  127   Monday, February 29, 2016, 16:16 Laura LambertUC241077-1LP-SISDoneConditioning UCx#15

John Wong wrote:

Laura Lambert wrote:

 Thursday, February 18, 2016, 15:34

Target container was previously coated with TaC spray and sintered.

Container is wrapped with 3 layers of Ta-heat shield, including the center block - same method as for sintering TaC coating [new wrapping method-see elog112 eva2].

The target consists of 244 discs of UCx with 7.8cm in length.

A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down, so the right is open

The chamber is currently pumping down.

TGHT will be ramped up to 520A at 0.1A/min

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.


 Friday, February 19, 2016, 08:28

IG1 = 4.7e-6 Torr

Tapped up manually to 35A.

Waited ~1hr, vacuum stable

IG1 = 3.8e-6 Torr.

Initiating auto-ramp.


 

 Friday, February 26, 2016, 10:26

Target has been heated at 520A for 10 hrs.

Vacuum at 5.3e-6 Torr. 

Initiated cool down at 1A/min. 

Remember to vent with Ar. 


 

 Monday, February 29, 2016, 16:15

Vented in Ar.

Target removed from evap1 this morning.

Currently sitting in glovebox.

Weird red discharge on the end of the right side, inside the container [wrt ionizer tube into page] - same side with no endcap during carbonization.

Materials look good, both endcaps inserted.

Rh foil still needs to be implanted.


 Wednesday, March 02, 2016, 10:13

The discoloration appears to be a simple change in the morphology of the TaC coating, future tests would need to be done to confirm this estimation.

This should not effect the container/ target.

See photo attached.

Attachment 1: UCx_15.jpg
UCx_15.jpg
  130   Tuesday, April 19, 2016, 10:48 Laura LambertUC2*** Done***ALL FUTURE UCx TARGETS***

 Tuesday, April 19, 2016, 09:47

Temperature measurements have been taken in evap2 on target containers. 

Previously all UCx targets have been conditioned in evap1 at 520A. The respective target containers TaC coating was sintered in evap2 at a different current.

All future UCx targets will now be conditioned in evap1 at the same current required to reach 1900C in evap2 when sintering the TaC coating on the container to be used for the respective target.

ie. If a container is being sintered in evap2 at 450A [1900C], this same container is used for UCx - then that specific UCx target will be conditioned in evap1 at 450A.

Confirm full carbonization has been achieved by following with the vacuum on the strip tool and make sure the final vacuum comes down at the end of the whole process.


 

  132   Wednesday, May 18, 2016, 15:15 Laura LambertUC240860-2LP-IG-LISDoneConditioning UCx#16

 Wednesday, May 18, 2016, 15:05

Target container was previously coated with TaC spray and sintered.

Container is wrapped with 3 layers of Ta-heat shield, including the center block - new wrapping method-see elog112 evap2

The target consists of 200 discs of UCx with 7.4cm in length [4 packs of 5 + 180 single discs].

A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.

The right side is open with a TaC coated spring to help hold materials in.

The chamber is currently pumping down.

TGHT will be ramped up to 460A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog291 evap2]

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.


 Thursday, May 19, 2016, 09:25

IG1 = 3.4e-6 Torr

Tapped up manually to 35A

Vacuum stable.

IG1 = 3.5e-6 Torr.

Initiating auto-ramp.


 Wednesday, May 25, 2016, 13:05

Target has been heated at 460A, 4.5V for 5 hrs.

Vacuum at 6.4e-6 Torr. 

Initiated cool down at 1A/min. 


 Friday, May 27, 2016, 11:14

UCx done.

Vented in Ar and put in glove box yesterday.

Looked inside before inserting 2nd endcap - clean view all the way through the materials to the endcap/ not much visible shifting.

Ta coated spring helped hold materials in place.

Slightly darker markings on legs of container on side that was open in evap1.

2nd endcap put in.

Ready for assembly.


 

  133   Monday, July 11, 2016, 16:00 Laura LambertUC241790-3LP-SISDoneConditioning UCx#17

Monday, July 11, 2016, 15:54

Target container was previously coated with TaC spray and sintered.

Container is wrapped with 3 layers of Ta-heat shield, including the center block - new wrapping method-see elog112 evap2

The target consists of 216 discs of UCx with 7.6cm in length [4 packs of 5 + 196 single discs].

A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.

The right side is open with a TaC coated spring to help hold materials in.

The chamber is currently pumping down.

TGHT will be ramped up to 410A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog308 evap2]

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.


 Tuesday, July 12, 2016, 08:50

IG1 = 5.3e-6 Torr

Tapped up manually to 35A

Vacuum stable.

IG1 = 5.25e-6 Torr.

Initiating auto-ramp.


 Friday, July 15, 2016, 16:59

With evap2 not working, water was turned off to check valves...this tripped off evap1 since this also turned off the water to evap1.

TGHT was ~115A when evap1 tripped off.

Vacuum stable = 2.9e-6 Torr.

Tapped back up manually to 115A, 1.08V

Vacuum stable = 2.8e-6 Torr.

Restarting auto ramp at 0.1A/min.


 Friday, July 22, 2016, 16:25

Target has remained at max setpoints for 4.5days.

TGHT = 410A, 3.99V

IG1 = 2.5e-6 Torr

Voltage has wavered a small amount, between 3,91V-4.02V; this can be seen in the photo attached of the screenshot of the striptool.

Conditioning process is now complete.

Initiating auto-cool at 1.0A/min


 Tuesday, July 26, 2016, 16:48

Vented in Ar and currently transfering into glove box

will update elog tomorrow...


