Entry  Tuesday, April 12, 2011, 10:30, John Wong, Empty, 38481-5, HP-FEBIAD, Done, Fins diffusion bonding  grab.s31535.pnggrab.c31573.pngcooling_down.jpg
Tue Apr 12 10:29:38 2011:  Target wrapped with 3 Ta-heat shields.  Evaporator is currently being pumped down.
Tue Apr 12 15:03:55 2011:  Evaporator has been pumped down for over 4 hrs.  Set TGHT @ 20A/ 0.066V, Vac @ 2.46e-6 Torr. (See Attachment#1
pumping down process).
Entry  Wednesday, April 13, 2011, 10:37, John Wong, Empty, 38481-7, HP-FEBIAD, Done, Diffusion bonding of Ta Fins for FEBIAD-HP pumping_down.jpgAutoheating_parameter_setup.jpgcooling_down.jpgwasher_on_target_leg.jpg
Wed Apr 13 10:37:25 2011:  Target is wrapped with 3 Ta-heat shields.  Evaporator is currently being pumped down.
Wed Apr 13 15:28:02 2011:  Evaporator has been pumped down for over 5 hrs.  Vac @ 2.38e-6 Torr.  (See attachment1: Pumping process)
Wed Apr 13 15:29:21 2011: Set TGHT @ 20A/0.074V, Vac 2.98e-6 Torr.
Entry  Thursday, April 14, 2011, 09:53, John Wong, Empty, 37810-1, HP-FEBIAD, Done, Fins Diffusion bonding  cooling_down.jpg
Thu Apr 14 09:52:59 2011: Target is wrapped with 3-Ta heat shield and ready to go into the evaporator. 
Thu Apr 14 11:57:29 2011: The process is on hold until the problem with the screw and the washer of the evaporator is resolved.  See
ID#15 for more details. 
Entry  Thursday, April 14, 2011, 17:03, John Wong, Empty, 38481-7, HP-FEBIAD, Problems resolved, Evap. bolt/washer problems & solutions 6x
 Thu Apr 14 14:03:17 2011:  What did we see after the fin diffusion bonding of Ta fins for FEBIAD-HP (w.o#38481-7) ? : 
1.  A problem occurred during the FEBIAD HP Ta fin diffusion  bonding and was  discovered after the evaporator chamber was opened. 
The  washer was  "wielded" on to the left leg of the target (see attachment  #1: washer  on target leg).  
Entry  Monday, April 18, 2011, 18:14, John Wong, Empty, 38295-8, HP-FEBIAD, Problems, Sintering target oven coated with TaC pumping_down.jpgAutoheating_parameter_setup.jpgvac_curve.jpgoverall_process.jpgoverall_process_2.jpg
Mon Apr 18 18:10:53 2011: 
FEBIAD-HP target (w.o 38295-8) is coated with TaC (previously prepared on Feb 15, 2011).  This target will be used for the SiC run in Oct,
2011.  The target is wrapped with 3 Ta-heat shields and is in the evaporator.  Pumping down of the evaporator is in process, currently vac @
Entry  Wednesday, April 20, 2011, 16:42, John Wong, Empty, 38481-8, HP-FEBIAD, Done, Sintering target oven coated with TaC overall_process.jpg
Wed Apr 20 16:39:46 2011:  Target oven was coated with TaC early today.  The target was allowed to dry and then wrapped with 3 Ta heat-shields. 
The target is in the evaporator and it is being pumped down.  Vac is currently at 9.48e-6 Torr. 
Wed Apr 20 17:51:12 2011 : TGHT @ 60A/0.225V, Vac @ 5.98e-6 Torr. 
Entry  Monday, May 09, 2011, 16:10, John Wong, Empty, 38817-1, HP-SIS, Done, Diffusion bonding of Ta Fins TGHT_ramping_up.gifoverall_process.jpg
Mon May  9 16:09:35 2011:  Target is wrapped with 3 Ta heatshields and the evaporator is begin pumped down.
Mon May  9 17:59:57 2011:  Vac is @ 1.33e-5 Torr.  TGHT was stepped up to 60A before starting the auto heating process (See Attachment#1:
TGHT_ramping_up).   Note: Although the vacuum is at low e-5 torr, this should be fine to start the TGHT because it takes a while to heat up
Entry  Tuesday, May 10, 2011, 14:58, John Wong, Empty, 38817-2, HP-SIS, Done, Diffusion bonding of Ta Fins for HP-SIS (w.o#38817-2)  starting_process.jpgoverall_process.gif
Tue May 10 14:56:05 2011:  Target is wrapped with 3 heat-shields.  The evaporator is pumping down, vac @ 4.72e-6 Torr.  TGHT was raised
to 60A/0.239V.  Auto heating will being now; THGT will be ramped up to 820A @ 2A/min. (See Attachment#1: Staring_process)
Wed May 11 10:16:03 2011: Auto cooling was started by ISAC Ops' help.  TGHT has ramped down to zero.  The p/s will be turned off and
Entry  Monday, July 18, 2011, 15:55, John Wong, Empty, 38634-3, LP-SIS, Done, Sintering TaC coating for UCx#2 striptool.jpg
 Monday, July 18, 2011, 15:53:  Target oven was coated with TaC and let dry over the weekend.  The target is now installed in the evaporator
and currently being pumped down.  No Ta-heat shields are required for LP target ovens. 
Wednesday, July 20, 2011, 11:42:  Evaporator had to be vented to remove the target because Ta-heat shields were actually required for UCx
Entry  Wednesday, August 03, 2011, 17:16, John Wong, Empty, 38634-8, LP-SIS, Done, Sintering TaC coating  striptool.JPG
Wednesday, August 03, 2011, 20:27 :  Target was wrapped with 3 new Ta-heat shields and 2 around the back block.  The tar from the previous
UCx conditioning remained in the chamber was removed and cleaned.  Chamber is currently being pumped down, vac currently @ 8.3 e-6 Torr. 
Wednesday, August 03, 2011, 21:01:  Begin to step up TGHT, currently vac @ 7.5e-6 Torr.
Entry  Monday, August 29, 2011, 11:21, John Wong, Empty, 38634-6, LP-SIS, Done, Sintering TaC coating oven for TaC#1 TaC_target_oven.JPG
 Monday, August 29, 2011, 13:16: Target oven was coated with TaC and let dry over night.  The target oven is in the evaporator and currently
being pumped down.  
Monday, August 29, 2011, 15:12: Currently vac @ 8.41e-6 torr. 
Entry  Tuesday, August 30, 2011, 09:31, Anders Mjos, Empty, Target Boat, LP-SIS, Done, Sintering of End Caps 
Tuesday, August 30, 2011, 09:29: Target Boat wrapped with 3 Ta heat shields. 6 D-End Caps and 6 End Caps coated with TaC. Pumping down - vac at 3.6e-5
torr.
Tuesday, August 30, 2011, 10:35: Stepped heater up to 100 A. Vacuum tripped heater. Stepped back up to 80 A then 70 A. Vac at 4.5e-5 torr.
    Reply  Tuesday, August 30, 2011, 16:30, John Wong, Empty, Target Boat, LP-SIS, Done, Sintering of End Caps 


