ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
167
|
Thursday, September 21, 2017, 11:35 |
Laura Lambert | Empty | | | Done | Testing TBHT [1st run!], RP [new oil] and IG [new gauge] | Thursday, September 21, 2017, 11:32
Copper plate attached to TBHT to allow current to be applied.
Started pumping down this a.m.
Roughing pump sounds normal.
Currently Ion Gauge times out before turning on, will attempt again later when lower vacuum achieved...
Monday, September 25, 2017, 13:30
Ion Gauge hadn't been fully hooked up via eipcs yet.
Ramped down last week/ vented/ hooked up ion gauge in epics/ restarted IOC - now updated and good to go.
Started pumping down again this a.m.
Roughing pump sounds normal.
Ion gauge working well!
IGP1 = 2.7e-5 Torr
Wednesday, September 27, 2017, 09:20
Cooled down, vented in air and opened up yesterday.
TBHT ran well - readout on power supply and readout on striptool were very close.
Roughing pump ran smoothly - nothing other than usual problems.
Sometimes when roughing pump is 1st turned on it chokes up and sounds TERRIBLE. At this point if you turn it off and leave it for a few seconds then try turning it on again it usually works fine.
Ion gauge ran well - direct readout vs striptool readout are slightly off because the direct readout is in mBar and the striptool in Torr.
One minor thing noticed with the new ion gauge - when water is turned on the vacuum increases very minorly by ~5e-8 Torr.
This wouldn't show up with the old Ion Gauge - maybe the new one is slightly more sensitive?
Otherwise everything ran great
|
170
|
Tuesday, November 07, 2017, 11:57 |
Laura Lambert | | | | Maintenance | Interlocks limits changed to 100mTorr | Tuesday, November 07, 2017, 11:55
Interlocks limits updated/ changed to 100mTorr for both TGHT and TBHT by Ray
|
171
|
Tuesday, November 07, 2017, 12:04 |
Laura Lambert | | | | Maintenance | Noise levels checked - ear protection not required. | Tuesday, November 07, 2017, 11:58
Noise levels were checked with monitor by Terry.
Max readings in lab reached ~83dB but sat between 70-78dB in most areas.
This is under limit for requirement to wear ear protection [85dB].
To reach limit - noise levels would need to increase drastically.
Conclusion: ear protection not required in lab.
Recommended if working in there for long periods of time for personal preference, but not a requirement.
|
174
|
Wednesday, November 22, 2017, 14:20 |
Laura Lambert | | | | Maintenance | New eye wash for hot lab! | Wednesday, November 22, 2017, 11:05
Eye wash installed yesterday, simple attachment on sink spout.
Easy to use, simply twist attachment 180 degrees.
Water for tap can be turned on before or after twist.
Adjust pressure/ temperature accordingly.
Auto shut-off for eye-wash at ~38C [100F] - no accidental eye-burning when trying to wash eyes!
|
212
|
Tuesday, June 26, 2018, 12:12 |
Aaron Schmidt | | | | Problems resolved | Gloves replaced. | Tuesday, June 26, 2018, 09:30. Gloves on evap 1 changed out.
The original right one was otrn. Left was o but worn. Both replaced with new gloves. |
216
|
Friday, August 17, 2018, 11:23 |
Marla Cervantes | UC2 | NA | | Done | UCx 1-step casting -Oxidation test | Friday, August 17, 2018, 11:17
Four discs of UCx produced with the 1-step casting method were placed in a glass jar.
The mass of the discs was 0.400 g.
The glass jar with the discs were placed in the heating chamber of the IEVAP.
Currently IEVAP is pumping down until vacuum is in the order of ~10^-6 Torr.
Friday, August 17, 2018, 16:28
Final vacuum: 9.5x10^-6 Torr
IEVAP's heating chamber will be vented with air and the materials will be taken out.
Friday, August 17, 2018, 17:27
Material was transferred to the glove box
|
217
|
Tuesday, September 04, 2018, 10:18 |
Marla Cervantes | UC2 | 41369-2 | | In progress | UCx Fully loaded graphite insert thermal test - FL#1.2 | Monday, September 03, 2018, 10:17
Graphite insert fully loaded with UCx was loaded into previously TaC coated target container.