 Wednesday, July 27, 2016, 14:56

had a few problems with the transfer chamber in the glove box, but managed to get the target into the glove box okay last night.

was exposed to oxygen for minimal amount of time - transfer chamber wasnt flushing properly/ leak in james bond box


 

Attachment 1: trip-off.JPG
trip-off.JPG
Attachment 2: snapshot_of_striptool.JPG
snapshot_of_striptool.JPG
  138   Wednesday, October 19, 2016, 16:52 Laura LambertUC241790-6LP-SISDoneConditioning UCx#18

 Wednesday, October 19, 2016, 16:47

Target container was previously coated with TaC spray and sintered.

Container is wrapped with 3 layers of Ta-heat shield, including the center block using one single foil/ layer

The target consists of 165 discs of UCx with 5.4cm in length

Materials: 4 packs of 5 {all made with 'modified' UC2cast} + 145 single discs{20 from 'modified cast'}

A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.

The right side is open with a TaC coated spring to help hold materials in.

The chamber is currently pumping down.

TGHT will be ramped up to 430A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog327 evap2]

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.


Thursday, October 20, 2016, 10:11

Tapped up manually to 40A

Vacuum stable.

IG1 = 4.45e-6 Torr.

Initiating auto-ramp.


 Monday, October 24, 2016, 11:19

TGHT = 254A, 2.46V

Still ramping up...~half way to final setpoint

Vacuum dropped, looks good, IG1 = 6.77e-6 Torr


 Wednesday, October 26, 2016, 09:38

Target has remained at max setpoints for ~16hrs.

TGHT = 430A, 4.25V

IG1 = 2.3e-6 Torr

Conditioning/ re-carbonization process is now complete.

Initiating auto-cool at 1.0A/min


 Thursday, October 27, 2016, 15:35

UCx done.

Vented in Ar and transferred to glove box.

Looked inside before inserting 2nd endcap - clean view all the way through the materials to the endcap/ no visible shifting.

Ta coated spring helped hold materials in place, materials expanded minimally ~0.5cm

Pushed materials back to desired length.

Successfully removed a single disc for further analysis.

Second endcap now in with 2x graphite foils.

Both endcaps need expanding.

Ready for assembly.

Requires Rh foil - to be inserted during assembly.


 

  144   Thursday, February 16, 2017, 15:09 Laura LambertUC242218-12LP-SISDoneConditioning UCx#19

 Thursday, February 16, 2017, 15:04

Target container was previously coated with TaC spray and sintered.

Container is wrapped with 3 layers of Ta-heat shield, including the center block

The target consists of 200 discs of UCx with 7.3cm in length [6 packs of 5 + 170 single discs].

Discs in target are arranged as follows: 5singles / 1pack / 40singles / 1pack / 40singles / 2packs / 40singles / 1pack / 40singles / 1pack / 5singles

A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.

The right side is open with a TaC coated spring to help hold materials in.

The chamber is currently pumping down.

TGHT will be ramped up to 475A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog340 evap2]

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.

NOTE: small bug in evap1 IOC. when current is tapped up 1A, it auto-taps back down 0.01A. should be OK, but will keep an eye on evaporator during conditioning process and acct for changes.


 Friday, February 17, 2017, 09:56

IG1 = 1.56e-6 Torr

Tapped up manually to 35A

Vacuum stable.

IG1 = 1.56e-6 Torr.

Initiating auto-ramp.


 Friday, February 24, 2017, 15:09

Local TGHT 473 A 4.63 V


Monday, February 27, 2017, 09:06 

Target has remained at max setpoints for 20+hrs [epics problems and archives currently not working so unable to find out exact time]

TGHT = 475A, 4.67V

IG1 = 1.48e-6 Torr

Conditioning process is now complete.

Initiating auto-cool at 1.0A/min


 Tuesday, February 28, 2017, 12:00

UCx conditioning process complete.

Vented in Ar and transferred to glove box this morning.


 Tuesday, April 11, 2017, 09:44

A few photos taken of the target post-conditioning.

Note a few flakes came out from one end - end disc from 'open' side flaked off.


 

Attachment 1: IMG_1578.JPG
IMG_1578.JPG
Attachment 2: IMG_1587.JPG
IMG_1587.JPG
Attachment 3: IMG_1594.JPG
IMG_1594.JPG
Attachment 4: IMG_1598.JPG
IMG_1598.JPG
  146   Thursday, April 20, 2017, 11:41 Laura LambertUC242218-1LP-IG-LISDoneConditioning UCx#20

 Thursday, April 20, 2017, 11:31

Target container was previously coated with TaC spray and sintered.

Container is wrapped with 3 layers of Ta-heat shield, including the center block

The target consists of 220 discs of UCx with 7.55cm in length [6 packs of 5 + 190 single discs].

Discs in target are arranged as follows: 1pack / 45singles / 1pack / 50singles / 2packs / 50singles / 1pack / 45singles / 1pack

A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.

The right side is open with a TaC coated spring to help hold materials in.

The chamber is currently pumping down.

TGHT will be ramped up to 490A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog350 evap2]

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.


 Friday, April 21, 2017, 10:14

IG1 = 2.47e-6 Torr

Tapped up manually to 35A.

Waited ~1.5hrs, vacuum stable IG1 = 2.37e-6 Torr

Initiating auto-ramp.


 Thursday, April 27, 2017, 09:19

IG1 = 4.611e-6 Torr

TGHT = 490A, 4.93V

Target has remained at max setpoints for ~9hrs.

Initiating auto-cool at 1.0A/min


 Tuesday, May 16, 2017, 13:21

Update: 

Target looks good, see photos attached post sintering.

Gold tint on container commonly seen with the Uranium targets.

Orange colouring on inside of container end - also common.

Both endcaps in and handed off to assembly yesterday.


