Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, Page 4 of 15  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
IDdown Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  235   Wednesday, March 27, 2019, 08:56 Marla Cervantes 43630-6 DoneGraphite insert test 4 Wednesday, March 27, 2019, 08:50
A graphite insert was set into a
tantalum tube in the evaporator 2 for 3 days
  
  234   Tuesday, March 26, 2019, 08:58 Aaron Schmidt   MaintenanceRoughing pump oiled.Oiled as per work permit:     
  233   Thursday, March 21, 2019, 09:03 Aaron Schmidt   In progressEvap 1 pump down issueOn Tuesday it was noted that evaporator
1 was not pumping down properly. It was vented
and the seal & seal face wiped with a
  
  232   Monday, November 26, 2018, 17:06 Marla CervantesUO2/C40202-1TARGET BOATDoneUCx Fully loaded graphite insert - UCx26

    

       
            
 CR-UCx26.png 
  231   Thursday, November 22, 2018, 17:32 Marla CervantesUO2/C40202-1TARGET BOATProblemsUCx Fully loaded graphite insert - UCx26 Thursday, November 22, 2018, 17:25
D-shaped discs were cut from
 Nov23-CurrenTrip1.jpgNov23-CurrenTrip2.jpg 
  230   Wednesday, October 31, 2018, 15:23 Marla CervantesUC243044-7 LP-SISDoneUCx Fully loaded graphite insert thermal test - FL#1

    

       
            
 Ta-container.png 
  229   Wednesday, October 31, 2018, 10:30 Marla CervantesUC243044-7 LP-SISProblemsUCx Fully loaded graphite insert thermal test - FL#1

    

       
            
 current-trip_off.JPGepics.JPG 
  228   Tuesday, October 30, 2018, 10:17 Marla CervantesUC243044-7 LP-SISIn progressUCx Fully loaded graphite insert thermal test - FL#1 Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered
(e-log 420 Evaporator_2) 
 Heat_test.JPG 
  227   Thursday, October 25, 2018, 09:10 Marla CervantesUO2/C27252-1TARGET BOATDoneProcessing UC2Flk_22

    

       
            
  
  226   Wednesday, October 24, 2018, 20:01 Marla CervantesUO2/C27252-1TARGET BOATProblemsProcessing UC2Flk_22

    

       
            
 PowerSupply-TempLog.xlsxCT-2.jpg 
  225   Tuesday, October 23, 2018, 10:55 Marla CervantesUC2 LP-SISDoneConditioning UCx#25

    

       
            
 OrangeCoat.jpgIonizerTube.jpgClosedSide.jpg 
  224   Tuesday, October 23, 2018, 10:49 Marla CervantesUC2 LP-SISProblems resolvedConditioning UCx#25

    

       
            
  
  223   Tuesday, October 23, 2018, 10:24 Marla CervantesUC2 LP-SISProblemsConditioning UCx#25

    

       
            
  
  222   Monday, October 22, 2018, 17:58 Marla CervantesUO2/C27252-1TARGET BOATProblemsProcessing UC2Flk_22Monday, October 22, 2018, 17:55 
UO2/C green was prepared , September
 current-trip-1.jpgcurrent-trip-2.jpg 
  221   Thursday, October 11, 2018, 18:13 John WongUC2 LP-SISIn progressConditioning UCx#25Thursday, October 11, 2018, 18:06
Target consists of 284 UCx discs,
total packing length of 8.0 cm. 
 UC#25_conditioning.JPGUC#25_conditioning-450A.JPG 
  220   Saturday, September 29, 2018, 20:53 John WongUC241369-2 DoneUCx Fully loaded graphite insert thermal test - FL#1.2

    

       
            
  
  219   Saturday, September 29, 2018, 19:04 John WongUO2/C TARGET BOATIn progressProcessing UC2_flk_22Saturday, September 29, 2018, 18:52
Cast is from Jar#1.  (see process
sheet for details)
 striptool_capture.JPGTGHT_tripped.JPGpressure_limiting.JPG 
  218   Friday, September 21, 2018, 10:22 Anders MjosUC241369-2 DoneUCx Fully loaded graphite insert thermal test - FL#1.2


   
        
            
  
  217   Tuesday, September 04, 2018, 10:18 Marla CervantesUC241369-2 In progressUCx Fully loaded graphite insert thermal test - FL#1.2 Monday, September 03, 2018, 10:17
Graphite insert fully loaded
 180904-UCxFL1-T2-2.png 
  216   Friday, August 17, 2018, 11:23 Marla CervantesUC2NA DoneUCx 1-step casting -Oxidation test Friday, August 17, 2018, 11:17
Four discs of UCx produced with the
1-step casting method were placed in a glass
  
ELOG V2.9.2-2455