Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 27 of 34  Not logged in ELOG logo
  ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  159   Thursday, October 02, 2014, 11:26 John WongEmpty  MaintenanceBroken insulators  Thursday, October 02, 2014, 11:22
It was found that after the last
process, Evap#2 has broken insulators - the
  
  158   Thursday, September 25, 2014, 17:35 John WongEndcaps40282-5TARGET BOATDoneSintering Ta-coated endcaps (temp measured) Thursday, September 25, 2014, 17:32
Target boat is filled with Ta-coated
endcaps.  The caps are stacked together. 
  
  157   Tuesday, September 23, 2014, 18:32 John WongEmpty40282-5TARGET BOATDoneSintering Ta target boat with TaC coating (with Temp measurement)

    

       
            
  
  156   Tuesday, September 23, 2014, 15:02 Laura LambertEmpty40282-5TARGET BOATIn progressSintering Ta target boat with TaC coating Tuesday, September 23, 2014, 15:00
A new target boat [new design with
no end caps] was sprayed with TaC coating
  
  155   Thursday, September 11, 2014, 14:23 Laura Lambert 40282-3TARGET BOATFailedSintering TaC coated end caps Thursday, September 11, 2014, 13:14
The target container end caps were
coated with TaC spray and let dry.
 IMG_20140917_142605683.jpgIMG_20140917_143120141.jpgIMG_20140917_143343399_HDR.jpgCapture.JPGCapture2.JPG 
  154   Friday, August 08, 2014, 15:16 Laura LambertTa38817-9HP-SISDoneConditioning Ta target

    

       
            
  
  153   Thursday, August 07, 2014, 10:13 Laura Lambert  TARGET BOATFailedSintering TaC coated end caps

    

       
            
  
  152   Wednesday, August 06, 2014, 16:10 John WongTa38817-9HP-SISIn progressConditioning Ta targetWednesday, August 06, 2014, 15:59
Target consists of 400 Ta discs. 
Total packed length 4.5cm
  
  151   Tuesday, August 05, 2014, 17:20 John Wong  TARGET BOATIn progressSintering TaC coated end caps

    

       
            
  
  150   Tuesday, August 05, 2014, 13:13 Laura LambertEmpty TARGET BOATIn progressSintering TaC coated end caps Tuesday, August 05, 2014, 12:02
The target container end caps were
coated with TaC spray and let dry.
 aug5-2014.jpg 
  149   Tuesday, August 05, 2014, 12:01 Laura Lambert 40282-3LP-SISDoneZrC #6 conditioning

    

       
            
  
  148   Friday, August 01, 2014, 13:27 Peter Kunz  40282-3LP-SISIn progressZrC #6 conditioningTarget was conditioned for 4 hours at 580A.
Initiating ramp-down sequence @ 2A/min
 
 zrc6_conditioning.png 
  147   Friday, August 01, 2014, 11:47 Peter Kunz  40282-3LP-SISIn progressZrC #6 conditioningThe maximum current of 580A was reached
at 9:15.
TGHT:RDCUR 578 A
  
  146   Tuesday, July 29, 2014, 11:23 John Wong 40282-3LP-SISIn progressSintering ZrC# 6 target

    

       
            
  
  145   Monday, July 28, 2014, 15:06 Laura Lambert 40282-3LP-SISIn progressSintering ZrC# 6 target Monday, July 28, 2014, 14:41
Total number of foils: 445 discs
Total mass of materials [incl graphite
  
  144   Monday, July 28, 2014, 10:52 Laura LambertEmpty40282-3LP-SISDoneSintering TaC coated target container

    

       
            
  
  143   Wednesday, July 23, 2014, 15:07 John WongEmpty40282-3LP-SISIn progressSintering TaC coated target container Wednesday, July 23, 2014, 15:07
Target container is coated with TaC. 
No Ta-heat shields are used.
  
  142   Tuesday, June 24, 2014, 23:57 John WongSiC39530-8HP-FEBIADIn progressConditioning SiC#31 target

    

       
            
 2014-06-24_16.57.17.jpg 
  141   Monday, June 23, 2014, 09:47 Laura LambertSiC39530-8HP-FEBIADIn progressConditioning SiC#31 target

    

       
            
 current_vs_temp.jpeg 
  140   Friday, June 20, 2014, 16:22 John WongSiC39530-8HP-FEBIADIn progressConditioning SiC#31 target

    

       
            
  
ELOG V2.9.2-2455