subject Text Attachments
  187   Thursday, April 23, 2015, 10:17 John WongSiC38817-7HP-SISDoneSintering SiC#31

    

       
            
 Screen_Shot_2015-04-23_at_3.04.01_PM.png 
  221   Tuesday, June 23, 2015, 12:26 John WongSiC38817-6HP-SISIn progressRUSH! SiC backup target undergoes sintering processTuesday, June 23, 2015, 12:21
Target container is loaded with 485
discs of SiC with packed length of 17.4cm. 
  
  222   Thursday, June 25, 2015, 16:13 Laura LambertSiC38817-6HP-SISDoneRUSH! SiC backup target undergoes sintering process

    

       
            
 IMG_20150625_152233125.jpgIMG_20150625_152256456.jpg 
  243   Tuesday, September 01, 2015, 17:20 John WongSiC39530-5HP-FEBIADIn progressSintering SiC#32Tuesday, September 01, 2015, 17:16
Target container contains 533 discs
of SiC with packed length of 17cm. 
  
  244   Wednesday, September 02, 2015, 11:28 Laura LambertSiC39530-5HP-FEBIADIn progressSintering SiC#32

    

       
            
 Screenshot-1stsintering-prewindow_coating.JPG 
  245   Tuesday, September 08, 2015, 15:56 John WongSiC39530-5HP-FEBIADIn progressSintering SiC#32

    

       
            
 SiC#33_HPFEBIAD_temp.PNGSiC#33_HPFEBIAD_temp.xlsxleft_window.JPGleft_window_1.JPG 
  246   Wednesday, September 09, 2015, 18:24 John WongSiC39530-5HP-FEBIADIn progressRe-conditioning SiC#32

    

       
            
 Screen_Shot_2015-09-09_at_5.53.15_PM.png 
  247   Thursday, September 10, 2015, 09:58 Laura LambertSiC39530-5HP-FEBIADIn progressRe-conditioning SiC#32

    

       
            
  
  248   Thursday, September 10, 2015, 12:05 John WongSiC39530-5HP-FEBIADDoneRe-conditioning SiC#32

    

       
            
 Screen_Shot_2015-09-15_at_12.37.19_PM.pngScreen_Shot_2015-09-18_at_9.10.13_AM.pngScreen_Shot_2015-09-24_at_11.30.25_AM.png 
  262   Tuesday, November 10, 2015, 14:34 Laura LambertSiC41077-3LP-SISDonetemp measurements with 3xTa h.s on LPSIS (small block) container with SiC Tuesday, November 10, 2015, 14:20
Container previously sintered
 Evernote_Camera_Roll_20151110_110128.jpgEvernote_Camera_Roll_20151110_110129.jpgstriptool_screenshot_above_1700C.JPGtemp_measurements_on_LPSIS_(small_block)_container.xlsx 
  270   Monday, January 11, 2016, 15:47 Laura LambertSiC41077-3LP-SISDoneConditioning SiC test target for test stand measurementsMonday, January 11, 2016, 15:25
Small center block LP-SIS
 Photo_2016-0-13.jpgPhoto_2016-01-13_#2.jpgPhoto_2016-01-13_#3.jpgPhoto_2016-01-13_#4.jpg 
  287   Thursday, March 24, 2016, 12:05 John WongSiC TARGET BOATDoneTest#3: E-spin SiC with PANThursday, March 24, 2016, 11:37  
SiC powder (<1um) [10%] was mixed
with PAN solution [10%].  Solution was
 Screen_Shot_2016-03-26_at_3.39.35_PM.pngTGHT_faulty.PNG 
  289   Thursday, April 07, 2016, 15:23 John WongSiC TARGET BOATDoneE-spun SiC/PAN thermal treatment Thursday, April 07, 2016, 15:18
E-spun SiC/PAN fiber mats were produced
at UBC.
 SiC_PAN_1400c.PNGarchiver.PNG 
  297   Thursday, May 19, 2016, 14:38 John WongSiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) target discs The purpose of this experiment is to
determined the limiting operating temperature
for Beta-SiC.  To do so, samples will
  
  298   Friday, May 20, 2016, 08:54 Laura LambertSiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) target discs

    

       
            
  
  299   Tuesday, May 24, 2016, 11:18 John WongSiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) target discs

    

       
            
  
  302   Thursday, June 09, 2016, 15:48 Laura LambertSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target! Thursday, June 09, 2016, 15:39
First target using beta-SiC material!
 target_with_end-coils.jpg 
  303   Friday, June 10, 2016, 16:30 John WongSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target! 

  
  304   Monday, June 13, 2016, 09:53 Laura LambertSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target!

    

       
            
 current_vs_voltage_vs_temp.xlsxTapping_up_from_520A_to_1800C.JPG 
  305   Wednesday, June 15, 2016, 17:58 John WongSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target!

    

       
            
  