284
|
Monday, March 21, 2016, 18:57 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
Laura Lambert wrote: |
Aurelia Laxdal wrote: |
Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).
|
Monday, March 14, 2016, 09:20
One thermocouple was not welded on correctly and is not working.
Cooling evap2 back down, to remove target and re-weld thermocouple.
Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.
|
Monday, March 14, 2016, 13:12: Stopped turbo pump
|
After EVAP2 was vented the thermocouple problem was fixed: it was the wire at on connector inside the box not making proper contact. The lid of the heat shield was also replaced since the one initially mounted had no holes, so one couldn't see the center block. Restarted pumping down at 4:30pm. Just started again the autoramp program: TGHT set to 300A (for the time being) and TBHT to 230A. Temperature measurements will resume tomorrow morning.
|
Raised the TGHT at 620A. The TBHT was already set at 230A. The temperature is at 1902 deg C. As per John's instructions the target will condition at these setpoints over the week-end.
|
Today, lowered the TGHT from 620A (at 1894 deg C) to 300A. TBHT is still at 230A. |
285
|
Tuesday, March 22, 2016, 11:31 |
Aurelia Laxdal | Ta | 41790-1 | LP-SIS | In progress | Ta#47 LP-SIS (with new center block) conditioning |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
Laura Lambert wrote: |
Aurelia Laxdal wrote: |
Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).
|
Monday, March 14, 2016, 09:20
One thermocouple was not welded on correctly and is not working.
Cooling evap2 back down, to remove target and re-weld thermocouple.
Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.
|
Monday, March 14, 2016, 13:12: Stopped turbo pump
|
After EVAP2 was vented the thermocouple problem was fixed: it was the wire at on connector inside the box not making proper contact. The lid of the heat shield was also replaced since the one initially mounted had no holes, so one couldn't see the center block. Restarted pumping down at 4:30pm. Just started again the autoramp program: TGHT set to 300A (for the time being) and TBHT to 230A. Temperature measurements will resume tomorrow morning.
|
Raised the TGHT at 620A. The TBHT was already set at 230A. The temperature is at 1902 deg C. As per John's instructions the target will condition at these setpoints over the week-end.
|
Today, lowered the TGHT from 620A (at 1894 deg C) to 300A. TBHT is still at 230A.
|
Cooling down the target.
|
286
|
Thursday, March 24, 2016, 11:32 |
John Wong | Ta | 41790-1 | LP-SIS | Done | Ta#47 LP-SIS (with new center block) conditioning |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
Laura Lambert wrote: |
Aurelia Laxdal wrote: |
Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).
|
Monday, March 14, 2016, 09:20
One thermocouple was not welded on correctly and is not working.
Cooling evap2 back down, to remove target and re-weld thermocouple.
Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.
|
Monday, March 14, 2016, 13:12: Stopped turbo pump
|
After EVAP2 was vented the thermocouple problem was fixed: it was the wire at on connector inside the box not making proper contact. The lid of the heat shield was also replaced since the one initially mounted had no holes, so one couldn't see the center block. Restarted pumping down at 4:30pm. Just started again the autoramp program: TGHT set to 300A (for the time being) and TBHT to 230A. Temperature measurements will resume tomorrow morning.
|
Raised the TGHT at 620A. The TBHT was already set at 230A. The temperature is at 1902 deg C. As per John's instructions the target will condition at these setpoints over the week-end.
|
Today, lowered the TGHT from 620A (at 1894 deg C) to 300A. TBHT is still at 230A.
|
Cooling down the target.
|
Thursday, March 24, 2016, 11:29
Target was removed from the Evaporator.
The thermocouples broke off.
Need to insert Re foil prior to installing
|
290
|
Tuesday, April 19, 2016, 09:28 |
Anders Mjos | Ta | 41790-1 | LP-SIS | Done | Ta#47 LP-SIS (with new center block) conditioning |
John Wong wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Aurelia Laxdal wrote: |
Anders Mjos wrote: |
Laura Lambert wrote: |
Aurelia Laxdal wrote: |
Started Ta#47 heating at Evap2 using the autoramp program. The TGHT current is setup to go to 300A (for now) and the TBHT to 230A (final value).
|
Monday, March 14, 2016, 09:20
One thermocouple was not welded on correctly and is not working.
Cooling evap2 back down, to remove target and re-weld thermocouple.
Once thermocouple replaced, will ramp back up and continue with tests/ conditioning of target.
|
Monday, March 14, 2016, 13:12: Stopped turbo pump
|
After EVAP2 was vented the thermocouple problem was fixed: it was the wire at on connector inside the box not making proper contact. The lid of the heat shield was also replaced since the one initially mounted had no holes, so one couldn't see the center block. Restarted pumping down at 4:30pm. Just started again the autoramp program: TGHT set to 300A (for the time being) and TBHT to 230A. Temperature measurements will resume tomorrow morning.
|
Raised the TGHT at 620A. The TBHT was already set at 230A. The temperature is at 1902 deg C. As per John's instructions the target will condition at these setpoints over the week-end.
|
Today, lowered the TGHT from 620A (at 1894 deg C) to 300A. TBHT is still at 230A.
|
Cooling down the target.
|
Thursday, March 24, 2016, 11:29
Target was removed from the Evaporator.
The thermocouples broke off.
