Friday, May 18, 2018, 18:38, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container #13
|
Friday, May 18, 2018, 18:32
35 circles of 14 mm diameter of cast #3 were packed into a graphite sample container.
40 x UO2/C circles = 4.58 g |
Friday, May 25, 2018, 15:38, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Done, Carbonizing full length 1-step UCx target #2
|
Friday, May 25, 2018, 15:34
D-shaped discs were cut from cast 3
A 13mm punch was used to punch out discs from pre-cut strips using the old method. |
Wednesday, June 13, 2018, 10:20, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, In progress, Carbonizing UO2/C discs for 1stepUCx in graphite sample container #14
|
Tuesday, June 12, 2018, 18:20
35 circles of 14 mm diameter of cast #4 were packed into a graphite sample container.
30 x UO2/C circles = 4.07 g |
Wednesday, June 13, 2018, 11:09, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Problems, Carbonizing UO2/C discs for 1stepUCx in graphite sample container #14
|
Marla Cervantes wrote:
Tuesday, June 12, 2018, 18:20 |
Wednesday, June 13, 2018, 12:25, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container #14
|
Marla Cervantes wrote:
|
Tuesday, June 19, 2018, 15:39, Marla Cervantes, UO2/C, 40282-1, TARGET BOAT, Done, Carbonizing UO2/C discs for 1stepUCx in graphite sample container #15
|
Friday, June 15, 2018, 16:39
35 circles of 14 mm diameter of cast #3 were packed into a graphite sample container.
35 x UO2/C circles = 4.07 g |
Wednesday, July 11, 2018, 17:44, John Wong, UO2/C, , TARGET BOAT, Done, Processing UC2Flk_21
|
Wednesday, July 11, 2018, 17:41
Cast prepared by Marla (see note in Hotlab)
Target boat contained about 50g UO2 powder. |
Saturday, September 29, 2018, 19:04, John Wong, UO2/C, , TARGET BOAT, In progress, Processing UC2_flk_22
|
Saturday, September 29, 2018, 18:52
Cast is from Jar#1. (see process sheet for details)
Target boat contains about 50g UO2 powder. |
Monday, October 22, 2018, 17:58, Marla Cervantes, UO2/C, 27252-1, TARGET BOAT, Problems, Processing UC2Flk_22
|
Monday, October 22, 2018, 17:55
UO2/C green was prepared , September 24, 2018
Initial UO2 powder used = 50.11 g (Inventory R-01032A, UO2 + bottle = 374.03 g |
Wednesday, October 24, 2018, 20:01, Marla Cervantes, UO2/C, 27252-1, TARGET BOAT, Problems, Processing UC2Flk_22
|
Marla Cervantes wrote:
Monday, October 22, 2018, 17:55 |
Thursday, October 25, 2018, 09:10, Marla Cervantes, UO2/C, 27252-1, TARGET BOAT, Done, Processing UC2Flk_22
|
Marla Cervantes wrote:
|
Thursday, November 22, 2018, 17:32, Marla Cervantes, UO2/C, 40202-1, TARGET BOAT, Problems, UCx Fully loaded graphite insert - UCx26
|
Thursday, November 22, 2018, 17:25
D-shaped discs were cut from cast #26
A 13mm punch was used to punch out discs from pre-cut strips |
Monday, November 26, 2018, 17:06, Marla Cervantes, UO2/C, 40202-1, TARGET BOAT, Done, UCx Fully loaded graphite insert - UCx26
|
Marla Cervantes wrote:
Thursday, November 22, 2018, 17:25 |
Monday, June 17, 2019, 08:58, Marla Cervantes, UO2/C, , TARGET BOAT, Done, UCx#27 Carbothermal reduction
|
Friday, June 14, 2019, 17:10
A 14 mm die was used to cut out discs from strips
The target consists of 236 discs of 10 cm in length - all single discs, no packs. |
Tuesday, July 30, 2019, 10:27, Marla Cervantes, UO2/C, , TARGET BOAT, Done, UCx#28 Carbothermal reduction
|
Friday, June 26, 2019, 17:10
A 13 mm die was used to cut out discs from strips
The target consists of 264 discs of 10 cm in length - all single discs, no packs. |
Wednesday, October 02, 2019, 11:10, Marla Cervantes, UO2/C, , TARGET BOAT, Done, UCx#29 Carbothermal reduction
|
Wednesday, October 02, 2019, 11:09
A graphite cartridge loaded with UO2/C foils, wrapped with three Ta heat shields was placed in the EVAP1.
The EVAP1 is currently pumping down. |
Monday, October 28, 2019, 11:23, Marla Cervantes, UO2/C, , TARGET BOAT, In progress, UCx#30 Carbothermal Reduction
|
Monday, October 28, 2019, 10:29
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets
The set up was installed in the EVAP1 and pumped dwon during the weekend. |
Thursday, October 31, 2019, 13:59, Marla Cervantes, UO2/C, , TARGET BOAT, Problems, UCx#30 Carbothermal Reduction
|
Marla Cervantes wrote:
Monday, October 28, 2019, 10:29 |
Thursday, January 30, 2020, 09:37, Marla Cervantes, UO2/C, P2N-02, , In progress, P2N target material carbothermal reduction
|
Wednesday, January 29 2020, 05:55
A P2N container with heat shields, and with a UO2/C loaded graphite container was
installed in the EVAP1 |
Thursday, January 30, 2020, 10:15, Marla Cervantes, UO2/C, P2N-02, , Problems, P2N target material carbothermal reduction
|
Marla Cervantes wrote:
Wednesday, January 29 2020, 05:55 |
|