No end caps on Ta target container.
Weight of graphite tube + UCx discs = 27.118 g
Currently pumping down in evap1.
Tuesday, September 04, 2018, 10:17
IGP1 = 4.02e-6 Torr
Tapped up TBHT and TGHT manually to 100 A @1 A/s with pauses of 20 s.
Wait for 40 min to pressure to stabilize.
Max pressure 1.38e-4 Torr.
Final pressure 5.93e-5 Torr.
Tuesday, September 04, 2018, 11:46
Good vacuum 5e-1 Torr
Bad vacuum 8e-1 Torr
Initiating auto ramp for TGHT @ 10 A/min to a max setpoint of 520 A
Initiating auto ramp for TBHT @ 5 A/min to a max setpoint of 245 A
Tuesday, September 04, 2018, 12:54
After achieving 520 A with auto ramp, manually tapped to 599 A.
Manually tapped back to 550 A.
|
218
|
Friday, September 21, 2018, 10:22 |
Anders Mjos | UC2 | 41369-2 | | Done | UCx Fully loaded graphite insert thermal test - FL#1.2 |
Marla Cervantes wrote: |
Monday, September 03, 2018, 10:17
Graphite insert fully loaded with UCx was loaded into previously TaC coated target container.
No end caps on Ta target container.
Weight of graphite tube + UCx discs = 27.118 g
Currently pumping down in evap1.
Tuesday, September 04, 2018, 10:17
IGP1 = 4.02e-6 Torr
Tapped up TBHT and TGHT manually to 100 A @1 A/s with pauses of 20 s.
Wait for 40 min to pressure to stabilize.
Max pressure 1.38e-4 Torr.
Final pressure 5.93e-5 Torr.
Tuesday, September 04, 2018, 11:46
Good vacuum 5e-1 Torr
Bad vacuum 8e-1 Torr
Initiating auto ramp for TGHT @ 10 A/min to a max setpoint of 520 A
Initiating auto ramp for TBHT @ 5 A/min to a max setpoint of 245 A
Tuesday, September 04, 2018, 12:54
After achieving 520 A with auto ramp, manually tapped to 599 A.
Manually tapped back to 550 A.
|
Friday, September 21, 2018, 10:21
Ramping down heaters at 2 A/min and 1 A/min for TGHT and TBHT. |
220
|
Saturday, September 29, 2018, 20:53 |
John Wong | UC2 | 41369-2 | | Done | UCx Fully loaded graphite insert thermal test - FL#1.2 |
Marla Cervantes wrote: |
Monday, September 03, 2018, 10:17
Graphite insert fully loaded with UCx was loaded into previously TaC coated target container.
No end caps on Ta target container.
Weight of graphite tube + UCx discs = 27.118 g
Currently pumping down in evap1.
Tuesday, September 04, 2018, 10:17
IGP1 = 4.02e-6 Torr
Tapped up TBHT and TGHT manually to 100 A @1 A/s with pauses of 20 s.
Wait for 40 min to pressure to stabilize.
Max pressure 1.38e-4 Torr.
Final pressure 5.93e-5 Torr.
Tuesday, September 04, 2018, 11:46
Good vacuum 5e-1 Torr
Bad vacuum 8e-1 Torr
Initiating auto ramp for TGHT @ 10 A/min to a max setpoint of 520 A
Initiating auto ramp for TBHT @ 5 A/min to a max setpoint of 245 A
Tuesday, September 04, 2018, 12:54
After achieving 520 A with auto ramp, manually tapped to 599 A.
Manually tapped back to 550 A.
|
Saturday, September 29, 2018, 20:52
Target is taken out from the chamber and transferred to the Ar glove box.
|
233
|
Thursday, March 21, 2019, 09:03 |
Aaron Schmidt | | | | In progress | Evap 1 pump down issue | On Tuesday it was noted that evaporator 1 was not pumping down properly. It was vented and the seal & seal face wiped with a cloth. The initial pump down rate was faster, however after 48 hrs, it has still not pumped down to appropriate levels.
Thursday, March 21, 2019, 08:59: IV1 closed & TP1 off. |
234
|
Tuesday, March 26, 2019, 08:58 |
Aaron Schmidt | | | | Maintenance | Roughing pump oiled. | Oiled as per work permit: I2019-03-26-2.