 

Attachment 1: 20170420_103410.jpg
20170420_103410.jpg
Attachment 2: 20170420_103516.jpg
20170420_103516.jpg
Attachment 3: 20170420_103154_Richtone(HDR).jpg
20170420_103154_Richtone(HDR).jpg
Attachment 4: 20170508_150816_Richtone(HDR).jpg
20170508_150816_Richtone(HDR).jpg
Attachment 5: 20170512_101150_Richtone(HDR).jpg
20170512_101150_Richtone(HDR).jpg
Attachment 6: 20170512_101348_Richtone(HDR).jpg
20170512_101348_Richtone(HDR).jpg
  155   Wednesday, July 12, 2017, 17:07 Laura LambertUC242218-15LP-SISIn progressConditioning UCx#21

 Wednesday, July 12, 2017, 17:06

Target container was previously coated with TaC and sintered.

Container is wrapped with 3 layers of Ta-heat shield, including the center block

The target consists of 400 discs of UCx with 13.60cm in length [8 packs of 5 + 360 single discs/ 2.6cm on left side, 2.8cm on right side wrt ionizer into page].

Discs in target are arranged as follows: 1pack / 60singles / 1pack / 60singles / 1pack / 60singles / 2packs / 60singles / 1pack / 60singles / 1pack / 60singles / 1pack

A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.

The right side is open with a TaC coated spring to help hold materials in.

The chamber is currently pumping down.

TGHT will be ramped up to 450A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog373 evap2]

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.


Thursday, July 13, 2017, 12:49

Tapped up manually to 35A.

Waited ~2hrs, vacuum stable: IG1 = 2.64e-6 Torr

Initiating auto-ramp.


 

  157   Thursday, July 13, 2017, 14:50 Laura LambertUC242218-15LP-SISProblemsConditioning UCx#21

Laura Lambert wrote:

 Wednesday, July 12, 2017, 17:06

Target container was previously coated with TaC and sintered.

Container is wrapped with 3 layers of Ta-heat shield, including the center block

The target consists of 400 discs of UCx with 13.60cm in length [8 packs of 5 + 360 single discs/ 2.6cm on left side, 2.8cm on right side wrt ionizer into page].

Discs in target are arranged as follows: 1pack / 60singles / 1pack / 60singles / 1pack / 60singles / 2packs / 60singles / 1pack / 60singles / 1pack / 60singles / 1pack

A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.

The right side is open with a TaC coated spring to help hold materials in.

The chamber is currently pumping down.

TGHT will be ramped up to 450A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog373 evap2]

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.


Thursday, July 13, 2017, 12:49

Tapped up manually to 35A.

Waited ~2hrs, vacuum stable: IG1 = 2.64e-6 Torr

Initiating auto-ramp.


 

 Thursday, July 13, 2017, 14:48

Update: auto-ramp not started.

With recent updates to evap1 epics, not everything was uploaded correctly.

TGHT auto-ramp system not working: parameter boxes have white outline indicating locked.

No parameters can be inputed and therefore unable to start auto-ramp.


 Friday, July 14, 2017, 15:56

Problems still not fixed.

Have tapped up manually to 50A, 0.59V

Vacuum stable; IG1 = 5.26e-6 Torr.

Will remain at setpoints over weekend before continuing to ramp up manually...


 Monday, July 17, 2017, 15:10

New problems:

Paddle wheels for evap2 need replacing asap [see elog evap2 i.d.378]

In order to replace, supply/ return need to be turned off and a full purge; therefore, evap1 must be off otherwise it will trip off from no water.

Evap2 needs to be fixed asap and cannot wait for this process to be complete.

Evap1 had been tapped up manually to 60A.

Tapping down manually to 0A so one can start the paddle wheel replacement work tomorrow.


 Tuesday, July 18, 2017, 15:31

Paddle wheels for evap2 replaced and up and running again.

IG1 = 1.2e-6 Torr.

Starting to tap back-up manually...


 

  158   Wednesday, July 19, 2017, 14:15 Laura LambertUC242218-15LP-SISProblems resolvedConditioning UCx#21

Laura Lambert wrote:

Laura Lambert wrote:

 Wednesday, July 12, 2017, 17:06

Target container was previously coated with TaC and sintered.

Container is wrapped with 3 layers of Ta-heat shield, including the center block

The target consists of 400 discs of UCx with 13.60cm in length [8 packs of 5 + 360 single discs/ 2.6cm on left side, 2.8cm on right side wrt ionizer into page].

Discs in target are arranged as follows: 1pack / 60singles / 1pack / 60singles / 1pack / 60singles / 2packs / 60singles / 1pack / 60singles / 1pack / 60singles / 1pack

A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.

The right side is open with a TaC coated spring to help hold materials in.

The chamber is currently pumping down.

TGHT will be ramped up to 450A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog373 evap2]

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.


Thursday, July 13, 2017, 12:49

Tapped up manually to 35A.

Waited ~2hrs, vacuum stable: IG1 = 2.64e-6 Torr

Initiating auto-ramp.


 

 Thursday, July 13, 2017, 14:48

Update: auto-ramp not started.

With recent updates to evap1 epics, not everything was uploaded correctly.

TGHT auto-ramp system not working: parameter boxes have white outline indicating locked.

No parameters can be inputed and therefore unable to start auto-ramp.


 Friday, July 14, 2017, 15:56

Problems still not fixed.

Have tapped up manually to 50A, 0.59V

Vacuum stable; IG1 = 5.26e-6 Torr.

Will remain at setpoints over weekend before continuing to ramp up manually...


 Monday, July 17, 2017, 15:10

New problems:

Paddle wheels for evap2 need replacing asap [see elog evap2 i.d.378]

In order to replace, supply/ return need to be turned off and a full purge; therefore, evap1 must be off otherwise it will trip off from no water.

