39
|
Wednesday, September 21, 2011, 13:23 |
John Wong | Empty | 38634-10 | LP-SIS | Done | Sintering TaC coating on target oven for UCx#3 | Wednesday, September 21, 2011, 13:23
Target oven was wrapped with 3-Ta
heatshields including the back block. |
|
37
|
Monday, September 12, 2011, 13:08 |
John Wong | Empty | Target Boat | | Done | Sintering TaC coating on End Caps | Monday, September 12, 2011, 13:07
Target boat is loaded with coated
TaC end caps for sintering. Target |
|
40
|
Thursday, September 22, 2011, 20:34 |
John Wong | Empty | 38634-9 | LP-SIS | Done | Sintering TaC coating for UCx#2 (spare) | Thursday, September 22, 2011, 20:21
Target oven was wrapped with 3 Ta-heat
shields and has been pumping down. |
|
25
|
Monday, July 18, 2011, 15:55 |
John Wong | Empty | 38634-3 | LP-SIS | Done | Sintering TaC coating for UCx#2 | Monday, July 18, 2011, 15:53: Target
oven was coated with TaC and let dry over
the weekend. The target is now installed |
|
27
|
Wednesday, August 03, 2011, 17:16 |
John Wong | Empty | 38634-8 | LP-SIS | Done | Sintering TaC coating | Wednesday, August 03, 2011, 20:27 : Target
was wrapped with 3 new Ta-heat shields and
2 around the back block. The tar from |
|
36
|
Friday, September 09, 2011, 10:05 |
John Wong | Empty | | HP-FEBIAD | Done | Sintering TaC coating | Friday, September 09, 2011, 10:05
Target oven coated with TaC, and
wrapped with 3-Ta heat shields. Chamber |
|
134
|
Tuesday, August 23, 2016, 17:35 |
John Wong | | | TARGET BOAT | | Sintering TaC coated target boat | Tuesday, August 23, 2016, 17:33
Target boat coated with TaC (sprayed)
and wrapped with Ta-heat shield. |
|
85
|
Thursday, January 23, 2014, 16:29 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | In progress | Sintering Ta target boat with TaC coating | Thursday, January 23, 2014, 16:26
A new target boat was sprayed
with TaC coating and let dry, the coating |
|
86
|
Friday, January 24, 2014, 14:45 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | In progress | Sintering Ta target boat with TaC coating |
|
|
87
|
Monday, January 27, 2014, 11:03 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | Done | Sintering Ta target boat with TaC coating |
|
|
47
|
Tuesday, May 08, 2012, 07:42 |
John Wong | SiC | 38817-3 | HP-SIS | Done | Sintering SiC | Tuesday, May 08, 2012, 07:32
Target oven is filled with 240 discs
of SiC/C, and wrapped with 3 Ta-foils. |
|
62
|
Thursday, October 25, 2012, 15:03 |
John Wong | BeO | Ta-target boat (old) | | In progress | Sintering BeO pellets #5 - testing Re foil as the protective under layer | Thursday, October 25, 2012, 14:50
Previous sintering BeO tests, pellets
1 to 4 were done in Evaporator#2. |
|
234
|
Tuesday, March 26, 2019, 08:58 |
Aaron Schmidt | | | | Maintenance | Roughing pump oiled. | Oiled as per work permit: |
|
119
|
Saturday, August 29, 2015, 16:12 |
Anders Mjos | | | | Problems | Restarting vacuum after power outage | Saturday, August 29, 2015, 16:10: Roughing
Saturday, August 29, 2015, 16:10:
Starting turbo |
|
28
|
Thursday, August 04, 2011, 17:46 |
John Wong | UC2 | 38634-8 | LP-SIS | Problems resolved | Repacking UCx in new target oven | Thursday, August 04, 2011, 17:44:
All the UCx material from target oven 38634-3
was recovered and repacked in this new oven. |
|
38
|
Tuesday, September 13, 2011, 16:53 |
John Wong | SiC | 38295-9 | HP-FEBIAD | Done | Ready | Tuesday, September 13, 2011, 16:51
Target is wrapped with 3-Ta heat
shields. |
9x |
89
|
Tuesday, March 04, 2014, 15:48 |
John Wong | | | TARGET BOAT | In progress | Re-sinterring end caps | Tuesday, March 04, 2014, 15:43
Theses endcaps (4) were previously
sinterred in Evap#2 but some surfaces were |
|
90
|
Wednesday, March 05, 2014, 10:30 |
Laura Lambert | | | TARGET BOAT | In progress | Re-sinterring end caps |
|
|
91
|
Wednesday, March 05, 2014, 23:05 |
John Wong | | | TARGET BOAT | Done | Re-sinterring end caps |
|
|
35
|
Wednesday, September 07, 2011, 15:40 |
Anders Mjos | Empty | | | Maintenance | Re-sealing of Glove Box | 2011-09-01:
Glove box was leaking
(air/argon) between base and box. Light was |
|