Need to insert Re foil prior to installing
|
Tuesday, April 19, 2016, 09:28: Uploaded thermoucouple data. |
Attachment 1: 2016-03-11_Evaporator_2.4ch
|
°C Date Time T1 - C T2 - C T3 - C T4 - C
1 2016/03/11 14:25:25 21.1 24.7
2 2016/03/11 14:25:55 25.0 24.8
3 2016/03/11 14:26:25 21.6 - - -
4 2016/03/11 14:26:55 21.0 - - -
5 2016/03/11 14:27:25 21.3 - - -
6 2016/03/11 14:27:55 21.1 - - -
7 2016/03/11 14:28:25 21.1 - - -
8 2016/03/11 14:28:55 21.0 - - -
9 2016/03/11 14:29:25 21.1 - - -
10 2016/03/11 14:29:55 21.1 - - -
11 2016/03/11 14:30:25 21.1 - - -
12 2016/03/11 14:30:55 21.1 - - -
13 2016/03/11 14:31:25 21.1 - - -
14 2016/03/11 14:31:55 21.1 - - -
15 2016/03/11 14:32:25 21.1 - - -
16 2016/03/11 14:32:55 21.1 - - -
17 2016/03/11 14:33:25 20.0 - - -
18 2016/03/11 14:33:55 20.2 - - -
19 2016/03/11 14:34:25 20.8 - - -
20 2016/03/11 14:34:55 20.8 - - -
21 2016/03/11 14:35:25 21.1 - - -
22 2016/03/11 14:35:55 19.7 - - -
23 2016/03/11 14:36:25 20.8 - - -
24 2016/03/11 14:36:55 20.7 - - -
25 2016/03/11 14:37:25 21.3 - - -
26 2016/03/11 14:37:55 21.1 - - -
27 2016/03/11 14:38:25 21.2 - - -
28 2016/03/11 14:38:55 20.2 - - -
29 2016/03/11 14:39:25 20.7 - - -
30 2016/03/11 14:39:55 20.8 - - -
31 2016/03/11 14:40:25 21.3 - - -
32 2016/03/11 14:40:55 19.7 - - -
33 2016/03/11 14:41:25 20.8 - - -
34 2016/03/11 14:41:55 20.8 - - -
35 2016/03/11 14:42:25 20.8 - - -
36 2016/03/11 14:42:55 20.8 - - -
37 2016/03/11 14:43:25 20.8 - - -
38 2016/03/11 14:43:55 20.8 - - -
39 2016/03/11 14:44:25 20.8 - - -
40 2016/03/11 14:44:55 20.2 - - -
41 2016/03/11 14:45:25 20.8 - - -
42 2016/03/11 14:45:55 21.3 - - -
43 2016/03/11 14:46:25 20.8 - - -
44 2016/03/11 14:46:55 20.4 - - -
45 2016/03/11 14:47:25 20.8 - - -
46 2016/03/11 14:47:55 20.8 - - -
47 2016/03/11 14:48:25 20.8 - - -
48 2016/03/11 14:48:55 20.3 - - -
49 2016/03/11 14:49:25 20.4 - - -
50 2016/03/11 14:49:55 19.9 - - -
51 2016/03/11 14:50:25 20.4 - - -
52 2016/03/11 14:50:55 20.8 - - -
53 2016/03/11 14:51:25 20.5 - - -
54 2016/03/11 14:51:55 20.4 - - -
55 2016/03/11 14:52:25 20.5 - - -
56 2016/03/11 14:52:55 20.4 - - -
57 2016/03/11 14:53:25 20.8 - - -
58 2016/03/11 14:53:55 20.8 - - -
59 2016/03/11 14:54:25 20.3 - - -
60 2016/03/11 14:54:55 19.8 - - -
61 2016/03/11 14:55:25 20.3 - - -
62 2016/03/11 14:55:55 20.4 - - -
63 2016/03/11 14:56:25 21.3 - - -
64 2016/03/11 14:56:55 21.3 - - -
65 2016/03/11 14:57:25 20.5 - - -
66 2016/03/11 14:57:55 21.3 - - -
67 2016/03/11 14:58:25 21.3 - - -
68 2016/03/11 14:58:55 20.4 - - -
69 2016/03/11 14:59:25 20.0 - - -
70 2016/03/11 14:59:55 20.4 - - -
71 2016/03/11 15:00:25 19.8 - - -
72 2016/03/11 15:00:55 19.8 - - -
73 2016/03/11 15:01:25 19.8 - - -
74 2016/03/11 15:01:55 20.4 - - -
75 2016/03/11 15:02:25 20.4 - - -
76 2016/03/11 15:02:55 20.3 - - -
77 2016/03/11 15:03:25 21.2 - - -
78 2016/03/11 15:03:55 20.0 - - -
79 2016/03/11 15:04:25 21.0 - - -
80 2016/03/11 15:04:55 20.5 - - -
81 2016/03/11 15:05:25 20.0 - - -
82 2016/03/11 15:05:55 20.5 - - -
83 2016/03/11 15:06:25 20.5 - - -
84 2016/03/11 15:06:55 21.4 - - -
85 2016/03/11 15:07:25 21.4 - - -
86 2016/03/11 15:07:55 20.5 - - -
87 2016/03/11 15:08:25 20.5 - - -
88 2016/03/11 15:08:55 20.5 - - -
89 2016/03/11 15:09:25 21.4 - - -
90 2016/03/11 15:09:55 20.5 - - -
91 2016/03/11 15:10:25 21.0 - - -
92 2016/03/11 15:10:55 21.0 - - -
93 2016/03/11 15:11:25 20.0 - - -
94 2016/03/11 15:11:55 21.0 - - -
95 2016/03/11 15:12:25 21.0 - - -
96 2016/03/11 15:12:55 20.5 - - -
97 2016/03/11 15:13:25 21.0 - - -
98 2016/03/11 15:13:55 20.5 - - -
99 2016/03/11 15:14:25 20.5 - - -
100 2016/03/11 15:14:55 20.5 - - -
101 2016/03/11 15:15:25 20.0 - - -
