  Evaporator_2, Page 10 of 34  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target Material Target Oven W.O# Sourcedown Status Subject Text Attachments
  66   Thursday, April 11, 2013, 14:20 John WongEmpty39165-6LP-SISDoneCoating target oven /w TaC & sintering for UCx#6Monday, April 08, 2013, 17:39
Target container is coated with TaC;
the container will be used for the UCx#6
  
  79   Monday, July 22, 2013, 15:03 John WongEmpty38634-7LP-SISDoneSintering empty target oven coated with TaC for UCx#7Monday, July 22, 2013, 15:00
Target container is coated with TaC
- this container will be used for UCx#7.
  
  91   Friday, October 04, 2013, 16:21 John WongEmpty LP-SISDoneSintering TaC coating on a LP target container to be used for C-grv tube test Friday, October 04, 2013, 15:37
A LP target container is coated with
TaC.  The container is wrapped with
 LP_C_grv_tempcurve.PNGLP_C_grv_TGHT632_1960C.PNG 
  97   Wednesday, January 15, 2014, 17:45 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container Wednesday, January 15, 2014, 17:30
Target container is coated with TaC.
 No Ta-heat shields are used.
  
  98   Thursday, January 16, 2014, 13:06 Laura LambertEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  99   Friday, January 17, 2014, 09:34 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  100   Friday, January 17, 2014, 10:18 Laura LambertEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  101   Friday, January 17, 2014, 12:52 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container

    

       
            
  
  102   Monday, January 20, 2014, 16:30 Laura LambertEmpty39165-9LP-SISDoneSintering TaC coating container

    

       
            
  
  116   Friday, January 31, 2014, 12:10 Laura LambertEmpty39165-10LP-SISDoneSintering TaC coating container for Ta? Friday, January 31, 2014, 11:28
Target container is coated with TaC.
The container is wrapped with 3 x
  
  135   Friday, June 13, 2014, 14:57 Laura LambertTa40282-2LP-SISIn progressConditioning Ta#43 target Friday, June 13, 2014, 14:53
Container is filled with 400 discs
of Ta foils; target length = 5.2cm;
  
  136   Monday, June 16, 2014, 17:42 John WongTa40282-2LP-SISIn progressConditioning Ta#43 target

    

       
            
 Ta#43_3.JPEG 
  137   Tuesday, June 17, 2014, 10:14 Laura LambertTa40282-2LP-SISDoneConditioning Ta#43 target

    

       
            
  
  143   Wednesday, July 23, 2014, 15:07 John WongEmpty40282-3LP-SISIn progressSintering TaC coated target container Wednesday, July 23, 2014, 15:07
Target container is coated with TaC. 
No Ta-heat shields are used.
  
  144   Monday, July 28, 2014, 10:52 Laura LambertEmpty40282-3LP-SISDoneSintering TaC coated target container

    

       
            
  
  145   Monday, July 28, 2014, 15:06 Laura Lambert 40282-3LP-SISIn progressSintering ZrC# 6 target Monday, July 28, 2014, 14:41
Total number of foils: 445 discs
Total mass of materials [incl graphite
  
  146   Tuesday, July 29, 2014, 11:23 John Wong 40282-3LP-SISIn progressSintering ZrC# 6 target

    

       
            
  
  147   Friday, August 01, 2014, 11:47 Peter Kunz  40282-3LP-SISIn progressZrC #6 conditioningThe maximum current of 580A was reached
at 9:15.
TGHT:RDCUR 578 A
  
  148   Friday, August 01, 2014, 13:27 Peter Kunz  40282-3LP-SISIn progressZrC #6 conditioningTarget was conditioned for 4 hours at 580A.
Initiating ramp-down sequence @ 2A/min
 
 zrc6_conditioning.png 
  149   Tuesday, August 05, 2014, 12:01 Laura Lambert 40282-3LP-SISDoneZrC #6 conditioning

    

       
            
  