Tuesday, March 26, 2019, 08:53: Start RP1
Tuesday, March 26, 2019, 09:03: Holding at 0.303T on CG2.
Tuesday, March 26, 2019, 09:10: Turned off RP1. Vent chamber slightly. Close VV1. Restarted RP1.
Open RV1.
Tuesday, March 26, 2019, 09:13: Vacuum stalls out at approx 0.300T.
Tuesday, March 26, 2019, 09:16: Shut off RP1. Contact Vacuum group.
Checked as per work permit: I2019-03-26-5
Tuesday, March 26, 2019, 13:50: Filter checked. OK
Tuesday, March 26, 2019, 14:00: Tees checked. OK.
Tuesday, March 26, 2019, 14:05: Line / bellows. Fail
Tuesday, March 26, 2019, 14:11: New line / bellows. OK
Tuesday, March 26, 2019, 14:19: TP1 on, IV1 opened. Vacuum @ 3.5e-05T and dropping.
Pumping down evap1. Dispose of the old line. Replacement successful. No contamination was found on the swipes.
Tuesday, March 26, 2019, 14:36: Vacuum @ 1.12e-05T and dropping. |
235
|
Wednesday, March 27, 2019, 08:56 |
Marla Cervantes | | 43630-6 | | Done | Graphite insert test 4 | Wednesday, March 27, 2019, 08:50
A graphite insert was set into a tantalum tube in the evaporator 2 for 3 days
The objective of the test was to determine the current and voltage required to reach 2000 C
Current 424.2 A, voltage 7.17 V, P = 3 kW
details can be find here https://elog.triumf.ca/TIS/Evaporator_2/433
The test will continue for 2 weeks in the EVAP1.
Good vacuum 5e-4 Torr
Bad vacuum 1.00e-4
Pressure IGP1 = 1.55e-6 Torr
The autoramp was set to 420 A, at 1 A/min,
Monday, April 01, 2019, 07:57
TGHT = 4.68 V, 424.32 A
IGP1 = 9.61e-7 Torr
Autoramop is set to -1 A/min to 0 A
Monday, April 01, 2019, 11:19
IGP1=5.43e-7 Torr
At TGHT = 223 A and 2.1 V the autoramp was increased to -2 A/min
Monday, April 01, 2019, 11:20
Sudden and unexpected pressure increment to 1.4e-5 Torr, might be a glitch.
Monday, April 01, 2019, 13:10
IGP1 = 4.34e-7Torr
The autoramp was stopped at TGHT = 17.28 A, 0.0625 V,
and it was lower down to 0 A manually
Results: The tantalum tube deformed in the contact points with the graphite insert |
236
|
Friday, April 05, 2019, 10:08 |
Marla Cervantes | | 43630-3 | | Done | TaC coating/sintering for graphite insert test | Friday, April 05, 2019, 10:04
A tantalum tube was coated with TaC and wrapped with Ta heat-shield (3 layers)
Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max).
Yesterday the tube was set in the EVAP1 and pumped down.
Friday, April 05, 2019, 10:07
IGP1= 1.61e-6 Torr
The current is manually tapped to 40 A.
Friday, April 05, 2019, 13:25
After ~2 hours
IGP1 = 1.54e-6 Torr
TGHT = 0.61 V, 40.39 A
Autoramp is set to 1 A/min to 400 A
Good vac at 3.00-5 Torr
Bad vac at 5.0e-5 Torr.
Sunday, April 07, 2019, 9:00
The current was increased to 424 A
Monday, April 08, 2019, 16:36
EVAP1 vented with air, sintered tube was removed. |
237
|
Wednesday, April 10, 2019, 13:38 |
Marla Cervantes | | 43630-3 | | Done | Graphite insert test #6 | Wednesday, April 10, 2019, 13:30
Tantalum foil caps were added to a graphite insert (see picture caps)
The insert was set in a tantalum tube previously coated and wrapped with 3 Ta sheets.
The system was installed in the EVAP1, and it will be heated for a week at 2000 C.
Currently pumping down.