102 2016/03/11 15:15:55 21.0 - - -
103 2016/03/11 15:16:25 21.0 - - -
104 2016/03/11 15:16:55 19.9 - - -
105 2016/03/11 15:17:25 21.0 - - -
106 2016/03/11 15:17:55 21.4 - - -
107 2016/03/11 15:18:25 20.8 - - -
108 2016/03/11 15:18:55 20.5 - - -
109 2016/03/11 15:19:25 21.0 - - -
110 2016/03/11 15:19:55 20.0 - - -
111 2016/03/11 15:20:25 19.9 - - -
112 2016/03/11 15:20:55 21.4 - - -
113 2016/03/11 15:21:25 20.8 - - -
114 2016/03/11 15:21:55 20.8 - - -
115 2016/03/11 15:22:25 20.8 - - -
116 2016/03/11 15:22:55 20.3 - - -
117 2016/03/11 15:23:25 21.3 - - -
118 2016/03/11 15:23:55 20.8 - - -
119 2016/03/11 15:24:25 20.8 - - -
120 2016/03/11 15:24:55 20.4 - - -
121 2016/03/11 15:25:25 21.0 - - -
122 2016/03/11 15:25:55 20.5 - - -
123 2016/03/11 15:26:25 20.4 - - -
124 2016/03/11 15:26:55 20.8 - - -
125 2016/03/11 15:27:25 21.3 - - -
126 2016/03/11 15:27:55 21.3 - - -
127 2016/03/11 15:28:25 20.8 - - -
128 2016/03/11 15:28:55 21.3 - - -
129 2016/03/11 15:29:25 21.3 - - -
130 2016/03/11 15:29:55 20.7 - - -
131 2016/03/11 15:30:25 21.3 - - -
132 2016/03/11 15:30:55 21.3 - - -
133 2016/03/11 15:31:25 20.8 - - -
134 2016/03/11 15:31:55 20.7 - - -
135 2016/03/11 15:32:25 21.3 - - -
136 2016/03/11 15:32:55 21.3 - - -
137 2016/03/11 15:33:25 20.8 - - -
138 2016/03/11 15:33:55 20.8 - - -
139 2016/03/11 15:34:25 20.8 - - -
140 2016/03/11 15:34:55 19.9 - - -
141 2016/03/11 15:35:25 21.3 - - -
142 2016/03/11 15:35:55 20.8 - - -
143 2016/03/11 15:36:25 20.8 - - -
144 2016/03/11 15:36:55 21.3 - - -
145 2016/03/11 15:37:25 20.4 - - -
146 2016/03/11 15:37:55 20.2 - - -
147 2016/03/11 15:38:25 21.3 - - -
148 2016/03/11 15:38:55 20.7 - - -
149 2016/03/11 15:39:25 20.8 - - -
150 2016/03/11 15:39:55 20.8 - - -
151 2016/03/11 15:40:25 20.7 - - -
152 2016/03/11 15:40:55 20.3 - - -
153 2016/03/11 15:41:25 20.8 - - -
154 2016/03/11 15:41:55 19.8 - - -
155 2016/03/11 15:42:25 19.7 - - -
156 2016/03/11 15:42:55 21.2 - - -
157 2016/03/11 15:43:25 20.7 - - -
158 2016/03/11 15:43:55 20.2 - - -
159 2016/03/11 15:44:25 20.8 - - -
160 2016/03/11 15:44:55 20.7 - - -
161 2016/03/11 15:45:25 20.8 - - -
162 2016/03/11 15:45:55 21.3 - - -
163 2016/03/11 15:46:25 20.8 - - -
164 2016/03/11 15:46:55 20.2 - - -
165 2016/03/11 15:47:25 21.3 - - -
166 2016/03/11 15:47:55 20.8 - - -
167 2016/03/11 15:48:25 21.3 - - -
168 2016/03/11 15:48:55 21.3 - - -
169 2016/03/11 15:49:25 21.3 - - -
170 2016/03/11 15:49:55 20.8 - - -
171 2016/03/11 15:50:25 19.8 - - -
172 2016/03/11 15:50:55 20.8 - - -
173 2016/03/11 15:51:25 21.3 - - -
174 2016/03/11 15:51:55 19.7 - - -
175 2016/03/11 15:52:25 20.8 - - -
176 2016/03/11 15:52:55 20.8 - - -
177 2016/03/11 15:53:25 20.4 - - -
178 2016/03/11 15:53:55 20.8 - - -
179 2016/03/11 15:54:25 21.3 - - -
180 2016/03/11 15:54:55 21.3 - - -
181 2016/03/11 15:55:25 20.8 - - -
182 2016/03/11 15:55:55 20.8 - - -
183 2016/03/11 15:56:25 20.4 - - -
184 2016/03/11 15:56:55 19.8 - - -
185 2016/03/11 15:57:25 21.3 - - -
186 2016/03/11 15:57:55 21.3 - - -
187 2016/03/11 15:58:25 21.3 - - -
188 2016/03/11 15:58:55 20.4 - - -
189 2016/03/11 15:59:25 21.3 - - -
190 2016/03/11 15:59:55 20.8 - - -
191 2016/03/11 16:00:25 20.8 - - -
192 2016/03/11 16:00:55 19.7 - - -
193 2016/03/11 16:01:25 20.3 - - -
194 2016/03/11 16:01:55 21.3 - - -
195 2016/03/11 16:02:25 20.8 - - -
196 2016/03/11 16:02:55 21.3 - - -
197 2016/03/11 16:03:25 21.3 - - -
198 2016/03/11 16:03:55 20.8 - - -
199 2016/03/11 16:04:25 20.2 - - -
200 2016/03/11 16:04:55 21.3 - - -
201 2016/03/11 16:05:25 20.2 - - -
202 2016/03/11 16:05:55 20.2 - - -
203 2016/03/11 16:06:25 20.3 - - -
204 2016/03/11 16:06:55 20.2 - - -
