205
|
Friday, May 18, 2018, 18:38 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container #13 | Friday, May 18, 2018, 18:32
35 circles of 14 mm diameter |
|
|
206
|
Friday, May 25, 2018, 15:38 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Done | Carbonizing full length 1-step UCx target #2 | Friday,
May 25, 2018, 15:34
|
|
|
208
|
Wednesday, June 13, 2018, 10:20 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | In progress | Carbonizing UO2/C discs for 1stepUCx in graphite sample container #14 | Tuesday, June 12, 2018, 18:20
35 circles of 14 mm |
|
|
209
|
Wednesday, June 13, 2018, 11:09 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Problems | Carbonizing UO2/C discs for 1stepUCx in graphite sample container #14 |
|
|
|
210
|
Wednesday, June 13, 2018, 12:25 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container #14 |
|
|
|
211
|
Tuesday, June 19, 2018, 15:39 |
Marla Cervantes | UO2/C | 40282-1 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container #15 | Friday, June 15, 2018, 16:39
35 circles of 14 mm |
|
|
214
|
Wednesday, July 11, 2018, 17:44 |
John Wong | UO2/C | | TARGET BOAT | Done | Processing UC2Flk_21 | Wednesday, July 11, 2018, 17:41
Cast prepared by Marla (see note
in Hotlab) |
|
|
219
|
Saturday, September 29, 2018, 19:04 |
John Wong | UO2/C | | TARGET BOAT | In progress | Processing UC2_flk_22 | Saturday, September 29, 2018, 18:52
Cast is from Jar#1. (see process
sheet for details) |
|
|
222
|
Monday, October 22, 2018, 17:58 |
Marla Cervantes | UO2/C | 27252-1 | TARGET BOAT | Problems | Processing UC2Flk_22 | Monday, October 22, 2018, 17:55
UO2/C green was prepared , September |
|
|
226
|
Wednesday, October 24, 2018, 20:01 |
Marla Cervantes | UO2/C | 27252-1 | TARGET BOAT | Problems | Processing UC2Flk_22 |
|
|
|
227
|
Thursday, October 25, 2018, 09:10 |
Marla Cervantes | UO2/C | 27252-1 | TARGET BOAT | Done | Processing UC2Flk_22 |
|
|
|
231
|
Thursday, November 22, 2018, 17:32 |
Marla Cervantes | UO2/C | 40202-1 | TARGET BOAT | Problems | UCx Fully loaded graphite insert - UCx26 | Thursday, November 22, 2018, 17:25
D-shaped discs were cut from |
|
|
232
|
Monday, November 26, 2018, 17:06 |
Marla Cervantes | UO2/C | 40202-1 | TARGET BOAT | Done | UCx Fully loaded graphite insert - UCx26 |
|
|
|
239
|
Monday, June 17, 2019, 08:58 |
Marla Cervantes | UO2/C | | TARGET BOAT | Done | UCx#27 Carbothermal reduction | Friday, June 14, 2019, 17:10
A 14 mm die was used to cut |
|
|
240
|
Tuesday, July 30, 2019, 10:27 |
Marla Cervantes | UO2/C | | TARGET BOAT | Done | UCx#28 Carbothermal reduction | Friday,
June 26, 2019, 17:10
|
|
|
246
|
Wednesday, October 02, 2019, 11:10 |
Marla Cervantes | UO2/C | | TARGET BOAT | Done | UCx#29 Carbothermal reduction | Wednesday, October 02, 2019, 11:09
A graphite cartridge loaded with
UO2/C foils, wrapped with three Ta heat shields |
|
|
248
|
Monday, October 28, 2019, 11:23 |
Marla Cervantes | UO2/C | | TARGET BOAT | In progress | UCx#30 Carbothermal Reduction | Monday, October 28, 2019, 10:29
A loaded graphite cartridge was set
in a tantalum boated and wrapped with 3 tantalum |
|
|
249
|
Thursday, October 31, 2019, 13:59 |
Marla Cervantes | UO2/C | | TARGET BOAT | Problems | UCx#30 Carbothermal Reduction |
|
|
|
254
|
Thursday, January 30, 2020, 09:37 |
Marla Cervantes | UO2/C | P2N-02 | | In progress | P2N target material carbothermal reduction | Wednesday, January 29 2020, 05:55
A P2N container with |
|
|
255
|
Thursday, January 30, 2020, 10:15 |
Marla Cervantes | UO2/C | P2N-02 | | Problems | P2N target material carbothermal reduction |
|
|