Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, Page 11 of 15  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Target Material Target Oven W.O#down Source Status Subject Text Attachments
  9   Friday, April 08, 2011, 14:55 John WongEmpty38295-8HP-FEBIADDoneFins diffusion bonding Fri Apr  8 14:51:37 2011:  Target
is wrapped with 3 Ta-heat shields. 
The evaporator has been pumped down for over
 pumping_down.jpgAutoheating_parameter_setup.jpgcooling_down.jpg 
  16   Monday, April 18, 2011, 18:14 John WongEmpty38295-8HP-FEBIADProblemsSintering target oven coated with TaCMon Apr 18 18:10:53 2011: 
FEBIAD-HP target (w.o 38295-8) is
coated with TaC (previously prepared on Feb
 pumping_down.jpgAutoheating_parameter_setup.jpgvac_curve.jpgoverall_process.jpgoverall_process_2.jpg 
  22   Wednesday, May 18, 2011, 13:13 John WongSiC38295-8HP-FEBIADProblemsOrganics burnoff & Sintering Wed May 18 13:12:24 2011:  Target
is wrapped with 3 Ta-heat shields and is
installed in the evaporator which is being
 6x 
  8   Wednesday, April 06, 2011, 17:07 John WongEmpty37978-1HP-FEBIADDoneFins diffusion bonding Wed Apr  6 17:06:56 2011: Target oven is
wrapped with 3 Ta-heat shields.  Pumping
down evaporator in progress.
 pumping_down.jpgAutoheating_parameter_setup.jpgcooling_down.jpg 
  13   Thursday, April 14, 2011, 09:53 John WongEmpty37810-1HP-FEBIADDoneFins Diffusion bonding Thu Apr 14 09:52:59 2011: Target is wrapped
with 3-Ta heat shield and ready to go into
the evaporator. 
 cooling_down.jpg 
  222   Monday, October 22, 2018, 17:58 Marla CervantesUO2/C27252-1TARGET BOATProblemsProcessing UC2Flk_22Monday, October 22, 2018, 17:55 
UO2/C green was prepared , September
 current-trip-1.jpgcurrent-trip-2.jpg 
  226   Wednesday, October 24, 2018, 20:01 Marla CervantesUO2/C27252-1TARGET BOATProblemsProcessing UC2Flk_22

    

       
            
 PowerSupply-TempLog.xlsxCT-2.jpg 
  227   Thursday, October 25, 2018, 09:10 Marla CervantesUO2/C27252-1TARGET BOATDoneProcessing UC2Flk_22

    

       
            
  
  130   Tuesday, April 19, 2016, 10:48 Laura LambertUC2*** Done***ALL FUTURE UCx TARGETS*** Tuesday, April 19, 2016, 09:47
Temperature measurements have been
taken in evap2 on target containers. 
  
  1   Wednesday, March 23, 2011, 18:23 John Wong    Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4)March 23, 2011
12:30: Target oven is wrapped with
3 Ta-heat shields.  Pumping down evaporator
 grab.K18246.pnggrab.g20718.pnggrab.r27097.pnggrab.t30095.png 
  2   Friday, March 25, 2011, 17:22 John Wong    Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4)

    
        
  
  3   Monday, March 28, 2011, 11:20    HP-FEBIADDoneDiffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4)
  
  5   Tuesday, March 29, 2011, 10:20     ProblemsLoss of cooling waterAccording to Jonathan Aoki, the electricians
will be servicing another MCC which will
result in loss of cooling water for about
  
  6   Tuesday, March 29, 2011, 10:30     DoneLoss of cooling water updateIt's the NON-ACTIVE water that will go
off.  The evaporator is on sity water,
so it will be OK.
  
  21   Tuesday, May 17, 2011, 16:43 John Wong   MaintenanceEvaporator Ion gauge replaced The evaporator ion gauge filament burnt
out on May 11, 2011.  A target was in
the evaporator at that time and was about
  
  33   Wednesday, September 07, 2011, 13:33 John WongEmpty  MaintenanceChanged Evaporator#1 Backing Pump oil Wednesday, September 07, 2011, 11:18:  
IEVAP:CG2 @ 52mT before oil change. 
Edi D.V changed the oil for the backing
  
  35   Wednesday, September 07, 2011, 15:40 Anders MjosEmpty  MaintenanceRe-sealing of Glove Box2011-09-01:

    Glove box was leaking
(air/argon) between base and box. Light was
  
  36   Friday, September 09, 2011, 10:05 John WongEmpty HP-FEBIADDoneSintering TaC coatingFriday, September 09, 2011, 10:05
Target oven coated with TaC, and
wrapped with 3-Ta heat shields.  Chamber
 striptool.JPG 
  52   Tuesday, June 12, 2012, 14:43 John Wong   MaintenanceChanging backing pump oil Tuesday, June 12, 2012, 14:38
The backing pump oil was changed
(ISAC WP#2012-06-12-1). 
  
  80   Friday, October 04, 2013, 15:56 John WongEmpty LP-SISDoneIgnore this entry - Process was done in Evap2Friday, October 04, 2013, 15:37
A LP target container is coated with
TaC.  The container is wrapped with
  
ELOG V2.9.2-2455