205 2016/03/11 16:07:25 19.7 - - -
206 2016/03/11 16:07:55 21.3 - - -
207 2016/03/11 16:08:25 19.7 - - -
208 2016/03/11 16:08:55 21.3 - - -
209 2016/03/11 16:09:25 20.8 - - -
210 2016/03/11 16:09:55 20.8 - - -
211 2016/03/11 16:10:25 20.8 - - -
212 2016/03/11 16:10:55 21.3 - - -
213 2016/03/11 16:11:25 21.3 - - -
214 2016/03/11 16:11:55 21.3 - - -
215 2016/03/11 16:12:25 20.8 - - -
216 2016/03/11 16:12:55 20.8 - - -
217 2016/03/11 16:13:25 20.1 - - -
218 2016/03/11 16:13:55 20.2 - - -
219 2016/03/11 16:14:25 21.3 - - -
220 2016/03/11 16:14:55 21.3 - - -
221 2016/03/11 16:15:25 20.8 - - -
222 2016/03/11 16:15:55 20.8 - - -
223 2016/03/11 16:16:25 20.3 - - -
224 2016/03/11 16:16:55 21.1 - - -
225 2016/03/11 16:17:25 20.8 - - -
226 2016/03/11 16:17:55 20.3 - - -
227 2016/03/11 16:18:25 20.3 - - -
228 2016/03/11 16:18:55 20.6 - - -
229 2016/03/11 16:19:25 19.8 - - -
230 2016/03/11 16:19:55 20.2 - - -
231 2016/03/11 16:20:25 20.8 - - -
232 2016/03/11 16:20:55 20.6 - - -
233 2016/03/11 16:21:25 21.3 - - -
234 2016/03/11 16:21:55 20.6 - - -
235 2016/03/11 16:22:25 20.8 - - -
236 2016/03/11 16:22:55 20.8 - - -
237 2016/03/11 16:23:25 21.1 - - -
238 2016/03/11 16:23:55 20.8 - - -
239 2016/03/11 16:24:25 20.4 - - -
240 2016/03/11 16:24:55 20.2 - - -
241 2016/03/11 16:25:25 21.3 - - -
242 2016/03/11 16:25:55 20.8 - - -
243 2016/03/11 16:26:25 20.4 - - -
244 2016/03/11 16:26:55 20.8 - - -
245 2016/03/11 16:27:25 19.8 - - -
246 2016/03/11 16:27:55 19.9 - - -
247 2016/03/11 16:28:25 20.2 - - -
248 2016/03/11 16:28:55 20.8 - - -
249 2016/03/11 16:29:25 20.8 - - -
250 2016/03/11 16:29:55 21.3 - - -
251 2016/03/11 16:30:25 21.1 - - -
252 2016/03/11 16:30:55 20.8 - - -
253 2016/03/11 16:31:25 21.3 - - -
254 2016/03/11 16:31:55 21.3 - - -
255 2016/03/11 16:32:25 21.3 - - -
256 2016/03/11 16:32:55 20.8 - - -
257 2016/03/11 16:33:25 21.1 - - -
258 2016/03/11 16:33:55 20.8 - - -
259 2016/03/11 16:34:25 20.3 - - -
260 2016/03/11 16:34:55 21.2 - - -
261 2016/03/11 16:35:25 20.8 - - -
262 2016/03/11 16:35:55 20.8 - - -
263 2016/03/11 16:36:25 20.8 - - -
264 2016/03/11 16:36:55 21.3 - - -
265 2016/03/11 16:37:25 21.3 - - -
266 2016/03/11 16:37:55 21.3 - - -
267 2016/03/11 16:38:25 21.3 - - -
268 2016/03/11 16:38:55 19.8 - - -
269 2016/03/11 16:39:25 20.2 - - -
270 2016/03/11 16:39:55 20.8 - - -
271 2016/03/11 16:40:25 20.8 - - -
272 2016/03/11 16:40:55 20.8 - - -
273 2016/03/11 16:41:25 20.8 - - -
274 2016/03/11 16:41:55 20.8 - - -
275 2016/03/11 16:42:25 21.3 - - -
276 2016/03/11 16:42:55 21.3 - - -
277 2016/03/11 16:43:25 20.7 - - -
278 2016/03/11 16:43:55 20.2 - - -
279 2016/03/11 16:44:25 20.3 - - -
280 2016/03/11 16:44:55 20.4 - - -
281 2016/03/11 16:45:25 20.2 - - -
282 2016/03/11 16:45:55 20.2 - - -
283 2016/03/11 16:46:25 21.3 - - -
284 2016/03/11 16:46:55 20.8 - - -
285 2016/03/11 16:47:25 20.8 - - -
286 2016/03/11 16:47:55 20.8 - - -
287 2016/03/11 16:48:25 20.7 - - -
288 2016/03/11 16:48:55 20.8 - - -
289 2016/03/11 16:49:25 19.9 - - -
290 2016/03/11 16:49:55 20.2 - - -
291 2016/03/11 16:50:25 21.3 - - -
292 2016/03/11 16:50:55 21.3 - - -
293 2016/03/11 16:51:25 20.5 - - -
294 2016/03/11 16:51:55 21.3 - - -
295 2016/03/11 16:52:25 21.3 - - -
296 2016/03/11 16:52:55 21.3 - - -
297 2016/03/11 16:53:25 20.8 - - -
298 2016/03/11 16:53:55 20.5 - - -
299 2016/03/11 16:54:25 20.5 - - -
... 53646 more lines ...
|
Attachment 2: 2016-03-11_Evaporator_2.xlsx
|
527
|
Tuesday, February 09, 2021, 06:48 |
Aaron Schmidt | | NA | | Done | Ta coating test | Monday, February 08, 2021, 17:00: Installed brackets w/ Ta wire and a small piece of Re to test voltage drop.