Evap2 needs to be fixed asap and cannot wait for this process to be complete.

Evap1 had been tapped up manually to 60A.

Tapping down manually to 0A so one can start the paddle wheel replacement work tomorrow.


 Tuesday, July 18, 2017, 15:31

Paddle wheels for evap2 replaced and up and running again.

IG1 = 1.2e-6 Torr.

Starting to tap back-up manually...


 

 Wednesday, July 19, 2017, 14:12

TGHT auto-ramp fixed.

Since TBHT isn't hooked up yet, epics thinks TBHT has tripped off.

Currently during auto-ramp, every time steps up: states TBHT tripped off.

This is not the case but not a big deal as we will soon have TBHT hooked up and this won't be an issue.

Also it only states it, doesn't stop auto-ramp and therefore technically works fine/ will go with this for now...

Note: Might be a few spikes on striptool from past hour when IOC was rebooted.


 

  159   Wednesday, July 19, 2017, 14:17 Laura LambertUC242218-15LP-SISIn progressConditioning UCx#21

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Wednesday, July 12, 2017, 17:06

Target container was previously coated with TaC and sintered.

Container is wrapped with 3 layers of Ta-heat shield, including the center block

The target consists of 400 discs of UCx with 13.60cm in length [8 packs of 5 + 360 single discs/ 2.6cm on left side, 2.8cm on right side wrt ionizer into page].

Discs in target are arranged as follows: 1pack / 60singles / 1pack / 60singles / 1pack / 60singles / 2packs / 60singles / 1pack / 60singles / 1pack / 60singles / 1pack

A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.

The right side is open with a TaC coated spring to help hold materials in.

The chamber is currently pumping down.

TGHT will be ramped up to 450A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog373 evap2]

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.


Thursday, July 13, 2017, 12:49

Tapped up manually to 35A.

Waited ~2hrs, vacuum stable: IG1 = 2.64e-6 Torr

Initiating auto-ramp.


 

 Thursday, July 13, 2017, 14:48

Update: auto-ramp not started.

With recent updates to evap1 epics, not everything was uploaded correctly.

TGHT auto-ramp system not working: parameter boxes have white outline indicating locked.

No parameters can be inputed and therefore unable to start auto-ramp.


 Friday, July 14, 2017, 15:56

Problems still not fixed.

Have tapped up manually to 50A, 0.59V

Vacuum stable; IG1 = 5.26e-6 Torr.

Will remain at setpoints over weekend before continuing to ramp up manually...


 Monday, July 17, 2017, 15:10

New problems:

Paddle wheels for evap2 need replacing asap [see elog evap2 i.d.378]

In order to replace, supply/ return need to be turned off and a full purge; therefore, evap1 must be off otherwise it will trip off from no water.

Evap2 needs to be fixed asap and cannot wait for this process to be complete.

Evap1 had been tapped up manually to 60A.

Tapping down manually to 0A so one can start the paddle wheel replacement work tomorrow.


 Tuesday, July 18, 2017, 15:31

Paddle wheels for evap2 replaced and up and running again.

IG1 = 1.2e-6 Torr.

Starting to tap back-up manually...


 

 Wednesday, July 19, 2017, 14:12

TGHT auto-ramp fixed.

Since TBHT isn't hooked up yet, epics thinks TBHT has tripped off.

Currently during auto-ramp, every time steps up: states TBHT tripped off.

This is not the case but not a big deal as we will soon have TBHT hooked up and this won't be an issue.

Also it only states it, doesn't stop auto-ramp and therefore technically works fine/ will go with this for now...

Note: Might be a few spikes on striptool from past hour when IOC was rebooted.


 

 Wednesday, July 19, 2017, 14:16

Tapped up manually to 30A yesterday.

Continued manual tap up today and reached 60A.

Initiated auto-ramp.

IG1 = 4.4e-6 Torr


 

  160   Thursday, July 20, 2017, 15:00 Laura LambertUC242218-15LP-SISProblemsConditioning UCx#21

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Wednesday, July 12, 2017, 17:06

Target container was previously coated with TaC and sintered.

Container is wrapped with 3 layers of Ta-heat shield, including the center block

The target consists of 400 discs of UCx with 13.60cm in length [8 packs of 5 + 360 single discs/ 2.6cm on left side, 2.8cm on right side wrt ionizer into page].

Discs in target are arranged as follows: 1pack / 60singles / 1pack / 60singles / 1pack / 60singles / 2packs / 60singles / 1pack / 60singles / 1pack / 60singles / 1pack

A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.

The right side is open with a TaC coated spring to help hold materials in.

The chamber is currently pumping down.

TGHT will be ramped up to 450A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog373 evap2]

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.


Thursday, July 13, 2017, 12:49

Tapped up manually to 35A.

Waited ~2hrs, vacuum stable: IG1 = 2.64e-6 Torr

Initiating auto-ramp.


 

 Thursday, July 13, 2017, 14:48

Update: auto-ramp not started.

With recent updates to evap1 epics, not everything was uploaded correctly.

TGHT auto-ramp system not working: parameter boxes have white outline indicating locked.

No parameters can be inputed and therefore unable to start auto-ramp.


 Friday, July 14, 2017, 15:56

Problems still not fixed.

Have tapped up manually to 50A, 0.59V

Vacuum stable; IG1 = 5.26e-6 Torr.

Will remain at setpoints over weekend before continuing to ramp up manually...


 Monday, July 17, 2017, 15:10

New problems:

Paddle wheels for evap2 need replacing asap [see elog evap2 i.d.378]

In order to replace, supply/ return need to be turned off and a full purge; therefore, evap1 must be off otherwise it will trip off from no water.

