  40   Thursday, September 22, 2011, 20:34 John WongEmpty38634-9LP-SISDoneSintering TaC coating for UCx#2 (spare) Thursday, September 22, 2011, 20:21
Target oven was wrapped with 3 Ta-heat
shields and has been pumping down.
  
  41   Thursday, September 29, 2011, 10:58 John WongUO2/CUCx-heatboat#2 DoneUCx#3: Batch#1 - UO2/C mixture of carbonization Thursday, September 29, 2011, 10:54
UO2/C mixture was made on Tuesday
Sept 27, casted on a piece of glass and let
 6x 
  42   Thursday, October 06, 2011, 12:22 John WongUO2/CUCx-heatboat#2 DoneUCx#3: Batch#2 - UO2/C mixture of carbonization  Thursday, October 06, 2011, 12:19
 
 UCx#3_batch#2_tripped@40A.jpgUCx#3_batch#2_TGHT@317A.JPGUO2_C_batch#2_Archive_overall_process.JPG 
  43   Thursday, November 03, 2011, 09:24 John WongUC238634-10LP-SISDoneUCx#3: Final conditioning Thursday, November 03, 2011, 08:59
Target was previously coated/sintered
with TaC & wrapped with 3 Ta-heat shields,
 auto_heating_failed.jpgEvap1_TGHT_problem.jpgEvpr_org_burnout_01.jpgEvpr_org_burnout.jpgarchive_overall_process.JPG 
  44   Monday, November 14, 2011, 11:56 Peter Kunz UC238634-10LP-SISDoneUCx03: Conditioning up to 175AEvaporator was cleaned Nov 11 from after
target was conditioned up to 175A. There
was significant condensation of oily fluid
 0--0009.jpg0--0011.jpg 
  45   Tuesday, February 14, 2012, 21:56 John WongUO238481-9LP-FEBIADDoneUO2/Nb sintering process Tuesday, February 14, 2012, 20:58
Evaporator is setup for UO2/Nb sintering
process.  
 Screen_shot_2012-02-14_at_9.00.04_PM.pngUO2_Nb_1_striptool.jpg 
  46   Thursday, April 05, 2012, 16:47 John WongEmpty38817-3HP-SISDoneCoating target oven /w TaC & sinteringThursday, April 05, 2012, 16:43
Target oven is coated with TaC. 
The oven is wrapped with 3 Ta-heat shields.
 Targetoven_TaCsintered_archive.JPG 
  47   Tuesday, May 08, 2012, 07:42 John WongSiC38817-3HP-SISDoneSintering SiCTuesday, May 08, 2012, 07:32
Target oven is filled with 240 discs
of SiC/C, and wrapped with 3 Ta-foils.
 TGHT_0_270A.pngSiC#27_0-820A.JPG 
  49   Wednesday, June 06, 2012, 16:58 John WongUO2/CUCx-heatboat#2 DoneUC2 flakes for UCx#4: batch#01-04062012Wednesday, June 06, 2012, 16:55
The UO2/C green was prepared on June
04, 2012. 
 7x 
  55   Tuesday, July 10, 2012, 12:54 John WongUC238634-9LP-SISDoneUCx#4 final conditioning completedTuesday, July 10, 2012, 12:44
Target contains 230 discs of UCx
(material from UC2 flakes, batch#01-04062012). 
 TGHT_0-175_orgburnoff.GIFUCx#4_final_conditioning_0-520A.PNG 
  56   Thursday, July 19, 2012, 17:14 John WongUO2/CTarget boat #2 DoneProcessing UC2 flakes for UCx#5 - (batch#02-13062012)Thursday, July 19, 2012, 17:09
UO2/C green was prepared on June
13, 2012. 
 TGHT_100A.pngUC2_flakes_0-520A.GIF 
  63   Tuesday, April 02, 2013, 17:46 John WongUO2/CTarget boat #2 DoneProcessing UC2 flakes for UCx#6 (batch#03 - 02042013)Tuesday, April 02, 2013, 17:25
UO2/C green was prepared on Mar 11,
2013.
  
  64   Monday, May 06, 2013, 14:34 John WongUO2/CTarget boat #2 DoneProcessing UC2 flakes (batch#04 - 05032013) Monday, May 06, 2013, 14:29
UO2/C green was prepared on May 2,
2013 and let dry over the weekend.
 UC2_flakes_batch#04-05032013.PNG 
  65   Thursday, May 30, 2013, 16:25 John WongUC239165-6LP-SISDoneConditioning UCx#06Thursday, May 30, 2013, 16:16
The target container was previously
coated with TaC and sintered in Evap 2.
 UCx#6_conditioning_stage1.PNG 
  66   Wednesday, June 05, 2013, 16:52 Laura LambertUC239165-6LP-SISDoneConditioning UCx#06

    

       
            
 UCx#6_conditioningstage1.PNG 
  67   Thursday, June 06, 2013, 16:56 John WongUC239165-6LP-SISDoneConditioning UCx#06

    

       
            
 UCx#6_final_conditioning.PNG 
  68   Tuesday, June 25, 2013, 14:49 Laura LambertUO2/CTarget boat #2 DoneProcessing UC2 flakes (batch#05 - 18062013) Tuesday, June 25, 2013, 14:35
UO2/C green was prepared on June
18, 2013 and let dry over the weekend.
  
  69   Tuesday, June 25, 2013, 16:28 John WongUO2/CTarget boat #2 DoneProcessing UC2 flakes (batch#05 - 18062013)

    

       
            
  
  70   Tuesday, July 02, 2013, 11:13 Peter Kunz UO2/CTarget boat #2 DoneProcessing UC2 flakes (batch#05 - 18062013) 
1. stage - burning off organics complete
2. stage - carbonization began 1-8
 UO2-C-01.png 
  71   Thursday, July 11, 2013, 16:22 John WongUO2/CTarget boat #2 DoneProcessing UC2 flakes (batch#05 - 18062013)

    

       
            
  