Rough down, TP on. Waterlines open.
Tuesday, February 09, 2021, 06:44: Vacuum @ 8.63e-07T.
Tuesday, February 09, 2021, 06:45: Shut TP & roughing pump ff. Valves are close. Ready for power outage.
Tuesday, February 09, 2021, 11:30: BP1 & TP1 back on.
Tuesday, February 09, 2021, 11:37: PS on. Vacuum @ 9.7e-06T & continuing down.
micron slope 0.98
Tuesday, February 09, 2021, 16:01 Pressure 7.26e-7 Torr
aiming at a temperature of 2000 degC on the wire; wire is not in the visual range of pycnometer; simulations of the system indicate that wire will be at 2000 degC at 60 W, hence current will be increased slowly.
Rate: 0.1 A/60 s to 10 A
Tuesday, February 09, 2021, 16:47 Tendence showed that at 5 A the power will be ~10 W, final ramping step was updated accordingly.
Tuesday, February 09, 2021, 16:49 Pressure dropping a bit: Current reading 7e-7 Torr
Tuesday, February 09, 2021, 17:09Pressure going down, curent will be ramped down at 0.2 A/min
Pressure: 6.958e-7 Torr, TGHT: 5 A, 2.748 V, omega is reading 1625 degC somewhere somehow, wire will stay at this conditions for 10 min to see if there is a pressure or voltage change.
Tuesday, February 09, 2021, 17:16 voltage and temperature are slowly increasing 2.789 V, and 1688 degC respectively.
Tuesday, February 09, 2021, 17:32 Voltage signal is noisy but it seems like the voltage is not increasing anymore, preassure has remained constant, wire is glowing, 1100 degC with manual pyrometer.
Tuesday, February 09, 2021, 17:44 TGHT: 2.81 V, 4.95 A, IGP1 6.63e-7 Torr. current will be increased manually at 0.2 A steps. At first step voltage is stable.
Tuesday, February 09, 2021, 18:13 TGHT: 6.6A, 3.981V (~26W), Omega 1741 degC and manual pyrometer ~1300 degC
Tuesday, February 09, 2021, 18:28 TGHT: 8A, 5.121V (~40W), omega 1816 degc, 1390 degC with manual pyrometer, step changed to 0.4A.
Tuesday, February 09, 2021, 18:34 TGHT: 8.8A, 5.88V (50W), omega 2008 degC, 1500 manual pyrometer
Tuesday, February 09, 2021, 18:56 TGHT: 9.6A, 6.64V, manual pyrometer 1800 degC, omega 2042 degC, wire is shinny enough for micron 2092 degC.
Tuesday, February 09, 2021, 19:01TGHT: 10A, 7V, ~1800 degC manual pyrometer, omega 2123 degC, micron 2152 degC
Tuesday, February 09, 2021, 19:15 TGHT: 10.5A, 7.47V, 2150 degC Omega, 2165 degC, ~1800 degC manual
Tuesday, February 09, 2021, 19:23 TGHT: 11A, 7.93 V, 2188 omega, 2210 deC micron
Tuesday, February 09, 2021, 19:29 TGHT: 11.5A, 8.37V, 2188 omega, 2210 deC micron
Tuesday, February 09, 2021, 19:33 TGHT: 12A, 9V, 2325 degC, 1900 degC manual, the wire changed shape and the preassure increase a bit , micron was readjusted to read, micron 2454 degC. Wire might be touching tube, only one more amper will be imputed.
Tuesday, February 09, 2021, 19:55 TGHT 13A, 9.865 V, 2404 degC omega , 2558 degC micron, manual pyrometer still reads 1800 degC, pressure increased with the power increment, bbut it seems like the wire touching the tube so no more current will be imputed.
Tuesday, February 09, 2021, 20:08 started ramping at -0.2A/min
Wednesday, February 10th , 20211, 10:00 System unloaded from EVAP2, wire has straightened, it has not sintered to the copper brackets, system is clean there is no evidence of coating. |
120
|
Friday, March 07, 2014, 10:34 |
Anders Mjos | | | | Problems resolved | TGHT2 water flow signal | There was no signal going from the coils to the PLC. After manipulating the connection points on the coil a signal could again be established. Frequency is ~ 40Hz. |
168
|
Tuesday, November 04, 2014, 16:20 |
John Wong | SiC | | TARGET BOAT | In progress | TEST: Fabrication of SiC & Determine phase transformation 3C vs 6H | Tuesday, November 04, 2014, 16:08
The purpose of this experiment is to improve the fabrication of SiC. Previously, the SiC target was heated to 2000c and yellow crystals were observed.
In this experiment, 10g of SiC powder (7um size) was previously milled down (actual size to be determined under SEM). The powder was mixed with 5% PVA and the slurry was pour onto a glass and let dry. The semi-dry slurry was rolled up into balls. The SiC balls were let dry in over (115C) over night. Taken out 2.903g SiC + 5% PVA, it's rolled up with a small sheet of graphite foil. Then the targer boat is filled with the sample and wrapped with 3-layers of Ta-heat shield.
The sample will be heated up to 2000C to see if the yellow crystals are reproducible. It is suspected that there might be a phase transformation from 6H alpha-SiC to 3C beta-SiC.