Thursday, April 11, 2019, 13:26
IGP1 = 9.9e-7 Torr
The current is tapped to 40 A
After 1hr the autoramp is set to 1 A/min to TGHT 500 A
The TGHT current remained at 500 A for week
until at April 18 at ~4:30 pm
a localized power outage tripped the EVAP1.
The EVAP1 was ventd with air and the tantalum tube was removed
The tantalum tube did not break. |
238
|
Friday, May 24, 2019, 15:25 |
Marla Cervantes | | 43943-1 | | Done | Graphite insert test - FOILS | Friday, May 24, 2019, 15:04
A TaC coated tantalum tube, loaded with graphite foils was transferred to EVAP1
https://elog.triumf.ca/TIS/Evaporator_2/445
The tueb will be heated with the same power used in EVAP2,
the power of the EVAP2 and EVAP1 will be matched using the fit from Document-126503
The chamber is currently pumping down
Monday, May 27, 2019, 08:58
The current will be tapped to 50 A to replicate the procedure of EVAP2
then the current will be set to 1 A/min to 500 A and increased to match with EVAP2 power.
|
250
|
Tuesday, November 05, 2019, 14:50 |
Aaron Schmidt | | | | Maintenance | Fallen Bolt. | One of the TBHT bolts fell out of reach and may be sitting on the isolation valve or TP.
Remove TP as per WP: I2019-11-05-9
Tuesday, November 05, 2019, 14:48: Completed. Found 2 TBHT bolts, a broken insulator, one small vented screw, and a piece of rubber.
Turbo pump mesh clear. Magnetic grabbing tool left in Evap 1 to potentially pickup / grab materials before they fall down the hole if needed. The tip of the tool is contaminated.
Tuesday, November 05, 2019, 15:03: Evap 1 pumped down. TP1 started, IV1 opened. Ok.
|
252
|
Wednesday, January 22, 2020, 18:10 |
Marla Cervantes | Empty | P2N-02 | | Done | P2N test#1 | The assembly consists of two tantalum foils, 0.001" thick, which are radially crimped to form a cylindrical surface. The outside support are two P2N conditioning legs, and the inside supports are tantalum tapered rings. The solidworks geometry for this test is ITD0811 in PDM.
A first current ramp up to 600 amperes on the bare naked target is attempted to benchmark the current/voltage increase in a bare target, so that we have reference values for future rampings with graphite and target material inside.
Wednesday, January 22, 2020, 18:07
A P2N container with no heat shields, and no graphite container was installed in the EVAP1
Chamber is currently being evacuated.
Thursday, January 23, 2020, 09:45
Pressure IGP1=1.87e-6 Torr
Final desired current TGHT = 600 A
Manually tapped to 40 A
The voltage looks ok, at 32 A the voltage's behavior change (see picture "voltage at 32 A") but is stable
Thursday, January 23, 2020, 13:20
Autoramp is set to 4/30s to 300 A
The voltage and vacuum were stable so the autoramp was kept at 4/30s and the final current was set to 600 A
At 600 A the voltage was 2.4 V, the current and voltage remained stable for 1 hour (see figures 600A and 600A-zoomed)
Thursday, January 23, 2020, 15:57
The current was ramp down to 0 A at -5A/20s
Thursday, January 23, 2020, 16:36
After 10 min at 0A, the current was ramp up to 600 A at 4A/30s.
At 600 A the voltage was 2.43 V (TGHT)
The container was left at 600 A overnight.
Friday, January 24, 2020, 10:51
The PN2 stayed at 600 A for 15 hrs
The voltage increased 0.1 V during the first 7hr at 600 A and then it stabilized at 2.5 V (see figure "second ramp voltage")
Friday, January 24, 2020, 10:57
The current was ramp down to 0A at -5A/20s
|
253
|
Wednesday, January 29, 2020, 10:11 |
Marla Cervantes | Empty | P2N-02 | | Done | P2N test#2 | The assembly consists of two tantalum foils, 0.001" thick, which are radially crimped to form a cylindrical surface. The outside support are two P2N conditioning legs, and the inside supports are tantalum tapered rings. The solidworks geometry for this test is ITD0811 in PDM.
The P2N is attached to EVAP1 with copper legs and copper shims. A current ramp up to 600 A on the target wrapped with heat shields is attempted to benchmark the current/voltage increase in a bare target, so that we have reference values for future rampings with graphite and target material inside.
