ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
13
|
Thursday, April 14, 2011, 09:53 |
John Wong | Empty | 37810-1 | HP-FEBIAD | Done | Fins Diffusion bonding | Thu Apr 14 09:52:59 2011: Target is wrapped
with 3-Ta heat shield and ready to go into
the evaporator. |
|
15
|
Thursday, April 14, 2011, 17:03 |
John Wong | Empty | 38481-7 | HP-FEBIAD | Problems resolved | Evap. bolt/washer problems & solutions | Thu Apr 14 14:03:17 2011:
What did we see after the fin diffusion bonding
of Ta fins for FEBIAD-HP (w.o#38481-7) |
6x |
16
|
Monday, April 18, 2011, 18:14 |
John Wong | Empty | 38295-8 | HP-FEBIAD | Problems | Sintering target oven coated with TaC | Mon Apr 18 18:10:53 2011:
FEBIAD-HP target (w.o 38295-8) is
coated with TaC (previously prepared on Feb |
|
17
|
Wednesday, April 20, 2011, 16:42 |
John Wong | Empty | 38481-8 | HP-FEBIAD | Done | Sintering target oven coated with TaC | Wed Apr 20 16:39:46 2011: Target
oven was coated with TaC early today.
The target was allowed to dry and then wrapped |
|
18
|
Monday, May 09, 2011, 16:10 |
John Wong | Empty | 38817-1 | HP-SIS | Done | Diffusion bonding of Ta Fins | Mon May 9 16:09:35 2011: Target
is wrapped with 3 Ta heatshields and the
evaporator is begin pumped down. |
|
19
|
Tuesday, May 10, 2011, 14:58 |
John Wong | Empty | 38817-2 | HP-SIS | Done | Diffusion bonding of Ta Fins for HP-SIS (w.o#38817-2) | Tue May 10 14:56:05 2011: Target
is wrapped with 3 heat-shields. The
evaporator is pumping down, vac @ 4.72e-6 |
|
25
|
Monday, July 18, 2011, 15:55 |
John Wong | Empty | 38634-3 | LP-SIS | Done | Sintering TaC coating for UCx#2 | Monday, July 18, 2011, 15:53: Target
oven was coated with TaC and let dry over
the weekend. The target is now installed |
|
27
|
Wednesday, August 03, 2011, 17:16 |
John Wong | Empty | 38634-8 | LP-SIS | Done | Sintering TaC coating | Wednesday, August 03, 2011, 20:27 : Target
was wrapped with 3 new Ta-heat shields and
2 around the back block. The tar from |
|
29
|
Monday, August 29, 2011, 11:21 |
John Wong | Empty | 38634-6 | LP-SIS | Done | Sintering TaC coating oven for TaC#1 | Monday, August 29, 2011, 13:16: Target
oven was coated with TaC and let dry over
night. The target oven is in the evaporator |
|
30
|
Tuesday, August 30, 2011, 09:31 |
Anders Mjos | Empty | Target Boat | LP-SIS | Done | Sintering of End Caps | Tuesday, August 30, 2011, 09:29: Target
Boat wrapped with 3 Ta heat shields. 6 D-End
Caps and 6 End Caps coated with TaC. Pumping |
|
31
|
Tuesday, August 30, 2011, 16:30 |
John Wong | Empty | Target Boat | LP-SIS | Done | Sintering of End Caps |
|
|
32
|
Tuesday, September 06, 2011, 17:05 |
John Wong | Empty | 38634-6 | LP-SIS | Done | Sintering TaC coating oven for TaC#1 |
|
|
33
|
Wednesday, September 07, 2011, 13:33 |
John Wong | Empty | | | Maintenance | Changed Evaporator#1 Backing Pump oil | Wednesday, September 07, 2011, 11:18:
IEVAP:CG2 @ 52mT before oil change.
Edi D.V changed the oil for the backing |
|
35
|
Wednesday, September 07, 2011, 15:40 |
Anders Mjos | Empty | | | Maintenance | Re-sealing of Glove Box | 2011-09-01:
Glove box was leaking
(air/argon) between base and box. Light was |
|
36
|
Friday, September 09, 2011, 10:05 |
John Wong | Empty | | HP-FEBIAD | Done | Sintering TaC coating | Friday, September 09, 2011, 10:05
Target oven coated with TaC, and
wrapped with 3-Ta heat shields. Chamber |
|
37
|
Monday, September 12, 2011, 13:08 |
John Wong | Empty | Target Boat | | Done | Sintering TaC coating on End Caps | Monday, September 12, 2011, 13:07
Target boat is loaded with coated
TaC end caps for sintering. Target |
|
39
|
Wednesday, September 21, 2011, 13:23 |
John Wong | Empty | 38634-10 | LP-SIS | Done | Sintering TaC coating on target oven for UCx#3 | Wednesday, September 21, 2011, 13:23
Target oven was wrapped with 3-Ta
heatshields including the back block. |
|
40
|
Thursday, September 22, 2011, 20:34 |
John Wong | Empty | 38634-9 | LP-SIS | Done | Sintering TaC coating for UCx#2 (spare) | Thursday, September 22, 2011, 20:21
Target oven was wrapped with 3 Ta-heat
shields and has been pumping down. |
|
46
|
Thursday, April 05, 2012, 16:47 |
John Wong | Empty | 38817-3 | HP-SIS | Done | Coating target oven /w TaC & sintering | Thursday, April 05, 2012, 16:43
Target oven is coated with TaC.
The oven is wrapped with 3 Ta-heat shields. |
|
80
|
Friday, October 04, 2013, 15:56 |
John Wong | Empty | | LP-SIS | Done | Ignore this entry - Process was done in Evap2 | Friday, October 04, 2013, 15:37
A LP target container is coated with
TaC. The container is wrapped with |
|