Chamber is currently being pumped down...
Wednesday, November 05, 2014, 14:04
TGHT was ramped up over night, currently at 485A = 1800 C.
Will do manual step up to get to 2000C.
|
588
|
Wednesday, August 10, 2022, 09:31 |
Ivan Bao | Empty | | TARGET BOAT | In progress | TC tests | 1st test polarity 1
10:12 am Begin pumping down to rough vacuum
12:50 pm begin ramping up towards 2000C. Ta tube only, welded thermocouple mount
3:08 Ta tube reached 2000C, began ramping down. The ramping up process was smooth and no hiccups happened
4:57 ramp down complete, began shutting down the evap2, will let the turbopump to slow down spin overnight.
2nd test polarity 2(swapped)
Tuesday, Aug 09 2022, 4pm begin pumping to vacuum after switching the polarity of the power supply
Wednesday, August 10, 2022, 13:09 begin ramping up
3:18 ramped to 671A. 2000C, no hiccups, everything is nominal. The thermocouple reads higher than before, about 20-30 deg C colder than pyro at high temperatures (1400C and above)
No bad connections, short circuits or unexpected overheating.
begin ramping down
ramping down was smooth, with error being the TC about 40 deg C colder than pyro at temp above 1500C
ramping done completed at Wednesday, August 10, 2022, 16:46 , shutting down evap 2 roughing and turbopump |
585
|
Tuesday, June 28, 2022, 09:31 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | In progress | TC test on Ta tube | Tuesday, June 27, 2022, early afternoon: We assembled the setup in evap2 and started the pumps leaving it running over night.
Tuesday, June 28, 2022, 09:31 Turbo pump stopped for unknown reasons a few hours after we left. Restarting the pump.
Tuesday, June 28, 2022, 10:23 Vacuum down to 1e-5T start to ramp up TGHT 1A/10s to 200A.
Tuesday, June 28, 2022, 1:20 pm, Ramped from 0-500A. thermocouple reading 900C while pyrometer reads 1600C. begin ramping down to 0A. |
587
|
Thursday, August 04, 2022, 09:31 |
Ferran Boix Pamies | Empty | | TARGET BOAT | In progress | TC on Ta boat test. | 11am: Setting up new target tube thermocouple test
Thursday, August 04, 2022, 09:31 Test finished August 3rd afternoon. Venting now.
|
20
|
Tuesday, May 15, 2012, 17:06 |
John Wong | | | | Problems resolved | TBHT power supply faulty | Tuesday, May 15, 2012, 17:03
The tube heater power supply current readback and setpoint are not matching. Ray Dube checked the power supply and confirmed that it is faulty. He will replace a functional p/s tomorrow.
Friday, May 18, 2012, 13:24
The original p/s was replaced with a new one and there was still a discrepancy between the readback and the setpoint. After checking with the drawings for the ITE/ITW tube heaters, it was confirmed that the connections for the Evap#2 tube heater control were wrong. (see attachment 1). The connections were corrected and the power supply is now operational.
|
Attachment 1: tubeheater_control.png
|
|
19
|
Tuesday, May 15, 2012, 17:03 |
John Wong | | | | Problems | TBHT cooling line leaky | Tuesday, May 15, 2012, 17:00
It was found that there were water droplets from the TBHT cooling line. The joint is leaky. (see attachment 1)
A message has sent to Rick M.
|
Attachment 1: TBHT_cooling_line_leaky.pdf
|
|
21
|
Wednesday, May 16, 2012, 14:04 |
John Wong | | | | Problems resolved | TBHT cooling line leaky |
John Wong wrote: |
Tuesday, May 15, 2012, 17:00
It was found that there were water droplets from the TBHT cooling line. The joint is leaky. (see attachment 1)
A message has sent to Rick M.
|
Wednesday, May 16, 2012, 14:01
The connector was re-tighten. The water valve was opened, and no water leaks were found.
|
584
|
Tuesday, June 21, 2022, 09:48 |
Darwin Ortiz Rosales | SiC | 37978-1 | HP-FEBIAD | Done | T-220617 sintering | Tuesday, June 21, 2022, 09:43
Total number of foils: 377 ( including 6 analysis discs on the right side of the container)
Total weight = 1454 g (includes heatshields, spring and T bar)
Total length packed 15.5 cm (excluding 6 analysis discs that will be removed)
container has 3 Ta heat shields and is coated
No endcaps inserted to facilitate out-gassing
Ta coated spring at front (right) side
Initially to ramp TGHT and TBHT to 80A at 2 A/min
then to 120A and slow down ramp when pressure begins to increase
max approx 675A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1=3.6 e-07 Torr at start of initial ramp.
Tuesday, June 21, 2022, 13:54
IGP1= 7.1 e-05 and dropping. Start ramp to 150A for both TGHT and TBHT @1A/min
Tuesday, June 21, 2022, 21:27
Increased ramp rate to 3A/min for TGHT to 675A
Tuesday, June 21, 2022, 22:38
Ramp up to 685 A on TGHT and leave for 4 hours.
OMEGA = 1645 C but suspect reading not on Ta surface.
Wednesday, June 22, 2022, 02:28
IGP1=7.7e-6 Torr
OMEGA =1610C
TGHT = 685A, 10.5V
TBHT = 230A, 3V
initiate rampdown at -2A/min and -1Amin TGHT and TBHT |
578
|
Tuesday, June 07, 2022, 07:31 |
Darwin Ortiz Rosales | SiC | 42464-2 | HP-FEBIAD | Done | T-220524 Sintering SiC | Tuesday, June 07, 2022, 07:19
Total number of foils: 403 ( including 5 analysis discs on the right side of the container)
Total weight = 1535.3 g (includes heatshields, spring and T bar)
Total length packed 16.4 cm (excluding 5 analysis discs that will be removed)
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Ta coated spring at front (right) side
Initially to ramp TGHT and TBHT to 50A at 3 A/min
then continue to 80A and slow down ramp when pressure begins to increase
max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1= 7.6 e-07 Torr at start of initial ramp.
