  Evaporator_2, Page 10 of 34  Not logged in ELOG logo
  ID Date Author Target Material Target Oven W.O# Source Statusdown Subject Text Attachments
  324   Tuesday, September 20, 2016, 15:40 Laura LambertSiC39530-9HP-FEBIADIn progressSintering SiC#35

    

       
            
 sintering_target_data.xlsx 
  325   Thursday, September 22, 2016, 12:14 John WongSiC39530-9HP-FEBIADIn progressSintering SiC#35

    

       
            
  
  328   Friday, October 07, 2016, 16:42 Laura LambertTa41790-5LP-SISIn progressConditioning Ta#50Friday, October 07, 2016, 16:40
Target consists of 470 discs.
 Ta#50_no_endcaps_3xh.s..xlsx 
  329   Wednesday, October 12, 2016, 21:18 John WongTa41790-5LP-SISIn progressConditioning Ta#50


   
        
            
  
  331   Thursday, October 13, 2016, 18:05 Laura LambertTa41790-5LP-SISIn progressTemperature measurements for Ta#50Thursday, October 13, 2016, 18:04
Target loaded into evap2
No heat shields.
  
  332   Saturday, October 15, 2016, 12:42 Aurelia LaxdalTa41790-5LP-SISIn progressTemperature measurements for Ta#50

    

       
            
  
  333   Sunday, October 16, 2016, 17:55 Aurelia LaxdalTa41790-5LP-SISIn progressTemperature measurements for Ta#50

    

       
            
  
  336   Tuesday, November 15, 2016, 16:51 John Wongnp-SiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1Tuesday, November 15, 2016, 16:48
Three samples were prepared 
(see my logbook#1 page 3, preparing for carbonization).
  
  337   Thursday, November 17, 2016, 11:15 Laura Lambertnp-SiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1


   
        
            
  
  353   Friday, March 31, 2017, 12:22 John Wongnp-SiC TARGET BOATIn progressThermo test: B3 Pellets (13.3K-PSI) Friday, March 31, 2017, 12:21
Two compressed pellets loaded into
the target boat and wrapped with Ta foil. 
 heating_curve_00.JPGheating_curve_13PSI_pellets_01.JPG 
  354   Wednesday, April 05, 2017, 15:42 Laura LambertEmpty TARGET BOATIn progressSintering TaC coating on evap1 target boat Wednesday, April 05, 2017, 15:36
Coated container with TaC coating
using spray technique this morning and let
  
  359   Thursday, April 20, 2017, 12:45 John Wongnp-SiC TARGET BOATIn progressHigher Temp Treament: B3-92Mpa pellets Thursday, April 20, 2017, 12:38
3 samples are loaded into the Ta
boat and wrapped with heat shield (1 long
 B3_PAN_pellets_1800c.JPG 
  360   Thursday, April 27, 2017, 15:54 Laura LambertSiC39530-10HP-FEBIADIn progressSintering SiC#36 Thursday, April 27, 2017, 14:01
Target container contains 470
  
  365   Wednesday, May 10, 2017, 16:07 Laura LambertEmpty TARGET BOATIn progressConditioning Heat Shield for IGLIS UCx#20 - test stand is down Wednesday, May 10, 2017, 16:05
Loaded.
HS water valves opened, no leaks
  
  366   Wednesday, May 10, 2017, 21:33 Anders MjosEmpty TARGET BOATIn progressConditioning Heat Shield for IGLIS UCx#20 - test stand is down

    

       
            
  
  374   Wednesday, June 14, 2017, 15:51 Laura LambertSiC40282-4TARGET BOATIn progressSintering SiC pellets Wednesday, June 14, 2017, 15:49
Pellets previously made by Marla
and weighed.
  
  395   Thursday, December 07, 2017, 10:03 Laura LambertEndcaps TARGET BOATIn progressSintering TaC coating on endcaps and springs Thursday, December 07, 2017, 09:57
Each endcap is wrapped in a
  
  440   Tuesday, April 23, 2019, 13:55 Aaron SchmidtTa43044-4LP-SISIn progressConditioning Ta#58Ta#58 LP-SIS  Ta#58_Loading_data.pdfTa#58_Evap_2_Conditioning..docx 
  457   Monday, September 16, 2019, 14:50 Aaron SchmidtTa44062-5LP-SISIn progressConditioning Ta#59 Ta#59 LP-SIS  Ta#59_Evap_2_Conditioning..docx 
  459   Thursday, September 26, 2019, 14:03 Aaron SchmidtNb41882-3TARGET BOATIn progressHS swap & test Nb target HS# 42752-7
Thursday, September 26, 2019, 13:46:
Remove Flexible lines HS
  