Evap2 needs to be fixed asap and cannot wait for this process to be complete.

Evap1 had been tapped up manually to 60A.

Tapping down manually to 0A so one can start the paddle wheel replacement work tomorrow.


 Tuesday, July 18, 2017, 15:31

Paddle wheels for evap2 replaced and up and running again.

IG1 = 1.2e-6 Torr.

Starting to tap back-up manually...


 

 Wednesday, July 19, 2017, 14:12

TGHT auto-ramp fixed.

Since TBHT isn't hooked up yet, epics thinks TBHT has tripped off.

Currently during auto-ramp, every time steps up: states TBHT tripped off.

This is not the case but not a big deal as we will soon have TBHT hooked up and this won't be an issue.

Also it only states it, doesn't stop auto-ramp and therefore technically works fine/ will go with this for now...

Note: Might be a few spikes on striptool from past hour when IOC was rebooted.


 

 Wednesday, July 19, 2017, 14:16

Tapped up manually to 30A yesterday.

Continued manual tap up today and reached 60A.

Initiated auto-ramp.

IG1 = 4.4e-6 Torr


 

 Thursday, July 20, 2017, 14:48

TGHT tripped off yesterday evening 

Auto-ramping was fixed but a few more glitches in the system caused the TGHT to trip.

Please refer to photos.

When auto-ramp is running and vacuum reaches the parameter set for 'Good Vacuum', the auto-ramp should stop until the vacuum drops below the good vacuum at which point it can then continue to auto-ramp.

When auto-ramp is running and vacuum reaches the parameter set for 'Bad Vacuum', the auto-ramp should initiate auto-cool/ramp-down until the vacuum drops to the good vacuum parameter at which point it can then proceed with the 'Good Vacuum' requirement.

With this scenario, the auto-ramp system ignored the parameters set for good and bad vacuum, proceeded past both points and continued to ramp until the vacuum eventually reached it's trip off vacuum causing the TGHT to trip.

The TGHT current was at ~90A when it tripped off, so the target should be OK.


 

Attachment 1: Capture.JPG
Capture.JPG
Attachment 2: Capture3.JPG
Capture3.JPG
  161   Thursday, July 20, 2017, 15:35 Laura LambertUC242218-15LP-SISProblems resolvedConditioning UCx#21

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Wednesday, July 12, 2017, 17:06

Target container was previously coated with TaC and sintered.

Container is wrapped with 3 layers of Ta-heat shield, including the center block

The target consists of 400 discs of UCx with 13.60cm in length [8 packs of 5 + 360 single discs/ 2.6cm on left side, 2.8cm on right side wrt ionizer into page].

Discs in target are arranged as follows: 1pack / 60singles / 1pack / 60singles / 1pack / 60singles / 2packs / 60singles / 1pack / 60singles / 1pack / 60singles / 1pack

A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.

The right side is open with a TaC coated spring to help hold materials in.

The chamber is currently pumping down.

TGHT will be ramped up to 450A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog373 evap2]

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.


Thursday, July 13, 2017, 12:49

Tapped up manually to 35A.

Waited ~2hrs, vacuum stable: IG1 = 2.64e-6 Torr

Initiating auto-ramp.


 

 Thursday, July 13, 2017, 14:48

Update: auto-ramp not started.

With recent updates to evap1 epics, not everything was uploaded correctly.

TGHT auto-ramp system not working: parameter boxes have white outline indicating locked.

No parameters can be inputed and therefore unable to start auto-ramp.


 Friday, July 14, 2017, 15:56

Problems still not fixed.

Have tapped up manually to 50A, 0.59V

Vacuum stable; IG1 = 5.26e-6 Torr.

Will remain at setpoints over weekend before continuing to ramp up manually...


 Monday, July 17, 2017, 15:10

New problems:

Paddle wheels for evap2 need replacing asap [see elog evap2 i.d.378]

In order to replace, supply/ return need to be turned off and a full purge; therefore, evap1 must be off otherwise it will trip off from no water.

Evap2 needs to be fixed asap and cannot wait for this process to be complete.

Evap1 had been tapped up manually to 60A.

Tapping down manually to 0A so one can start the paddle wheel replacement work tomorrow.


 Tuesday, July 18, 2017, 15:31

Paddle wheels for evap2 replaced and up and running again.

IG1 = 1.2e-6 Torr.

Starting to tap back-up manually...


 

 Wednesday, July 19, 2017, 14:12

TGHT auto-ramp fixed.

Since TBHT isn't hooked up yet, epics thinks TBHT has tripped off.

Currently during auto-ramp, every time steps up: states TBHT tripped off.

This is not the case but not a big deal as we will soon have TBHT hooked up and this won't be an issue.

Also it only states it, doesn't stop auto-ramp and therefore technically works fine/ will go with this for now...

Note: Might be a few spikes on striptool from past hour when IOC was rebooted.


 

 Wednesday, July 19, 2017, 14:16

Tapped up manually to 30A yesterday.

Continued manual tap up today and reached 60A.

Initiated auto-ramp.

IG1 = 4.4e-6 Torr


 

 Thursday, July 20, 2017, 14:48

TGHT tripped off yesterday evening 

Auto-ramping was fixed but a few more glitches in the system caused the TGHT to trip.

Please refer to photos.

When auto-ramp is running and vacuum reaches the parameter set for 'Good Vacuum', the auto-ramp should stop until the vacuum drops below the good vacuum at which point it can then continue to auto-ramp.

When auto-ramp is running and vacuum reaches the parameter set for 'Bad Vacuum', the auto-ramp should initiate auto-cool/ramp-down until the vacuum drops to the good vacuum parameter at which point it can then proceed with the 'Good Vacuum' requirement.