Tuesday, June 07, 2022, 11:14
Ramping to 150A on TGHT and TBHT at 1A/min
Ramped TGHT and TBHT to 230A at 2A/min
Tuesday, June 07, 2022, 13:12
Ramping TGHT to 600A at 4A/min
TBHT at 230A, 3.0V
Tuesday, June 07, 2022, 16:41
TGHT= 740 A, 12.1V
TBHT= 232A, 3.0 V
OMEGA reading 1616C but questionable. Will leave for 4 hours at 740A top TGHT.
Wednesday, June 08, 2022, 22:15
Early Wednesday morning the left TGHT bolt was found damaged. The target leg was coated with bolt material rendering the Target inoperable.
The Heatshield assembly was swapped and surfaces cleaned. A "dummy" FEBIAD was installed to test if the system can withstand high current.
The system was pumped down and ramped to 740A on TGHT at 4A/min. It was then left at that current for 4 to 5 hours.
Currently starting rampdown at -2A/min to 0A.
Photos of the incident attached in *eLog 580*. IGP1= 5.7e-06 Torr
TGHT= 742A, 11.4V |
576
|
Wednesday, May 18, 2022, 09:59 |
Darwin Ortiz Rosales | SiC | 44692-9 | HP-FEBIAD | Done | T-220516 Sintering SiC | Wednesday, May 18, 2022, 09:46
Total number of foils: 415 ( including 10 analysis discs on the right side of the container)
Total weight = 1580 g (includes heatshields and T bar)
Total length packed 17 cm (including 10 analysis discs that will be removed)
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Ta coated spring at front (right) side
Initially to ramp TGHT and TBHT to 30A at 3 A/min
then continue to and slow down ramp when pressure begins to increase
max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1= 7.1 e-07 Torr at start of initial ramp. Note, first real operation with new noisy Turbo Pump.
Wednesday, May 18, 2022, 10:18
Pressure increase observed starting around 60A. Ramped to 70 A and will leave until pressure stabilizes
After about 30 minutes pressure dropped so ramped up to 90 A @1A/min on both TGHT and TBHT
Wednesday, May 18, 2022, 11:37
pressure spike around 90A. will leave until pressure stabilizes
Wednesday, May 18, 2022, 12:54
start autoramp to 100A at 1A/min. IGP1= 1.4e-4 Torr
Wednesday, May 18, 2022, 13:15
autoramp to 150A @1A/min
Wednesday, May 18, 2022, 13:41
At 110A another spike in pressure. System waiting for good vacuum
Wednesday, May 18, 2022, 15:24
ramped to 150A on both TGHT and TBHT. Ramping to 200 A at @A/min for both TGHT and TBHT
currently IGP1= 2.0e-4 Torr
Wednesday, May 18, 2022, 15:33
Pressure still trending down; therefore will start ramp at 4A/min to 400 amp on TGHT and 230A to TBHT
Wednesday, May 18, 2022, 16:22
Increasing ramp to 4A/min on TGHT
Wednesday, May 18, 2022, 17:26
switched to 6A/min in 1A/10s increments on TGHT
Wednesday, May 18, 2022, 17:43
Set final current to 730 A as per regression attached.
Wednesday, May 18, 2022, 17:54
Final current on TGHT = 740A, 11.9 V
OMEGA = 1775 C
TBHT = 230A,
Will leave for 4 hours
Wednesday, May 18, 2022, 19:56
Temperature dropped so increased current to 755A for the remaining of the time.
Friday, May 20, 2022, 08:58
Final notes: The difference between initial and final mass was 6 g as expected. Slight coating on window of evaporator may explain apparent temperature drop. Next time will keep current at projected setting. The material looks good with slight overheating on the outer discs of left side.
|
605
|
Thursday, November 24, 2022, 11:08 |
John Wong | TiC | | TARGET BOAT | Done | Synthesis of TiC fibrous disc (TiO2/PAN only) | Thursday, November 24, 2022, 11:01
Target container contains one disc of e-spun TiO2/PAN fibrous disc, (Ref sample P-134).
Sample will be heated to 1875C, similar to the previous process, see e-log ID#599.
TGHT will be autoramped to 350 A and monitor the conditions before ramping up further.
Good vacuum: 3e-5 Torr
Bad vacuum: 5e-5 Torr
Omega slope: 0.99
Initiate autoramp: 1 A/min
Chamber has been pumped down below 5.0e-6 Torr.
Friday, November 25, 2022, 08:38
TGHT reached to 348A/5.8V; temp is holding at 1600 C since 19:00 yesterday, see attachment#1.
Stepping up TGHT to 400A and continue to monitor.
Friday, November 25, 2022, 09:45
TGHT reached to 400A/6.8V; temp holding at 1758C. Pressure coming down from 6.6e-7 Torr.
Ramping up to 410A.
Friday, November 25, 2022, 12:28
TGHT reached 410A/7.08V. temp holding at 1790 C. Pressure coming down from 6.9e-7 Torr.
Ramping up to 430A.
Friday, November 25, 2022, 13:01
TGHT reached 430A/7.4V. Temp holding at 1837 C. Pressure coming down from 7.73e-7 Torr.
Ramping up to 440A.
Friday, November 25, 2022, 13:50
TGHT reached to 440A/7.6V. Temp holding at 1864C. Tapping TGHT to 444A (readback 443A - 449 A)/7.7V.