    
        
            Anders Mjos wrote:
        
        
            
            Tuesday, August 30, 2011, 09:29: Target Boat wrapped with 3 Ta heat shields. 6 D-End Caps and 6 End
    Reply  Tuesday, September 06, 2011, 17:05, John Wong, Empty, 38634-6, LP-SIS, Done, Sintering TaC coating oven for TaC#1 striptool.JPG


    
        
            John Wong wrote:
        
        
            
             Monday, August 29, 2011, 13:16: Target oven was coated with TaC and let dry over night.  The target oven
Entry  Wednesday, September 07, 2011, 13:33, John Wong, Empty, , , Maintenance, Changed Evaporator#1 Backing Pump oil  
Wednesday, September 07, 2011, 11:18:  
IEVAP:CG2 @ 52mT before oil change. 
Edi D.V changed the oil for the backing pump.  WP#2011-09-07-2. CG2 currently @ 21mT.
Entry  Wednesday, September 07, 2011, 15:40, Anders Mjos, Empty, , , Maintenance, Re-sealing of Glove Box 
2011-09-01:

    Glove box was leaking (air/argon) between base and box. Light was shining through.
    Removed old neoprene seal at base.

   Resealed glove box between base and box with DAP Butylflex. No light shining through after repair.
    Replaced rubber disks at 4 feed-throughs.
Entry  Friday, September 09, 2011, 10:05, John Wong, Empty, , HP-FEBIAD, Done, Sintering TaC coating striptool.JPG
Friday, September 09, 2011, 10:05
Target oven coated with TaC, and wrapped with 3-Ta heat shields.  Chamber is currently being pumped down. 
TGHT @ 140A, IG 9.2 e-6 Torr, BP 20mT. 
Entry  Monday, September 12, 2011, 13:08, John Wong, Empty, Target Boat, , Done, Sintering TaC coating on End Caps striptool.JPG
Monday, September 12, 2011, 13:07
Target boat is loaded with coated TaC end caps for sintering.  Target boat is wrapped with 3 Ta-heat shields. 
Max TGHT = 580A
Entry  Wednesday, September 21, 2011, 13:23, John Wong, Empty, 38634-10, LP-SIS, Done, Sintering TaC coating on target oven for UCx#3  archiver_TGHT0-580A.JPG
Wednesday, September 21, 2011, 13:23
Target oven was wrapped with 3-Ta heatshields including the back block. 
Target is in the chamber and currently being pumped down.
Entry  Thursday, September 22, 2011, 20:34, John Wong, Empty, 38634-9, LP-SIS, Done, Sintering TaC coating for UCx#2 (spare) 
 Thursday, September 22, 2011, 20:21
Target oven was wrapped with 3 Ta-heat shields and has been pumping down.
IG currently @ 3.2e-6 Torr, BP @ 25mT. 