The heat shields consist on two layers of Ta sheets on the body of the P2N secured with Ta-wire and two layers of Ta sheets on one side of the P2N.
Tuesday, January 28, 2020, 10:11
A P2N container with heat shields, and without graphite container was installed in the EVAP1
Chamber is currently being evacuated.
Wednesday, January 29, 2020, 10:12
Pressure IGP1=1.87e-6 Torr
Final desired current TGHT = 600 A
Manually tapped to 40 A.
Voltage increased accordingly in an stable way.
Wednesday, January 29, 2020, 10:33
Autoramp is set to 3/30s to 300 A
The voltage and vacuum were stable so the autoramp was kept at 4/30s and the final current was set to 600 A
Accidentally went up to 600 A (1.98 V)!
When updating autoramp to 600 A, did not realize that procedure status was Active.
NOTE: If the procedure status is "active" the heater autoramp, does not "ramp" the current input in "final value", it will go in one step to that current.
The current was manually ramp down to 300 A
TGHT=299.52A, 0.89 V
Wednesday, January 29, 2020, 13:25
After approximately 2 hours conditions IGP1=1.6e-6Torr, TGHT =300 A, 1V.
The current ramp was started again: 4A/30s to final value of 600 A
Wednesday, January 29, 2020, 14:07
After 15 min, TGHT=599.424A, and 1.983 V (unstable) (see figure "P2N-test2_final voltage")
The current was ramp down to 0 A at -5A/20s
EVAP1 was vented with aair and the container was removed,
the copper shims and legs did not present signs of damage
the body's tantalum sheet had wrinkles inside,
the tantalum foils unfasten a bit, but were adjusted. |
254
|
Thursday, January 30, 2020, 09:37 |
Marla Cervantes | UO2/C | P2N-02 | | In progress | P2N target material carbothermal reduction | Wednesday, January 29 2020, 05:55
A P2N container with heat shields, and with a UO2/C loaded graphite container was installed in the EVAP1
Chamber is currently being evacuated.
Thursday, January 30, 2020, 08:56
Pressure limits:
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
Initial pressure:
IGP1=1.52e-6Torr
Current ramp set to 1A/min to 10 A, voltage is stable.
Current ramp increased to 1A/10s to 100 A. The pressure started raising around 80 A.
Current was kept 5min at at 100 A, voltage was stable
Thursday, January 30, 2020, 09:32
Current ramp set to 1A/20s to 150 A (same pressure limits)
Pressure keep increasing during heating
Thursday, January 30, 2020, 09:53
Current was kept at 150 min during 5 min, the voltage is stable, pressure started to stabilize:
IGP1 = 0.027 Torr
TGHT = 0.418 V
Ramp set to 1A/min to 200 A.
Thursday, January 30, 2020, 10:02
Pressure decreasing:
TGHT= 153 A |
255
|
Thursday, January 30, 2020, 10:15 |
Marla Cervantes | UO2/C | P2N-02 | | Problems | P2N target material carbothermal reduction |
Marla Cervantes wrote: |
Wednesday, January 29 2020, 05:55
A P2N container with heat shields, and with a UO2/C loaded graphite container was installed in the EVAP1
Chamber is currently being evacuated.
Thursday, January 30, 2020, 08:56
Pressure limits:
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
Initial pressure:
IGP1=1.52e-6Torr
Current ramp set to 1A/min to 10 A, voltage is stable.
Current ramp increased to 1A/10s to 100 A. The pressure started raising around 80 A.
Current was kept 5min at at 100 A, voltage was stable
Thursday, January 30, 2020, 09:32
Current ramp set to 1A/20s to 150 A (same pressure limits)
Pressure keep increasing during heating
Thursday, January 30, 2020, 09:53
Current was kept at 150 min during 5 min, the voltage is stable, pressure started to stabilize:
IGP1 = 0.027 Torr
TGHT = 0.418 V
Ramp set to 1A/min to 200 A.
Thursday, January 30, 2020, 10:02
Pressure decreasing:
TGHT= 153 A
|
Thursday, January 30, 2020, 10:15
At 155 A while pressure decreasing, the power supply tripped off,
Controls has been notified, waiting for instructions.
|
|