Desired Temp has reached, 1875 C. Will continue to hold on this temp over the weekend.
Sunday, November 27, 2022, 21:14
TGHT has been holding at 442A (lowered by 2 A on Fri to maintain 1875C). Temp increased to 1887C. Pressure at 2.5e-7 Torr.
See attachment#2 for plots/temp.
Initiated cooling at 1A/min.
|
Attachment 1: striptool_1600C.jpg
|
|
Attachment 2: striptool_1887C.jpg
|
|
595
|
Tuesday, October 18, 2022, 13:59 |
Hannah Toy | TiC | Target boat (tube) | TARGET BOAT | Done | Synthesis of TiC | Tuesday, October 18, 2022, 13:52
38 pieces of samples made of TiO2/C/PVP loaded into a target boat wrapped with 2 layers of Ta-heat shield.
Samples will be heated to 1700, 1800, 1900, and 2000 C
Some of the pieces will be removed after each target temperature
Target chamber has been pumping down and the current pressure reading is 6.62e-6 T
Tuesday, October 18, 2022, 14:12
TGHT will be autoramped to 250 A
Good vacuum: 3e-5 Torr
Bad vacuum: 5e-5 Torr
Omega slope: 0.99
Initiate autoramp: 1 A/min
|
596
|
Wednesday, October 19, 2022, 09:50 |
John Wong | TiC | Target boat (tube) | TARGET BOAT | Done | Synthesis of TiC |
Hannah Toy wrote: |
Tuesday, October 18, 2022, 13:52
38 pieces of samples made of TiO2/C/PVP loaded into a target boat wrapped with 2 layers of Ta-heat shield.
Samples will be heated to 1700, 1800, 1900, and 2000 C
Some of the pieces will be removed after each target temperature
Target chamber has been pumping down and the current pressure reading is 6.62e-6 T
Tuesday, October 18, 2022, 14:12
TGHT will be autoramped to 250 A
Good vacuum: 3e-5 Torr
Bad vacuum: 5e-5 Torr
Omega slope: 0.99
Initiate autoramp: 1 A/min
|
Wednesday, October 19, 2022, 09:42
TGHT has reached to 250A/3.95V, Temp at ~1100 C. (The archiver is currently not working; already contacted Control to look into it.)
Pressure reached below 4.9 e-7 Torr.
Auto-ramp to 300 A at 2A/min. Continue to monitor.
Wednesday, October 19, 2022, 10:24
TGHT reached to 300 A/4.89V. Temp at 1206 C.
Pressure went up slightly and came down after the TGHT setpoint was reached, see attachment#1.
Continue to auto-ramp to 350A at 2A/min.
Wednesday, October 19, 2022, 11:35
TGHT reached to 350A/5.8V. Temp at 1360C.
Pressure reached above 1e-6 Torr and came down after TGHT reached the setpoint.
Continue to auto-ramp to 400 A at 2A/min
Wednesday, October 19, 2022, 11:57
TGHT reached to 400 A/6.89V. Temp at 1485C.
Pressure went up to 3.3e-6 Torr and came down after TGHT reached the setpoint, see attachment#2.
A temp vs current plot has been generated (see shared folder \Hannah\) - est TGHT 480A to reach 1700 (T1).
Auto-ramp to 420 at 1A/min. Continue to monitor closely...
Wednesday, October 19, 2022, 13:01
TGHT reached 420A/7.23V, Temp at 1520 C.
Continue auto-ramping to 440A at 1A/min.
Wednesday, October 19, 2022, 13:42
TGHT reached 440A/7.65V. Temp at 1572 C
Continue auto-ramping to 460A at 1A/min.
Wednesday, October 19, 2022, 14:10
TGHT reached to 460A/8.10 V. Temp at 1628 C.
Tapping up TGHT to reach 1700 C
Wednesday, October 19, 2022, 15:33
TGHT was tapped up to 474A, Temp reached to 1700 C since 14:30.
Pressure is slowing coming down, currently at 1.4 e-6 Torr.
Will hold at this target current for a few hours.
Wednesday, October 19, 2022, 16:58
Temp went up slightly to 1713 C as the pressure is coming down.
Lower TGHT to 468A/8.45V to maintain the temp at 1700 C.
Wednesday, October 19, 2022, 19:55
Temp went up again to 1716 C, but this time the pressure also went up, see attachment#3. Not sure why the target got hotter... the voltage seems normal and consistent.
Lower TGHT to 462A/8.44V to maintain at 1700 C.
Continue monitoring...
Wednesday, October 19, 2022, 22:56
Temp went up another 10 C, to 1710 C, TGHT is holding at 462 A/8.48V. Notice the TGHT current readback is fluctuating between 458A - 463 A.
Initiated cooling.. 2A/min
Friday, October 21, 2022, 08:55
All the samples were taken out from the Evap on Thursday Oct 20. We decided to do so because there was not enough sample in each batch for XRD analysis. All the sample will be analyzed as treated at 1700 C.
See attachement #$ for the overall TGHT/Vac plot.
|
Attachment 1: Screenshot_2022-10-19_102257.png
|
|
Attachment 2: Screenshot_2022-10-19_120146.png
|
|
Attachment 3: Screenshot_2022-10-19_195305.png
|
|
Attachment 4: Screenshot_2022-10-21_085223.png
|
|
635
|
Monday, June 05, 2023, 14:52 |
Aaron Schmidt | | | | | Swapped turbo pumps. | Previous TP would only spin up to 4KRPM. New TP installed.
Monday, June 05, 2023, 14:50: Roughing.
Monday, June 05, 2023, 15:10: Controller reset. TP on. |
|