With this scenario, the auto-ramp system ignored the parameters set for good and bad vacuum, proceeded past both points and continued to ramp until the vacuum eventually reached it's trip off vacuum causing the TGHT to trip.

The TGHT current was at ~90A when it tripped off, so the target should be OK.


 

 Thursday, July 20, 2017, 15:14

Turns out the auto-ramp was reading the vacuum of 'IGP1' which is what the old ion gauge used to be called for evap1 and is currently one on evap2

AKA attempting to take a vacuum reading from one that doesn't exist for evap1

This ion gauge is now labelled 'IGP' and the auto-ramp system now uses 'IGP' for the vacuum parameter confirmations.

Changed a few things in the auto-ramp system:

-Updated messages.

-Auto-ramp aborts when TGHT/TBHT trips off.

-Displays setpoint it is ramping up to for next step

-Confirms which ion gauge it is reading

-Displays final setpoint and increment on message board

-No longer displays TBHT as 'tripped off' when not running.

System updated.


 

  162   Thursday, July 20, 2017, 15:57 Laura LambertUC242218-15LP-SISDoneConditioning UCx#21

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Wednesday, July 12, 2017, 17:06

Target container was previously coated with TaC and sintered.

Container is wrapped with 3 layers of Ta-heat shield, including the center block

The target consists of 400 discs of UCx with 13.60cm in length [8 packs of 5 + 360 single discs/ 2.6cm on left side, 2.8cm on right side wrt ionizer into page].

Discs in target are arranged as follows: 1pack / 60singles / 1pack / 60singles / 1pack / 60singles / 2packs / 60singles / 1pack / 60singles / 1pack / 60singles / 1pack

A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.

The right side is open with a TaC coated spring to help hold materials in.

The chamber is currently pumping down.

TGHT will be ramped up to 450A at 0.1A/min [same current used to reach 1900C in evap2 when sintering TaC coating - elog373 evap2]

Parameter setup: 5.0e-5 good vac, 6.0e-5 bad vac.


Thursday, July 13, 2017, 12:49

Tapped up manually to 35A.

Waited ~2hrs, vacuum stable: IG1 = 2.64e-6 Torr

Initiating auto-ramp.


 

 Thursday, July 13, 2017, 14:48

Update: auto-ramp not started.

With recent updates to evap1 epics, not everything was uploaded correctly.

TGHT auto-ramp system not working: parameter boxes have white outline indicating locked.

No parameters can be inputed and therefore unable to start auto-ramp.


 Friday, July 14, 2017, 15:56

Problems still not fixed.

Have tapped up manually to 50A, 0.59V

Vacuum stable; IG1 = 5.26e-6 Torr.

Will remain at setpoints over weekend before continuing to ramp up manually...


 Monday, July 17, 2017, 15:10

New problems:

Paddle wheels for evap2 need replacing asap [see elog evap2 i.d.378]

In order to replace, supply/ return need to be turned off and a full purge; therefore, evap1 must be off otherwise it will trip off from no water.

Evap2 needs to be fixed asap and cannot wait for this process to be complete.

Evap1 had been tapped up manually to 60A.

Tapping down manually to 0A so one can start the paddle wheel replacement work tomorrow.


 Tuesday, July 18, 2017, 15:31

Paddle wheels for evap2 replaced and up and running again.

IG1 = 1.2e-6 Torr.

Starting to tap back-up manually...


 

 Wednesday, July 19, 2017, 14:12

TGHT auto-ramp fixed.

Since TBHT isn't hooked up yet, epics thinks TBHT has tripped off.

Currently during auto-ramp, every time steps up: states TBHT tripped off.

This is not the case but not a big deal as we will soon have TBHT hooked up and this won't be an issue.

Also it only states it, doesn't stop auto-ramp and therefore technically works fine/ will go with this for now...

Note: Might be a few spikes on striptool from past hour when IOC was rebooted.


 

 Wednesday, July 19, 2017, 14:16

Tapped up manually to 30A yesterday.

Continued manual tap up today and reached 60A.

Initiated auto-ramp.

IG1 = 4.4e-6 Torr


 

 Thursday, July 20, 2017, 14:48

TGHT tripped off yesterday evening 

Auto-ramping was fixed but a few more glitches in the system caused the TGHT to trip.

Please refer to photos.

When auto-ramp is running and vacuum reaches the parameter set for 'Good Vacuum', the auto-ramp should stop until the vacuum drops below the good vacuum at which point it can then continue to auto-ramp.

When auto-ramp is running and vacuum reaches the parameter set for 'Bad Vacuum', the auto-ramp should initiate auto-cool/ramp-down until the vacuum drops to the good vacuum parameter at which point it can then proceed with the 'Good Vacuum' requirement.

With this scenario, the auto-ramp system ignored the parameters set for good and bad vacuum, proceeded past both points and continued to ramp until the vacuum eventually reached it's trip off vacuum causing the TGHT to trip.

The TGHT current was at ~90A when it tripped off, so the target should be OK.


 

 Thursday, July 20, 2017, 15:14

Turns out the auto-ramp was reading the vacuum of 'IGP1' which is what the old ion gauge used to be called for evap1 and is currently one on evap2

AKA attempting to take a vacuum reading from one that doesn't exist for evap1

This ion gauge is now labelled 'IGP' and the auto-ramp system now uses 'IGP' for the vacuum parameter confirmations.

Changed a few things in the auto-ramp system:

-Updated messages.

-Auto-ramp aborts when TGHT/TBHT trips off.

-Displays setpoint it is ramping up to for next step

-Confirms which ion gauge it is reading

-Displays final setpoint and increment on message board

-No longer displays TBHT as 'tripped off' when not running.

System updated.


 

Thursday, July 20, 2017, 15:57

Tapped up manually to 35A, 0.45V

IG1 = 5.26e-6 Torr

Re-initiated auto-ramp at 0.1A/min.


 Friday, July 21, 2017, 13:50

TGHT = 81A, 0.92V

IG1 = 5.2e-5 Torr

Vacuum currently yo-yo-ing, but stable.

Changing vacuum limits.

Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.

TP = 28.4C, RT = 27.3C


 Thursday, July 27, 2017, 09:02

TGHT = 431A, 4.37V

IG1 = 1.32e-5 Torr

Vacuum stable.

Increasing ramping rate to 0.2A/min

TP = 26.7C, RT = 22.0C


 Friday, July 28, 2017, 09:35

TGHT = 450A, 4.59V

IG1 = 5.4e-6 Torr

Target has remained at max setpoint for 23hrs.

TP = 25.9C, RT = 19.5C

Initiating auto-cool at 1.0A/min


 Friday, August 04, 2017, 13:59

Evap1 was vented in Ar and transferred to the glove box on monday.

A few discs on opened end had slightly shifted [see photo], discs moved back in place - can see down into target.

Discoloration of Ta container to gold in some spots - this is normal as seen with most UCx targets

Target looks good.

Still requires 2nd endcap to be inserted.


 Monday, August 21, 2017, 11:13

Both endcaps in.

No Rh foil inserted.

Endcaps require expanding.


 

Attachment 1: IMG_3249.JPG
IMG_3249.JPG
Attachment 2: IMG_3251.JPG
IMG_3251.JPG
Attachment 3: IMG_3257.JPG
IMG_3257.JPG
Attachment 4: IMG_3258.JPG
IMG_3258.JPG
Attachment 5: IMG_3260.JPG
IMG_3260.JPG
  198   Tuesday, March 20, 2018, 14:52 Laura LambertUC242218-13LP-SISDoneConditioning UCx#22

 Tuesday, March 20, 2018, 14:43

Target container was previously coated with TaC and sintered.

Container is wrapped with 3 layers of Ta-heat shield, including the center block

The target consists of 230 discs of UCx with 7.28cm in length [6 packs of 5 + 200 single discs].

Discs in target are arranged as follows: 1pack / 55singles / 1pack / 50singles / 2packs / 50singles / 1pack / 45singles / 1pack

A regular TaC coated endcap is inserted left, wrt the ionizer tube pointing down.

The right side is open with a TaC coated spring to help hold materials in.

An extra 5 single discs are loaded on the right side on top of the last pack, these discs will be removed after conditioning and analysed using SEM and XRD

The chamber is currently pumping down.

TGHT will be ramped up to 445A and TBHT will be ramped up to 230A [same parameters used to reach 1900C in evap2 when sintering TaC coating - elog402 evap2]

NOTE: This will be the first UCx target to go online using the TBHT in evap1 after the target is loaded with materials.


 Wednesday, March 21, 2018, 09:37

IGP1 = 2.47e-6 Torr

Tapped up manually to 40A.

TGHT = 40A, 0.61V

TBHT = 40A, 0.78V

Waited ~1hr, vacuum stable IG1 = 9.3e-6 Torr

Initiating auto-ramp for TGHT at a rate of 0.2A/min

Initiating auto-ramp for TBHT at a rate of 0.1A/min

Parameter setup: 5.0e-5 good vac, 8.0e-5 bad vac.


Wednesday, March 21, 2018, 13:02

TGHT = 57A, 0.72V

TBHT = 48A, 0.85V

IG1 = 5.8e-5 Torr

Vacuum stable.

Changing vacuum limits.

Vacuum limit stop at 3.0e-4 Torr, backing off at 6.0e-4 Torr.


 Monday, March 26, 2018, 09:32

TGHT = 450A, 4.54V

TBHT = 230A, 2.75V

IGP1 = 8.99e-7 Torr

Target has remained at max setpoint over weekend.

Initiating auto-cool at 1.0A/min for the TGHT and 0.5A/min for the TBHT.


 Wednesday, March 28, 2018, 11:31

Evap1 was vented in Ar and transferred to the glove box yesterday.

Inspection of target still required as well as 2nd endcap to be inserted.


 

  204   Friday, May 11, 2018, 12:36 Marla CervantesUC241369-2LP-SISDoneUCx Fully loaded graphite insert thermal test - FL#1

 Thursday, May 10, 2018, 16:00 

Graphite insert fully loaded with UCx was loaded into previously TaC coated target container.

No end caps on Ta target container.

Weight of graphite tube + UCx discs = 27 g

Currently pumping down in evap1.


Friday, May 11, 2018, 11:41 

IGP1 = 1.13e-6 Torr

Good vac at 3.0e-4, bad vac at 6.0e-4 Torr.

Tapped up manually to 100A.

Pressure increased to ~2e-5 Torr

Vacuum stabilized after 40 min

IGP1 = 1e-5 Torr

Initiating auto ramp for TGHT @ 20 A/min to a max setpoint of 520 A

Initiating auto ramp for TBHT @ 10 A/min to a max setpoint of 245 A

Preassure increased o 1e-4 Torr and the auto ramp was aborted

After 8 min IGP1 = 3e-5 Torr

Initiating auto ramp for TGHT @ 10 A/min to a max setpoint of 520 A

Initiating auto ramp for TBHT @ 5 A/min to a max setpoint of 245 A

The vacuum is more stable.

TBHT reached 230 A at 13:00

TGHT reached 520 A at 13:24

Final pressure 1.15e-4 Torr

Target will stay at max current point for a week.


 Friday, May 18, 2018, 13:01
 
IGP1 = 8.03e-7 Torr
 
TGHT 5.67 V, 519.3 A
 
TBHT 2.59 V, 228.3 A
 
Initiation auto cool at  TGHT  -5 A/min
 
Initiation auto cool at  TBHT  -2 A/min
 
Friday, May 18, 2018, 13:58
 
Accelerating auto cool   TGHT  -10 A/min
 
Accelerating auto cool at  TBHT  -5 A/min

 Friday, May 18, 2018, 18:31

Evap1 was vented in Ar and UCx target was transferred to the glove box

Attachment 1: 180511-FL1_520A.png
180511-FL1_520A.png
  207   Monday, June 04, 2018, 11:29 Marla CervantesUC240282-1TARGET BOATDoneConditioning B13 and 2sc

 Friday, June 01, 2018, 11:20

Target boat was previously coated with TaC and sintered.

Two small C-inserts of ~2cm length were placed on Ta boat

Sample 1-sc: 15 discs of cast 3 made with 1-step cast method (UCx+foil 1.437 g)

Sample 2-sc: 24 discs from rejected discs of 2-step casting (UCx+foil 1.585 g)

Ta boat was wrapped with 3 layers of Ta-heat shield

The chamber is currently pumping down.

TGHT will be ramped up to 495A [same parameters used to reach 1910C in evap2 when sintering TaC coating - elog410 evap2]


Monday, June 04, 2018, 11:27 

IG1 = 4e-7 Torr

Tapped up manually to 35A

Waited 1hr

Vacuum stable.

IG1 = 8.02e-7 Torr.

Initiating auto-ramp (0.1 A/min) up to 80 A


 Tuesday, June 07, 2018, 15:47

Vacuum stable

IG1 = 7.02e-7 Torr.

Changing auto-ramp to 0.02 A/min up to 140 A


Thursday, June 07, 2018, 15:49 

Vacuum stable 5.5e-7 Torr

Current 139 A, voltage 1.25 V

Changing auto-ramp to 0.1 A/min up to 495 


Saturday, June 9, 2018, 10:41 

The material stayed 4 hours at 495 A

Auto-ramp set to -1 A/min down to 0 A 


Monday, June 11, 2018, 17:43 

EVAPI was vented with Ar and UCx was transferred to glove box

 

 

 

  213   Thursday, July 05, 2018, 13:43 John WongUC2 HP-FEBIAD-CTLDoneConditioning UCx#23

Thursday, July 05, 2018, 13:24

Target container was previously coated and sintered with TaC, also wrapped with Ta heat shields (see Evap2 elog# 410).

Loaded 201 discs of UCx with 7.27 cm in length + 5 extra discs for QC samples. 

One end-cap (coated/sintered TaC) inserted right, wrt the ionizer tube pointing down.

Left side is OPEN; a spring is inserted to hold the discs in place.

Chamber is currently being pumped down. 

TGHT will be ramped up to 495A/8.85V and TBHT to 230A/3.26V (same parameters used for sintering the container, evap2 elog#410).

 

Vacuum initial setting:

Good Vac = 5.0 e-5 Torr, Bad vac = 8.0 e-5 Torr.

pressure level will be monitored accordingly...

 

Auto-ramping setting

TGHT: 60 wait time, 0.2A/min, final 495A

TGHT: 60 wait time, 0.2A/min, final 230A.

 


 Thursday, July 05, 2018, 16:50

Tapping up TGHT to 40 A/0.49 V and TGHT to 40A/0.64V.

Vac slowly increasing from 5.0 e-6 Torr. 

Initiate auto-heating


 Tuesday, July 10, 2018, 10:46

Holding TGHT at 495A/5.3V for over 25 hours.  Pressure at 2.9e-6 Torr.

Initiate autocooling TGHT at 2A/min, TBHT 1.0A/min


 Wednesday, July 11, 2018, 17:12

Target was removed from the Evap; it is now in the Ar glovebox.  End cap is inserted. 

Target is ready for installation.


 

  215   Friday, August 03, 2018, 17:49 John WongUC2 LP-SISIn progressConditioning UCx#24

Friday, August 03, 2018, 17:44

Target consists of 230 UCx discs, total packing length of 7.1cm. 

Container was previously coated/sintered with TaC (see elog #415) in Evap#2 with TGHT set to 450A/7.5V and TBHT 230A/4.2

Vacuum initial setting:

Good Vac = 5.0 e-5 Torr, Bad vac = 8.0 e-5 Torr.

pressure level will be monitored accordingly...

 

Auto-ramping setting

TGHT: 60 wait time, 0.2A/min, final 450A

TGHT: 60 wait time, 0.2A/min, final 230A.

 

Chamber is currently being pumped down.Good


 Monday, August 06, 2018, 00:04

Pressure at 3.6e-6 Torr. 

Initiate autoramping.


 Friday, August 10, 2018, 11:02

TGHT/TBHT have been at 450A(4.5V)/230A(2.9) for over 15 hours.

Pressure is stabilized at 5.2e-6 Torr. 

Initiated auto-cooling at 2A/min for TGHT and 1A/min for TBHT.


 

  216   Friday, August 17, 2018, 11:23 Marla CervantesUC2NA DoneUCx 1-step casting -Oxidation test

 Friday, August 17, 2018, 11:17

Four discs of UCx produced with the 1-step casting method were placed in a glass jar.

The mass of the discs was 0.400 g.

The glass jar with the discs were placed in the heating chamber of the IEVAP.

Currently IEVAP is pumping down until vacuum is in the order of  ~10^-6 Torr.


Friday, August 17, 2018, 16:28 

Final vacuum: 9.5x10^-6 Torr

IEVAP's heating chamber will be vented with air and the materials will be taken out.


 Friday, August 17, 2018, 17:27

Material was transferred to the glove box


 